Planning Application Status

PL2019293




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019293
ARISTOCRAT MOTORS
Commercial Final Development Plan
Commercial Final Development Plan
Approved
09/05/2019
Locations
Contacts
ARISTOCRAT MOTORS, Address:9400 WEST 65TH ST, Phone:(913) 677-3300  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 08/20/2020 08/18/2020
Sue Pyles, P.E.
Corrective Action Required
08/18/2020

The short (2" or less) curb around the building adjacent to the parking lot does not meet UDO requirements. Please revise to include a 6" vertical curb. Once that revision is shown, the rest of the design revisions can be reviewed. Please note that this will require regrading in order to match the curb and drain properly, and that regrading needs to be shown on the plan revision.
Planning Review No Comments 08/20/2020 08/18/2020
Hector Soto Jr.
Planning Review Corrections 08/12/2020 08/12/2020
Hector Soto Jr.
Corrective Action Required
08/12/2020

PARKING LOT CURBING. The proposed 2" lip serving as the parking lot boundary adjacent to the building does not meet City standard. The UDO requires the boundary of the subject parking lot to be composed of CG-1 curbing. See Standard Detail Sheet Gen-4 of the City's Design & Construction Manual for the standard detail for CG-1 curbing. CG-1 curbing has a minimum 6" tall curb face.
Engineering Review Corrections 08/12/2020 08/12/2020
Sue Pyles, P.E.
Corrective Action Required
08/10/2020

The short (2" or less) curb around the building adjacent to the parking lot does not meet UDO requirements. Please revise to include a 6" vertical curb. Once that revision is shown, the rest of the design revisions can be reviewed. Please note that this will require regrading in order to match the curb and drain properly, and that regrading needs to be shown on the plan revision.
Engineering Review Corrections 08/05/2020 08/05/2020
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/30/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
07/30/2020

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
07/30/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $36,434.47
DE Future Repair Work
Corrective Action Required
07/30/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 10/22/2019 10/23/2019
Joe Frogge
Fire Review Approved with Conditions 10/22/2019 10/23/2019
Dawn Bell
Code Statement
Informational
10/15/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Engineering Review Approved with Conditions 10/22/2019 10/22/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
10/22/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
10/22/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
10/22/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $36,434.47
DE Future Repair Work
Corrective Action Required
10/22/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review Approved with Conditions 10/22/2019 10/15/2019
Hector Soto Jr.
Corrective Action Required
10/15/2019

MINOR PLAT. A minor plat application to combine Lots 2 and 3 for the subject development, as well as to dedicate a private easement for the skating rink's relocated sanitary sewer line, has yet to be submitted. The minor plat application shall be submitted, approved and plat recorded prior to the issuance of a building permit.
Corrective Action Required
10/15/2019

ROOF-TOP UNITS (RTUs). Staff is in receipt of Sheets A3 and A4 that model the placement and visibility of the proposed RTUs. Staff accepts the drawings indicating that the RTUs will not be visible from the right-of-way as satisfying the screening requirements of the UDO. However, staff will conduct a post-construction inspection of the building and site at the time building occupancy is requested. Inspection of the RTUs' visibility will take place at that time. Should the RTUs be found to be visible, staff will require that measures be taken to provide the necessary screening to comply with the screening requirements of the UDO prior to the issuance of a final Certificate of Occupancy.
Traffic Review No Comments 10/22/2019 10/15/2019
Michael Park
Engineering Review Corrections 10/10/2019 10/11/2019
Sue Pyles, P.E.
Corrective Action Required
10/11/2019

Estimate: • Review quantities for Items 8-12. Verify or revise. • Does the lump sum included for the Storm Tech Detention System include both underground units? • Add items for backflow vault, Baffle Box (4x6), and connections to existing storm, sanitary, and water to the estimate.
Corrective Action Required
10/11/2019

Storm Water Drainage Report: • Revise #4, Drainage Assessment of the Project Site. The storage facility is no longer planned on the adjacent property. • Revise the project name on Pages 2 & 3 of the Soils Report and on the Drainage Diagram.
Planning Review Approved with Conditions 10/10/2019 10/08/2019
Hector Soto Jr.
Corrective Action Required
10/08/2019

MINOR PLAT. A minor plat application to combine Lots 2 and 3 for the subject development, as well as to dedicate a private easement for the skating rink's relocated sanitary sewer line, has yet to be submitted. The minor plat application shall be submitted, approved and plat recorded prior to the issuance of a building permit.
Corrective Action Required
10/08/2019

ROOF-TOP UNITS (RTUs). Staff is in receipt of Sheets A3 and A4 that model the placement and visibility of the proposed RTUs. Staff accepts the drawings indicating that the RTUs will not be visible from the right-of-way as satisfying the screening requirements of the UDO. However, staff will conduct a post-construction inspection of the building and site at the time building occupancy is requested. Inspection of the RTUs' visibility will take place at that time. Should the RTUs be found to be visible, staff will require that measures be taken to provide the necessary screening to comply with the screening requirements of the UDO prior to the issuance of a final Certificate of Occupancy.
Fire Review Approved with Conditions 10/10/2019 10/03/2019
Jim Eden
Code Statement
Informational
10/03/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review Corrections 10/10/2019 10/03/2019
Joe Frogge
Corrective Action Required
10/03/2019

- Coordinate water service line size. (different sizes from 1" to 2-1/2" between civil utility plan, civil utility plan general notes, ME site plan, underslab plumbing plan) 10/3/19 - not addressed. - Civil utility plan - 2" water meter - Civil utility plan general notes - 1" water service piping - ME-201 - 2" piping - P-201 - 2-1/2" piping Clarify.
Traffic Review No Comments 10/10/2019 10/03/2019
Michael Park
Engineering Review Corrections 09/19/2019 09/20/2019
Sue Pyles, P.E.
Corrective Action Required
09/20/2019

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Submit the SWPPP and a copy of the MDNR Land Disturbance Permit. • Sidewalk west along the SE Oldham Parkway frontage west of SE Oldham Court shall be constructed at this time. Include construction of the sidewalk and ADA-accessible ramp, with site-specific design) in the plan set. • The adjacent project as shown in the plan set and referenced in the Storm Water Drainage Report is not moving forward. Revise the plan set, report, and storm sewer calculations accordingly. • Please note that a complete review of stormwater design will be done when the adjacent property is shown as it currently exists. • The plans do not include any sort of provision for the access to the Skate Rink being kept open, other than perhaps the location of the construction entrance being placed in an unusual location. Please include this access in the plan set and coordinate with the adjacent property owner to perform the work.
Corrective Action Required
09/20/2019

Sheet 3: • Revise the Streets note to reflect the sidewalk revision. • One type of pavement is shown for the whole site, other than trash enclosure pad. For only one type to be used, it would have to meet the heavy duty pavement requirement of 1.5” surface and 5” base (for asphalt). The pavement detail does not meet this requirement. Please revise accordingly.
Corrective Action Required
09/20/2019

Sheet 6: • The east detention shown on this sheet does not match the ADS Design included. Please revise to match. • The Structure 1A flowline information appears to have the N & W pipes shown as outflow rather than inflow. Please revise.
Corrective Action Required
09/20/2019

Sheet 9: Locate the construction entrance to facilitate all construction traffic having to cross it to exit but allow the adjacent property to avoid it through their use.
Corrective Action Required
09/20/2019

Sheet 10: Replace the curb & gutter detail with the City’s standard detail.
Corrective Action Required
09/20/2019

Revise the Storm Water Drainage Report Design Calculations and Exhibits to show the correct project name.
Planning Review Corrections 09/19/2019 09/19/2019
Hector Soto Jr.
Corrective Action Required
09/19/2019

MINOR PLAT. A minor plat application to combine Lots 2 and 3 for the subject development, as well as to dedicate a private easement for the skating rink's relocated sanitary sewer line, has yet to be submitted. The minor plat application shall be submitted, approved and plat recorded prior to the issuance of a building permit.
Corrective Action Required
09/19/2019

SIDEWALKS. A 5' sidewalk shall be constructed along SE Oldham Pkwy west of the driveway. Payment in lieu of construction shall be made for the required sidewalk east of the driveway.
Corrective Action Required
09/19/2019

ADA PARKING SIGN. - Revise General Note #8 on Sheet 3 to indicate that the sign will be mounted a minimum 60" above grade, measured to the bottom of the sign. - Revise the detail on Sheet 10 to reflect the comment above.
Corrective Action Required
09/19/2019

LANDSCAPE PLAN. The proposed trees are shown as 2" caliper. To meet the minimum requirements of the City's UDO, the proposed trees shall be revised to a minimum 3" caliper at the time of planting.
Corrective Action Required
09/19/2019

ROOF-TOP UNITS (RTUs). The UDO requires that all RTUs be fully screened from view on all sides through the use of parapet walls at least equal to the height of the units being screened. The south and east elevations show that the RTUs are partially visible on those two sides of the building. The parapet walls shall be extended so as to fully screen the RTUs in accordance with City ordinance.
Traffic Review No Comments 09/19/2019 09/17/2019
Michael Park
Building Codes Review Corrections 09/19/2019 09/10/2019
Joe Frogge
Corrective Action Required
09/10/2019

- Specify size of water meter. - Coordinate water service line size. (different sizes from 1" to 2-1/2" between civil utility plan, civil utility plan general notes, ME site plan, underslab plumbing plan)
Fire Review Approved with Conditions 09/10/2019 09/10/2019
Jim Eden
Code Statement
Informational
09/10/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 09/05/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
09/05/2019 Receipt Receipt for transaction: 2019-006055
09/05/2019 Letter Routing Sheet - FDP
09/05/2019 Plans Aristocrat-FDP-Combined
09/05/2019 Plans Final Storm Report-Aristocrat Motors-1
09/23/2019 Letter Applicant Letter - FDP (DFDP)
10/03/2019 Plans STORMWATER POLLUTION PREVENTION PLAN -ARISTOCRAT MOTORS
10/03/2019 Plans 180508_Aristocrat Pre-Owned LSMO_A3 - Exterior Exhibits_2019-10-02
10/03/2019 Plans 180508_Aristocrat Pre-Owned LSMO_A4 - RTU Visibility Study_2019-10-02
10/03/2019 Plans Applicant Letter - FDP (DFDP)-Responses
10/03/2019 Plans Aristocrat Motors-FDP-2nd Submittal
10/03/2019 Plans Aristocrat Motors-MDNR LD Permit
10/03/2019 Plans Aristocrat-Motors-Quantities-20190930
10/03/2019 Plans Final Storm Report-Aristocrat Motors-1
10/03/2019 Letter Resubmittal Routing Sheet - FDP
10/11/2019 Letter Applicant Letter - FDP (DFDP)
10/15/2019 Plans AristocratMotors-FDP-20191014
10/15/2019 Plans Aristocrat-Motors-Quantities-20191014
10/15/2019 Plans Final Storm Report-Aristocrat Motors
10/15/2019 Plans STORMWATER POLLUTION PREVENTION PLAN -ARISTOCRAT MOTORS
10/15/2019 Plans Applicant Letter - FDP (DFDP)-RESPONSES
10/15/2019 Plans Aristocrat Motors-MDNR LD Permit
10/15/2019 Letter Resubmittal Routing Sheet - FDP
10/23/2019 Activity Document Aristocrat-Motors-Quantities
10/23/2019 Letter Applicant Letter - FDP (DFDP)
11/06/2019 Activity Document Fees PL2019293 Aristocrat Motors FDP
07/30/2020 Plans FDP-GradingPlan-Detail-REVISION-20200729
08/08/2020 FDP-GradingPlan-Detail-REVISION-20200729
08/08/2020 AristocratMotors-Revision20200808
08/12/2020 Letter Applicant Letter - FDP (DFDP)
08/17/2020 8.17.20 FDP-GradingPlan-Detail-REVISION-20200729
08/17/2020 approved 8.17.20 BOL-RF-24-4_5_1_1
08/17/2020 approved 8.17.20 Resized_20200817_151655
08/19/2020 approved 8.19.20 aristocrat FDP-GradingPlan-Detail-REVISION-20200731
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents