Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
06/03/2020
|
06/02/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Ownership Affidavit. Please submit a signed ownership affidavit.
|
|
|
Traffic Review
|
No Comments
|
06/03/2020
|
06/02/2020
|
|
Michael Park
|
|
|
Engineering Review
|
Approved with Conditions
|
06/03/2020
|
06/01/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
Corrective Action Required
No building permits may be issued for any lot in The Estates of Chapel Ridge, 2nd Plat until an As-graded MDP has been reviewed and accepted by the City and a Certificate of Substantial Completion has been issued for the public infrastructure in The Townhomes of Chapel Ridge, 2nd Plat.
|
|
|
Fire Review
|
No Comments
|
06/03/2020
|
05/29/2020
|
|
Jim Eden
|
|
|
GIS Review
|
Approved with Conditions
|
06/03/2020
|
05/28/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Reminder about addresses for each lot before recording.
|
|
|
GIS Review
|
Corrections
|
05/08/2020
|
05/07/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
In the legal description, the bearing just before the tangent curve s/b SE, not SW. Also the 2nd tangent curve should bear left, not right.
|
|
|
Planning Review
|
Corrections
|
05/06/2020
|
05/06/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Ownership Affidavit. Please submit a signed ownership affidavit.
|
|
|
Engineering Review
|
Approved with Conditions
|
05/06/2020
|
05/05/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
Traffic Review
|
No Comments
|
05/06/2020
|
05/05/2020
|
|
Sue Pyles, P.E.
|
|
|
Fire Review
|
No Comments
|
05/06/2020
|
04/30/2020
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
04/24/2020
|
04/24/2020
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Please submit an ownership affidavit
|
|
Corrective Action Required
Developers phone number. The Developers phone number is missing from the plat.
|
|
Corrective Action Required
COMMON PROPERTY. Provide a copy of the subdivision's CC&Rs for review to ensure that they include the required language contained in UDO Section 4.290. The CC&Rs containing the required language shall be recorded at the time the plat is also recorded.
|
|
Corrective Action Required
Easements. In the legend you have W/E for water easement and P/E for Access/Pedestrian Easement. These easements are not shown on the plat. If these easements do not need to be dedicated as part of this plat, please delete them from the legend.
|
|
Corrective Action Required
Common Area Tracts. Please make a statement dedicating ownership and maintenance responsibility for all common area tracts to the homeowners association. Statements can be found under Article 7 sec. 7.140 per the UDO.
|
|
Corrective Action Required
SIDEWALK EASEMENT.
- Sidewalk easements are required for the areas where the sidewalks meander into the common area tracts adjacent to the head-in parking space bays. Add the following sidewalk easement dedication language: A permanent easement is hereby granted to the City of Lee's Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as "SIDEWALK EASEMENT" or by the abbreviation "S/E" on the accompanying plat.
- The segments of sidewalk along the frontage of any common area tract shall be constructed by the developer at the time of infrastructure construction.
|
|
Corrective Action Required
After looking at the plat, it looks like you are proposing to plat two separate but related subdivisions in a single drawing. We have never seen this approach taken with us where a single plat covers two separately named developments. We have been in contact with Vincent at Jackson County and their response is provided.
The dedicated name for the each lot/tract created by this plat would have 1 name it would be as shown on the dedication on the attached plat.
“THE ESTATES OF CHAPEL RIDGE-2ND PLAT LOTS 23 & 24 AND THE TOWNHOMES OF CHAPEL RIDGE-2ND PLAT LOTS 9-19 & TRACTS A-D” if they want lot 23 & 24 to be separate lots form the other lots shown then they will have to do a 2 plats for each part.
|
|
|
Engineering Review
|
Approved with Conditions
|
04/24/2020
|
04/24/2020
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
|
Traffic Review
|
No Comments
|
04/24/2020
|
04/22/2020
|
|
Michael Park
|
|
|
GIS Review
|
Corrections
|
04/24/2020
|
04/13/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
There are concerns with the dual naming convention in this plat. Per Jackson County: Also every lot or tract in the plat gets that name. if they want the townhomes separate from the Estates then it would be 2 plats not 1.
If this is 2 project then I would tell them there would be confusion down the road with this name.
|
|
Corrective Action Required
Drawing references wrong plat near POB. It should be "Townhomes of Chapel Ridge Lot 5."
|
|
Corrective Action Required
Fourth call ITB is incorrect. Also, when corrected, please label on drawing.
|
|
Corrective Action Required
Please label ITB between points 10 and 11.
|
|
Corrective Action Required
Bearing near point 17 doesn't match drawing/legal.
|
|
|