Planning Application Status

PL2019249




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019249
Residences at Echelon
Sign Application
Sign Application
Approved
07/31/2019
ALDERSGATE METHODIST CHURCH
2 monument signs -- overheight and oversized (structure area) for zoning district
Locations
Contacts
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
GRIFFIN RILEY INVESTMENTS LLC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 08/14/2019 08/19/2019
Hector Soto Jr.
Engineering Review No Comments 08/14/2019 08/19/2019
Hector Soto Jr.
Planning Review Approved with Conditions 08/14/2019 08/19/2019
Hector Soto Jr.
Fire Review No Comments 08/14/2019 08/08/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
Sign Application fee $200.00 $0.00 $200.00 Not Paid



(None of the fees owing can be paid online)
Hearings
Title Location Date Time
Planning Commission Meeting 08/08/2019 05:00 PM Council Chambers 08/08/2019 05:00 PM
Public Hearing Review
Pending
08/08/2019
Documents & Images
Date Uploaded File Type Document Name
07/31/2019 Drawing Location Map
07/31/2019 Drawing Location Map
07/31/2019 Drawing Elevations _Site Plan
08/19/2019 Letter Staff Report
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home