Summary
PL2021417
Pixius Lee's Summit - Tower Co-Locate
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/21/2021
WEST PRYOR OWNERS ASSOCIATION INC
Locations
Contacts
WEST PRYOR OWNERS ASSOCIATION INC, Address:7200 W 132ND ST STE 109  
Scott Ready, Phone: 8169691225  
Amber Reilmann, Address:9711 Fuesser Rd., Phone:(618) 979-7790  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 01/21/2022 01/21/2022
Hector Soto Jr.
Planning Review No Comments 01/10/2022 01/21/2022
Hector Soto Jr.
Corrective Action Required
01/11/2022

Provide documentation that the five (5) deficiencies identified on page 1 of the tower inspection report have been corrected. Approval of the final development plan application cannot be granted until all of the issues have been abated.
Building Codes Review Approved with Conditions 01/21/2022 01/13/2022
Scott Ready
Miscellaneous Correction
Corrective Action Required
01/13/2022

An electrical building permit will be required if the proposed electric service is to be installed.
Traffic Review No Comments 01/21/2022 01/13/2022
Scott Ready
Fire Review No Comments 01/21/2022 01/13/2022
Scott Ready
Engineering Review No Comments 01/21/2022 01/13/2022
Scott Ready
Engineering Review No Comments 01/10/2022 01/03/2022
Loic Nguinguiri, E.I.
Fire Review No Comments 01/10/2022 01/03/2022
Scott Ready
Building Codes Review Approved with Conditions 01/10/2022 01/03/2022
Scott Ready
Miscellaneous Correction
Corrective Action Required
01/03/2022

An electrical building permit will be required if the proposed electric service is to be installed.
Traffic Review No Comments 01/10/2022 01/03/2022
Scott Ready
Planning Review Corrections 12/14/2021 12/14/2021
Hector Soto Jr.
Corrective Action Required
12/14/2021

INSURANCE. Provide proof of general liability insurance for claims from injury or death and property damage in an amount approved by the City, but not less than $2,000,000.00 per occurrence for personal injury and $2,000,000.00 per occurrence for property damage with the City listed and endorsed as an additional insured. The policy shall also include an endorsed waiver of subrogation against the City.
Corrective Action Required
12/14/2021

INSPECTION. Provide a copy of an inspection report evaluating the physical state of the tower that has been performed within the last three years. The report shall be signed and sealed.
Building Codes Review Approved with Conditions 12/14/2021 12/14/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
12/14/2021

An electrical building permit will be required if the proposed electric service is to be installed.
Traffic Review No Comments 12/14/2021 12/07/2021
Brad Cooley, P.E., RSPI
Engineering Review Corrections 12/14/2021 12/06/2021
Loic Nguinguiri, E.I.
Corrective Action Required
12/06/2021

Please revise the structural analysis letter to include structural information that confirm whether the new equipment modification meets ANSI/TIA-222-H design code requirements.
Fire Review No Comments 12/14/2021 12/06/2021
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 11/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
11/30/2021 Plans PIXIUS LEES SUMMIT_SS CDs
11/30/2021 Engineer Report/Study Pixius Lees Summit - PE Letter
11/30/2021 Receipt Receipt for transaction:2021-008980
11/30/2021 Application Form Final Development Plan w Instructions July 2021- Pixius Lees Summit - Completed
12/14/2021 Letter Applicant Letter - FDP (DFDP)
12/15/2021 Letter Pixius Lee's Summit - COI
12/16/2021 Engineer Report/Study Pixius Lee's Summit - Tower Inspection
01/03/2022 Engineer Report/Study Pixius Lee's Summit - Structural Analysis
01/11/2022 Letter Applicant Letter - FDP (DFDP)
01/13/2022 Engineer Report/Study Pixius Lee Summit - Inspection Remediation
01/21/2022 Letter Applicant Letter - FDP (DFDP)
01/21/2022 Approved Plans Approved FDP_012122_PIXIUS LEES SUMMIT_SS CDs
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home