PL2019236




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019236
HAWTHORN RIDGE 2ND PLAT - WATER LINE PLANS
Engineering Plan Review
Engineering Plan Review
Approved
07/15/2019
CMH PARKS INC
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 03/25/2021 03/25/2021
Gene Williams, P.E.
Corrective Action Required
03/24/2021

DEG ACCEPTED AWAITING INSPECTIONS
Engineering Review No Comments 08/28/2019 08/28/2019
Gene Williams, P.E.
Engineering Review Corrections 07/29/2019 07/29/2019
Gene Williams, P.E.
Corrective Action Required
07/29/2019

Sheet 02: Please add notes that specify that all fittings shall be ductile iron, with fusion-bonded epoxy coating complying with ANSI/AWWA C116/A21.16 on the interior and exterior. Also, add a note concerning the requirement that tracer wire be installed with the water main.
Corrective Action Required
07/29/2019

There appears to be a misunderstanding on the number of valves at tees and crosses. The City requires that two (2) valves be installed at a tee, and three (3) valves at a cross. It appears that every tee and cross is missing one (1) valve. Please ensure that each tee and cross has the correct number of valves.
Corrective Action Required
07/29/2019

Sheet 04: It appears the inline fire hydrant is being removed, and not replaced. Based on our records, it appears a fire hydrant is warranted near this location, as the nearest fire hydrant is located approximately 500 feet to the north.
Corrective Action Required
07/29/2019

General Comment Concerning All Plan and Profile Sheets: Please ensure that all notes concerning the gate valves has been updated to reflect the requirement that two (2) valves be installed at every cross, and three (3) valves at all tees.
Corrective Action Required
07/29/2019

When performing the re-design to allow for the additional valves, please ensure that valves are not placed within the sidewalk, if possible.
Corrective Action Required
07/29/2019

A trenching and backfill detail was missing. Please provide a typical section view of the trenching and backfill method to be used on this project.
Corrective Action Required
07/29/2019

Please provide the standard details for water valves and boxes, and the fire hydrant assemblies.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home