Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
|
08/19/2021
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
Please change the county signature line to: JACKSON COUNTY ASSESSOR OFFICE and remove any reference to the GIS Department. This is a permanent change.
|
|
Corrective Action Required
Please change the signature block for the PLANNING COMMISSION SECRETARY to CYNDA A. RADER.
|
|
|
Engineering Review
|
Approved with Conditions
|
02/15/2022
|
08/19/2021
|
|
Mike Weisenborn
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
GIS Review
|
No Comments
|
|
08/19/2021
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Approved with Conditions
|
02/01/2021
|
02/01/2021
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Planning Review
|
Corrections
|
02/01/2021
|
02/01/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
There are several dashed lines on the rear of the properties that are unidentified, please clarify.
|
|
Corrective Action Required
Addressing shall be forthcoming.
|
|
Corrective Action Required
No final plat shall be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the declaration of covenants and restrictions pertaining to common property as prepared in accordance with Section 4.290 of the UDO, and until the Director has received certification from the Missouri Secretary of State verifying the existence and good standing of the property owners’ association required by Section 4.280 of the UDO. In addition, the approved Declaration of Covenants, Conditions and Restrictions shall be recorded prior to t
|
|
Corrective Action Required
A final plat shall be approved and recorded prior to any building permits being issued.
|
|
Corrective Action Required
Provide a completed single-family compatibility form. This is part of the final plat application packet.
|
|
|
GIS Review
|
Corrections
|
02/01/2021
|
01/27/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please label address on each lot.
|
|
|
Traffic Review
|
No Comments
|
02/01/2021
|
01/26/2021
|
|
Michael Park
|
|
|
Fire Review
|
No Comments
|
02/01/2021
|
01/25/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Planning Review
|
Corrections
|
08/21/2020
|
08/21/2020
|
|
Jennifer Thompson
|
|
Corrective Action Required
FYI. A total of sixty-eight (68) lots may be platted within Phase 1 and 2. However, no more than fifty (50) building permits shall be issued until such time as SW 26th Terrace is constructed between SW Pryor Rd. and SW River Run Dr. to a standard acceptable to the Fire Department, all in compliance with the Fire Code and Unified Development Ordinance regulations requiring a second point of access for developments in excess of fifty (50) single family homes.
|
|
Corrective Action Required
Please add a note similar to the WW 1st plat indicating that Lot#'s 34-51 shall allow/have a 20' rear yard setback. This is a deviation from the standard R-1 zoning district and was approved by City Council as part of the preliminary development plan.
|
|
Corrective Action Required
Add the Lot#'s and Tracts to the Plat title, dedications, and certification areas.
|
|
Corrective Action Required
Label the 5-foot sidewalk on the south side of SW 27th Street. Label the 5-foot sidewalk along both sides of SW Swan Creek Rd.
|
|
Corrective Action Required
Addressing shall be forthcoming.
|
|
Corrective Action Required
What is the proposed driveway access for Lot# 50? The future phase moving east is to have another street running north, with homes facing SW Glen Stream Dr. on both sides.
|
|
Corrective Action Required
Within the Tract dedication language, refer to the name of the HOA that has been established.
|
|
Corrective Action Required
Under the City approval section please correct the following items:
-remove the reference to City Plan Commission
-remove City Council reference
-add this language and include the full plat title (including lot#'s & Tracts): This is to certify that the within plat of "..." including lots "..and tracts" was submitted to and duly approved by the Mayor and City Council of the City of Lee's Summit, Missouri on this day....by Ordinance No._____.
-Revise the Department Title for Ryan Elam to read: Development Services
-Revise the Planning Commission Secretary to: John Lovell
|
|
Corrective Action Required
The landscape easement dedication language seems to reference the City Engineer. Not sure that is appropriate. Please remove the reference to the City Engineer and possibly the public? May need further discussion on this item.
|
|
Corrective Action Required
No final plat shall be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the declaration of covenants and restrictions pertaining to common property as prepared in accordance with Section 4.290 of the UDO, and until the Director has received certification from the Missouri Secretary of State verifying the existence and good standing of the property owners’ association required by Section 4.280 of the UDO. In addition, the approved Declaration of Covenants, Conditions and Restrictions shall be recorded prior to the recording of the final plat.
|
|
Corrective Action Required
A final plat shall be approved and recorded prior to any building permits being issued.
|
|
Corrective Action Required
Add a comment noting the location of any oil and/or gas wells, if any, based on available information. Please note where the information was referenced.
|
|
Corrective Action Required
Provide a completed single-family compatibility form. This is part of the final plat application packet.
|
|
Corrective Action Required
The presented Phase 2 is a deviation from the original phasing plan as approved in the preliminary development plan. Can you provide input on this change.
Also what is the status of the FEMA permits, etc.
|
|
|
Engineering Review
|
Corrections
|
08/21/2020
|
08/21/2020
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
The standard drainage note must be included with the following language: "...individual lot owner(s) shall not change or obstruct the drainage flow lines or paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Traffic Review
|
Corrections
|
08/21/2020
|
08/18/2020
|
|
Michael Park
|
|
Corrective Action Required
Note LNA (No Access) for Lots 51, 41, 50 and 48 to SW Swan Creek Rd. (collector).
|
|
Corrective Action Required
Sidewalk required on one side of 27th and both sides of Swan Creek.
|
|
|
GIS Review
|
Corrections
|
08/21/2020
|
08/17/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Bearings should be labeled on lots along tracts M and N and along streets.
|
|
|
Fire Review
|
Approved with Conditions
|
08/21/2020
|
08/11/2020
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|