Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
08/05/2019
|
09/09/2019
|
|
Joshua Johnson
|
|
|
Engineering Review
|
Approved with Conditions
|
08/05/2019
|
08/14/2019
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
|
|
|
Fire Review
|
No Comments
|
08/05/2019
|
07/30/2019
|
|
Jim Eden
|
|
|
Traffic Review
|
No Comments
|
08/05/2019
|
07/29/2019
|
|
Michael Park
|
|
|
GIS Review
|
No Comments
|
08/05/2019
|
07/26/2019
|
|
Kathy Kraemer
|
|
|
Fire Review
|
No Comments
|
|
07/09/2019
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
07/08/2019
|
07/08/2019
|
|
Jennifer Thompson
|
|
Corrective Action Required
Please label the lots with the following corresponding addresses: Lot 1=1701 SE Oldham Pkwy and Lot 2= 1051 SE Princeton Dr.
|
|
Corrective Action Required
The developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, any required offsite water, sanitary and road improvements. No building permits shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorder's Office.
|
|
Corrective Action Required
Revise the city approval paragraph to the following:
This is to certify that the within plat "name of plat including plat and lot numbers" was submitted to and duly approved by the Mayor and City Council of the City of Lee's Summit, Missouri, this _______day of _______, 2019 by Ordinance No.______.
|
|
Corrective Action Required
What is the additional dashed line on Lot 2 indicating a 20 foot dimension? Please provide a label.
|
|
Corrective Action Required
Provide a note and reference where the information was obtained for the location of any oil and/or gas wells, if any, based on available information.
|
|
Corrective Action Required
Label SE Oldham Pkwy and provide the ROW width.
|
|
|
Engineering Review
|
Corrections
|
07/08/2019
|
07/02/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please remove the BMP easement language, or ensure the language is sufficiently clear to show these easements are private, and not public easements.
|
|
Corrective Action Required
A 10 foot wide general utility easement should be dedicated along the entire Oldham Pkwy. right of way. As shown, there is a water line easement extending to the right of way between a general utility easement. However, a general utility easement is also needed which overlaps this easement.
|
|
|
GIS Review
|
No Comments
|
07/08/2019
|
06/27/2019
|
|
Kathy Kraemer
|
|
|
Traffic Review
|
No Comments
|
07/08/2019
|
06/27/2019
|
|
Michael Park
|
|
|