Planning Application Status

PL2021012




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021012
Whataburger Decel Lane
Engineering Plan Review
Engineering Plan Review
Approved
01/13/2021
OAK VIEW LEES SUMMIT LLC
Locations
Contacts
OAK VIEW LEES SUMMIT LLC, Address:201 HAWKS RIDGE TRL  
Sam Malinowsky, Address:SM Engineering, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 06/22/2022 06/17/2022
Sue Pyles, P.E.
Record Drawings Review Corrections 06/21/2022 06/14/2022
Sue Pyles, P.E.
Engineering Review Corrections 11/08/2021 11/05/2021
Sue Pyles, P.E.
Engineering Review No Comments 10/04/2021 10/01/2021
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
09/30/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
09/30/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $2,892.45 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
Engineering Review Approved with Conditions 03/18/2021 03/18/2021
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
03/18/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
03/18/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $2,892.45 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
Traffic Review No Comments 03/18/2021 03/15/2021
Michael Park
Traffic Review Corrections 02/25/2021 02/24/2021
Michael Park
Corrective Action Required
02/16/2021

Sheet C2.0 - There's still a plan note that needs to be deleted in reference to Driveway Remove and Replace; or amend the note to read Driveway Removal (Do Not Replace).
Corrective Action Required
02/16/2021

Sheet C4.0 - There's a new (or pending) Verizon utility enclosure with associated small wireless faclility equipment, fiber, power, etc. in the ROW near the imrpovements that will need review and possible relocation.
Corrective Action Required
02/16/2021

Sheet C5.0 - There are four plan notes that should be deleted associated with the driveway replacement that was deleted (e.g. four plan notes referencing radii of driveway returns).
Corrective Action Required
02/24/2021

The Temporary Traffic Control Plan remains inadequate and non-conforming to MUTCD requirements. There cannot be a lane merge taper through an intersection and other intersection movements (e.g. dual left turn movements) are in conflict with the work zone/lane closure.
Engineering Review Corrections 02/25/2021 02/24/2021
Sue Pyles, P.E.
Corrective Action Required
02/24/2021

Sheet C5.0: My previous review comment on the pavement detail wasn't clear. All aggregate base must be over the geogrid. Please extend the geogrid to match the aggregate base and reflect that change on the estimate.
Corrective Action Required
02/24/2021

C7.0: A 0.5' drop thru JB A-1 is required. Please revise.
Engineering Review Corrections 01/28/2021 01/27/2021
Sue Pyles, P.E.
Corrective Action Required
01/27/2021

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
01/27/2021

These plans reflect information from the current plat. Lot 5 is in the process of being replatted. The new plat has been approved and is scheduled to be recorded within the next week or so. If the revised plat has been recorded prior to City approval of this project, then the plan set will need to be revised to match the new plat.
Corrective Action Required
01/27/2021

Show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
01/27/2021

Remove the approval signature block for the City. A stamp will be provided electronically when approved.
Corrective Action Required
01/27/2021

Sheet C2.0: Revise Construction Note 3 to state the following: "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
01/27/2021

Sheet C5.0: • The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb. • The geogrid specified isn’t on the current Public Works Approved Products List. Please revise. • The typical section indicated looking north, but I believe it is looking south. Please revise.
Corrective Action Required
01/27/2021

Sheet C6.0: • As designed, the ADA Ramps must have Turning Spaces rather than landings where they connect to the commercial entrance. Revise to a Turning Space with 1.5% maximum slope in all directions. • Alternatively, the north ramp type could be revised to connect in a straight line configuration from the sidewalk. • Please clarify what the TC and SW elevations are referring to.
Corrective Action Required
01/27/2021

Sheet C7.0: • Please include a title block and sheet number. • Please label the Proposed Grade Line. • Please Specify the connection to be core drilled. • Include specific information (sawcut for top removal, dowel requirements, etc.) for the conversion from curb inlet to junction box. • Clarify if the existing and proposed top elevations for the structure being converted are the same. • Include F/L In (E) and F/L Out (S) at JB A-1.
Corrective Action Required
01/27/2021

Include City standard details for MH Frame and Cover.
Traffic Review Corrections 01/28/2021 01/15/2021
Michael Park
Corrective Action Required
01/15/2021

The entrance on Lot 1 "Hallam's" shall be removed and not replaced. This lot was acquired by the adjacent owner with alternative access available; the existing access does not conform to the Access Management Code and shall be removed. It is not an existing driveway in use.
Corrective Action Required
01/15/2021

The RT Arrow spacing shall be revised to comply with City Standard Details for Pavement Markings; 30' from the end of the turn lane to the back of the arrow and 10' from the beginning/entry of the turn lane (referenced from point of full lane width) to the back of the arrow. This likely only requires two arrows; arrow spacing shall not exceed 80' and otherwise be equally spaced if more than two arrows required. Turn Arrow station (no offset needed, to be centered in lane) shall be from the back edge of the arrow for reference. Material for turn arrows shall be specified as Pre-Formed Thermoplastic per City Specifications.
Corrective Action Required
01/15/2021

Plans shall clearly detail the pavement section for RT Lane as a monolithic concrete with curb. The portion of CG-1 on the north side of the driveway shall transition to the monolithic section prior to the sidewalk ramp. There also needs to be a detailed transition near Sta. 6+60 from the monolithic curb section to existing CG-1.
Corrective Action Required
01/15/2021

Sidewalk (6') shall be referenced from the back of curb, not face of curb.
Corrective Action Required
01/15/2021

Dimension (or provide station/offset) to identify the extents of removal for curb, sidewalk, etc.
Corrective Action Required
01/15/2021

Pavement Marking - Lane line shall be 4" solid white, not yellow. Longitudinal Line Material shall be specified as High Build Paint per City Specifications.
Corrective Action Required
01/15/2021

Traffic Control Plan. Reference (and/or include) City Standard Details. TTC shall comply with City Standards and Specifications and MUTCD. The entry taper is inadequate for the 45 mph speed limit and shall be extended accordingly. Check spacing in proximity to nearest traffic signal intersection to the north. Sidewalk closure shall be posted at the Mulberry/St. Lukes intersection with directional detour for pedestrians to cross at the intersection for sidewalk on the east side of Douglas.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home