Planning Application Status

PL2019102




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019102
Summit Orchard Lot 4 - Public and Private Sanitary Sewer
Engineering Plan Review
Engineering Plan Review
Approved
03/11/2019
TOWNSEND SUMMIT LLC
Locations
Contacts
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Not shown for privacy reasons.
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 04/25/2019 04/24/2019
Sue Pyles, P.E.
Engineering Review Corrections 04/19/2019 04/17/2019
Sue Pyles, P.E.
Corrective Action Required
04/17/2019

Include pipe information (size, slope, material) for the existing pipe downstream of the existing MH in the Lines A & B Profile views.
Corrective Action Required
04/17/2019

Revise the DIP size from 8" to 6" in the Summary of Quantities Table.
Engineering Review Corrections 04/01/2019 04/02/2019
Sue Pyles, P.E.
Corrective Action Required
04/02/2019

General: • Include Erosion and Sediment Control design for each stage (pre-disturbance, during construction, post-completion) in the plan set. Include standard details for all items shown. • Include a Summary of Quantities table. • Label Line B as Private throughout the plan set.
Corrective Action Required
04/02/2019

Sheet C201: • Please confirm that the Top Elevation for the existing MH at the ease end of Line A is field verified. • Include pipe information for the pipe downstream of the existing MH in the Plan view, and include the flowline out. • Include note to core drill connection to existing MH according to City requirements. • Include separation between sanitary and storm at all pipe crossing locations to verify City requirements are met.
Corrective Action Required
04/02/2019

Sheet C202: Include separation between sanitary and storm at all pipe crossing locations to verify City requirements are met.
Corrective Action Required
04/02/2019

Sheet C203: • Include pipe information for the pipe downstream of the existing MH in the Plan view, and include the flowline out. • Include note to core drill connection to existing MH according to City requirements. • Add the storm sewer crossing Line B at approximate Sta. 10+87 in the Profile view. • Include separation between sanitary and storm at all pipe crossing locations to verify City requirements are met.
Corrective Action Required
04/02/2019

Estimate: • Verify the quantity for Sanitary MHs and revise if needed. • Add a line item for 6” PVC (service lines) or combine with the Line B quantity.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: