Planning Application Status

PL2020099




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020099
The Estates of Chapel Ridge 2nd Plat Lots 23 & 24
Final Plat
Final Plat
Recorded
04/08/2020
CHAPEL RIDGE RESIDENTIAL LLC
Final Plat and MDP
Locations
Contacts
CHAPEL RIDGE RESIDENTIAL LLC, Address:3170 NE CARNEGIE DR #400  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
CHOYCE LLC, Address:PO BOX 847  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 06/03/2020 06/02/2020
Victoria Nelson
Miscellaneous Correction
Resolved
06/03/2020

Ownership Affidavit. Please submit a signed ownership affidavit.
Traffic Review No Comments 06/03/2020 06/02/2020
Michael Park
Engineering Review Approved with Conditions 06/03/2020 06/01/2020
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
05/27/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
05/27/2020

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
05/27/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
05/27/2020

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
05/27/2020

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
05/27/2020

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
05/27/2020

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
Corrective Action Required
06/19/2020

No building permits may be issued for any lot in The Estates of Chapel Ridge, 2nd Plat until an As-graded MDP has been reviewed and accepted by the City and a Certificate of Substantial Completion has been issued for the public infrastructure in The Townhomes of Chapel Ridge, 2nd Plat.
Fire Review No Comments 06/03/2020 05/29/2020
Jim Eden
GIS Review Approved with Conditions 06/03/2020 05/28/2020
Kathy Kraemer
Corrective Action Required
05/28/2020

Reminder about addresses for each lot before recording.
GIS Review Corrections 05/08/2020 05/07/2020
Kathy Kraemer
Corrective Action Required
05/07/2020

In the legal description, the bearing just before the tangent curve s/b SE, not SW. Also the 2nd tangent curve should bear left, not right.
Planning Review Corrections 05/06/2020 05/06/2020
Victoria Nelson
Miscellaneous Correction
Corrective Action Required
05/01/2020

Ownership Affidavit. Please submit a signed ownership affidavit.
Engineering Review Approved with Conditions 05/06/2020 05/05/2020
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
04/28/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
04/28/2020

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
04/28/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
04/28/2020

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
04/28/2020

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
04/28/2020

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
04/28/2020

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
Traffic Review No Comments 05/06/2020 05/05/2020
Sue Pyles, P.E.
Fire Review No Comments 05/06/2020 04/30/2020
Jim Eden
Planning Review Corrections 04/24/2020 04/24/2020
Victoria Nelson
Miscellaneous Correction
Corrective Action Required
04/20/2020

Please submit an ownership affidavit
Corrective Action Required
04/20/2020

Developers phone number. The Developers phone number is missing from the plat.
Corrective Action Required
04/20/2020

COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
Corrective Action Required
04/20/2020

Easements. In the legend you have W/E for water easement and P/E for Access/Pedestrian Easement. These easements are not shown on the plat. If these easements do not need to be dedicated as part of this plat, please delete them from the legend.
Corrective Action Required
04/20/2020

Common Area Tracts. Please make a statement dedicating ownership and maintenance responsibility for all common area tracts to the homeowners association. Statements can be found under Article 7 sec. 7.140 per the UDO.
Corrective Action Required
04/24/2020

SIDEWALK EASEMENT. - Sidewalk easements are required for the areas where the sidewalks meander into the common area tracts adjacent to the head-in parking space bays. Add the following sidewalk easement dedication language: A permanent easement is hereby granted to the City of Lee's Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as "SIDEWALK EASEMENT" or by the abbreviation "S/E" on the accompanying plat. - The segments of sidewalk along the frontage of any common area tract shall be constructed by the developer at the time of infrastructure construction.
Corrective Action Required
04/24/2020

After looking at the plat, it looks like you are proposing to plat two separate but related subdivisions in a single drawing. We have never seen this approach taken with us where a single plat covers two separately named developments. We have been in contact with Vincent at Jackson County and their response is provided. The dedicated name for the each lot/tract created by this plat would have 1 name it would be as shown on the dedication on the attached plat. “THE ESTATES OF CHAPEL RIDGE-2ND PLAT LOTS 23 & 24 AND THE TOWNHOMES OF CHAPEL RIDGE-2ND PLAT LOTS 9-19 & TRACTS A-D” if they want lot 23 & 24 to be separate lots form the other lots shown then they will have to do a 2 plats for each part.
Engineering Review Approved with Conditions 04/24/2020 04/24/2020
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
04/24/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
04/24/2020

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
04/24/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
04/24/2020

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
04/24/2020

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
04/24/2020

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
04/24/2020

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
Traffic Review No Comments 04/24/2020 04/22/2020
Michael Park
GIS Review Corrections 04/24/2020 04/13/2020
Kathy Kraemer
Corrective Action Required
04/13/2020

There are concerns with the dual naming convention in this plat. Per Jackson County: Also every lot or tract in the plat gets that name. if they want the townhomes separate from the Estates then it would be 2 plats not 1. If this is 2 project then I would tell them there would be confusion down the road with this name.
Corrective Action Required
04/13/2020

Drawing references wrong plat near POB. It should be "Townhomes of Chapel Ridge Lot 5."
Corrective Action Required
04/13/2020

Fourth call ITB is incorrect. Also, when corrected, please label on drawing.
Corrective Action Required
04/13/2020

Please label ITB between points 10 and 11.
Corrective Action Required
04/13/2020

Bearing near point 17 doesn't match drawing/legal.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $739.00 $739.00 Paid 04/24/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 06/25/2020 05:00 PM Council Chambers 06/25/2020 05:00 PM
Public Hearing Review
Approved
06/25/2020
City Council Ordinance 1st Reading 07/14/2020 12:00 AM 06:15 PM Council Chambers 07/14/2020 06:15 PM
Public Hearing Review
Approved
City Council Ordinance 2nd Reading 04/20/2021 06:00 PM Council Chambers 04/20/2021 06:00 PM
Public Hearing Review
Approved
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home