Summary
PL2021229
Paragon Star Village, Multi-Family - Mass Grading and Storm Sewer
Engineering Plan Review
Engineering Plan Review
Withdrawn
06/22/2021
I-470 & VIEW HIGH COMMUNITY IMPROVRMENT DISTRICT
WITHDRAWN BY APPLICANT Mike Weisenborn 08/29/2023 7:57 AM
Locations
Contacts
I-470 & VIEW HIGH COMMUNITY IMPROVRMENT DISTRICT, Address:315 SE MAIN ST  
FINKLE & WILLIAMS ARCHITECTURE, Address:7007 COLLEGE BLVD STE 415, Phone:(913) 498-1550  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 11/05/2021 11/05/2021
Sue Pyles, P.E.
Engineering Review No Comments 08/13/2021 08/13/2021
Sue Pyles, P.E.
Engineering Review Corrections 07/12/2021 07/12/2021
Sue Pyles, P.E.
Corrective Action Required
07/12/2021

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Remove the approval signature block for the City. A stamp will be provided electronically when approved. • Show location of all oil/gas wells, or indicate none are present, and cite the source. • Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • The stream buffer boundary doesn’t appear to match the final stream buffer boundary included in the approved Design Modification Request. Please revise throughout the plan set accordingly.
Corrective Action Required
07/12/2021

Sheet 2: Please delete Permitting Note 14, there is no work within KCMO city limits on this project.
Corrective Action Required
07/12/2021

Sheet 4: • Proposed building footprints are labeled but the rectangular area with double lines, which I am assuming is the future parking garage, is not. Please label for clarity. • There is an end section shown just outside of the project boundary at the SE corner that appears to be shown as proposed by line weight. Please either include in this plan set if that is the intent or revise the line weight accordingly on this sheet and throughout the plan set.
Corrective Action Required
07/12/2021

Sheet 5: Structure 5100 size appears to be wrong in the Plan view label. Please revise.
Corrective Action Required
07/12/2021

Sheet 6: • Please show the hydraulic grade line for the design storm on the profile view of the storm system. If the pipe cannot manage the 100 year event without surcharging, then a suitable overflow route must be established for the excess. Finish floor elevations must be a minimum of 2 feet higher than the calculated 100 year water surface elevation. • Enclosed storm sewer systems will use the open channel, or gravity, flow design method for the appropriate design storm (LS Section 5603.1). • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Structure 5100 size appears to be wrong in the Profile view label. Please revise.
Corrective Action Required
07/12/2021

Sheet 8: Please include calculations for the 100-yearr storm.
Corrective Action Required
07/12/2021

Sheet 9: • There is no asphalt pavement or concrete building slab included in the project. Please remove those standard sections. • Please provide calculations and/or information that shows the proposed grates will allow the required surface drainage into the enclosed storm sewer system. • Please provide width dimensions in addition to length dimensions for the proposed riprap.
Corrective Action Required
07/12/2021

Stormwater Drainage Study: Please include the fact that the CLOMR has been approved and include the case number. Update the exhibits in the study to match the revised plans.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home