Summary
PL2020089
OSAGE - M-150 AND PRYOR IMPROVEMENTS
Engineering Plan Review
Engineering Plan Review
Pre-Application
Engineering Plan Review
Complete
03/31/2020
CLAYTON PROPERTIES GROUP INC
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
OSAGE HOMES ASSOCIATION INC, Address:120 SE 30TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 03/07/2024 03/07/2024
Gene Williams, P.E.
Engineering Review Approved with Conditions 08/04/2020 08/04/2020
Gene Williams, P.E.
Traffic Review No Comments 08/04/2020 08/03/2020
Michael Park
Traffic Review Corrections 06/25/2020 06/29/2020
Michael Park
Corrective Action Required
06/29/2020

The interim road improvements need to be extended in full to the plat boundary and connect to the 6' paved shoulder improvements designed in association with Stoney Creek or submit/illustrate the other set of plans that show the improvements associated with Stoney Creek to the proposed Pryor Road widening and interim standard that fills the “gap”.
Corrective Action Required
06/29/2020

Engineer to verify and submit design information in support of the proposed culvert location/proximity to traffic along Pryor Road. Is the culver under Pryor Road and associated structures at grade beyond the area of conflict for roadside safety. The structure(s) must be located beyond the minimum clear zone.
Engineering Review Corrections 06/25/2020 06/25/2020
Gene Williams, P.E.
Corrective Action Required
06/25/2020

Interim road standards require the extension of the standards to the plat boundary. According to the plans, the interim standards do not quite extend to the plat boundary, but rather, begin to transition to existing conditions prior to the plat boundary. It is our understanding the work to be performed by others on Pryor Rd. will terminate at Napa Valley Dr., and thus, a gap will remain from the point of transition, to the plat boundary.
Corrective Action Required
06/25/2020

Guard rails may be necessary along the triple box culvert.
Engineering Review Corrections 04/15/2020 04/15/2020
Gene Williams, P.E.
Corrective Action Required
04/15/2020

MoDOT approval of the plans is required prior to any work contained in the plan set. Please consider this requirement, since no portion of the project shown within the plans may be permitted until MoDOT approval is obtained. If the applicant desires to separate the plans according to City improvements versus MoDOT improvements, that is also an alternative.
Corrective Action Required
04/15/2020

Pryor Rd. improvements are shown terminating prior to the plat boundary (i.e., just north of the plat boundary). Is this the extent of the improvements? According to City policy regarding interim road standards, the improvements should extend to the plat boundary.
Corrective Action Required
04/15/2020

A separate traffic control permit shall be obtained from Public Works for all work within City right of way. This temporary traffic control permit application is availabe online, and should include a temporary traffic control plan. No comments related to the traffic control plan are being provided, so it may be better to remove them from the plan set, and clearly state that a separate permit be obtained so there is no confusion.
Corrective Action Required
04/15/2020

After extending the interim road standards to the southern plat boundary, an analysis of the existing culvert must be performed to determine whether simple extension of the culvert will increase the hydraulic grade line due to predominant outlet control in the culvert. In addition, an analysis of the condition of this culvert should be conducted. It may be necessary to remove and replace this culvert based on these analyses.
Traffic Review Corrections 04/15/2020 04/15/2020
Michael Park
Corrective Action Required
04/15/2020

Submit documentation of MoDOT review and approval for improvements within State ROW (e.g. M150).
Corrective Action Required
04/15/2020

Remove the crosswalk marking and stop line on Clayton Place; unless required by MoDOT. City will not maintain these markings approaching state highway and are normally not installed on local roads unless the crosswalk is a shared-use path (greenway). Stop Sign and Street Name Signs and Post for Clayton Place should be City Standards.
Corrective Action Required
04/15/2020

Sidewalk on Osage should connect to the paved shoulders on Pryor.
Corrective Action Required
04/15/2020

Notes regarding signs, markings and traffic control need to include compliance with City Standards and Specifications except for M150 (and MoDOT ROW). Pavement markings on City ROW shall be noted High Build Paint with exception of any symbol, stop line, crosswalk line, or diagonal; which shall be preformed thermoplastic.
Corrective Action Required
04/15/2020

Pryor Road shoulders should be 6', not 5' wide.
Corrective Action Required
04/15/2020

Pavement Marking plan should include dimensions of lane width references. The reverse curves associated with turn lanes also need more detail (e.g. radii, PRC).
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home