Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
03/01/2021
|
02/24/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please break down cost item No. 8.03. Also, make sure to provide accurate quantities, and prices, for each BMP shown on the plans. FYI, maintenance associated costs can be omitted in the estimation.
|
|
|
Engineering Review
|
Corrections
|
01/25/2021
|
01/22/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
|
|
Corrective Action Required
Please provide a SWPPP and a Missouri DNR permit along with the resubmittal.
|
|
Corrective Action Required
The label(s) for rock check dam (rock ditch check) on the plan view of sheet C301 is inaccurate. Please revise. Make sure to identify location(s) of ESC-05, temporary diversion berm, as well.
|
|
Corrective Action Required
As shown in ESC-03, J-hooks are required within the ESC plan. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks throughout the plans.
|
|
Corrective Action Required
Please add ESC protection barrier along the western borderline. Running a second temporary diversion berm could be an option.
|
|
Corrective Action Required
On sheet C302, would the eastern area inlet (protection) be located right in the middle of the temporary diversion berm? Please clarify.
|
|
Corrective Action Required
Will the tract G proposed storm water detention facility be constructed before the beginning of this project?
|
|
Corrective Action Required
When are ESC measure(s), such as silt fence and/or temporary diversion berm, expected to be removed? Please clarify or include revision within the sequence(s) of construction.
|
|
Corrective Action Required
On sheet C303, please revise “land disturbance permit” to "erosion and sediment control process" within the sequence of construction since this is not a land disturbance application.
|
|
|