Summary
PL2019076
SUMMIT VILLAGE NORTH
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Withdrawn
02/15/2019
UNITY REALTY LLC
Locations
Contacts
UNITY REALTY LLC, Address:1901 NW BLUE PKWY, Phone:(816) 251-3593  
UNITY REALTY LLC, Address:1901 NW BLUE PKWY, Phone:(816) 251-3593  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review Approved with Conditions 04/01/2019 05/24/2019
Michael Park
Corrective Action Required
05/24/2019

Refer to TIA for conditions of approval.
Fire Review Approved with Conditions 04/01/2019 04/10/2019
Jim Eden
Code Statement
Corrective Action Required
04/02/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 02/28/2019 03/01/2019
Jennifer Thompson
Legal Description
Corrective Action Required
03/01/2019

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
03/01/2019

The Unified Development Ordinance (UDO) lists criteria for considering rezoning and conceptual plan applications. Please refer to Article 2, Section 2.260.B. Please respond in narrative form to the listed criteria 1-18, to the extent they are pertinent to this application.
Corrective Action Required
03/01/2019

As part of the Conceptual Plan submittal requirements referenced in the UDO Article 2, Section 2.400 the following was missing from the submittal: -Total number of dwelling units for the retirement resort and total number of hotel units. -Total square feet for all proposed buildings -Identified uses for all buildings -vicinity map needs additional reference information (i.e. street labels, etc.) -Typical structure elevations including materials and colors -conceptual landscape plan
Corrective Action Required
03/01/2019

In general staff feels there could be better organization of the proposed uses within the conceptual plan. At the preliminary development plan stage for any of the proposed development, staff will be re-evaluating the site layout and land planning concepts.
Traffic Review Corrections 02/28/2019 02/28/2019
Michael Park
Informational
02/28/2019

Traffic Study Comments were sent to the applicants traffic engineer whom prepared the study.
Informational
02/28/2019

Improvements to Colbern Road planned by the City were assumed complete in the traffic study for the adjacent development that accesses Colbern Road. Those road improvements would be requried prior to that phase of development. Those improvements would need to include a raised median along Colbern Road to limit access at Drive 6 to RIRO in lieu of the island proposed in the driveway.
Fire Review Corrections 02/26/2019
Jim Eden
Code Statement
Corrective Action Required
02/26/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Engineering Review Corrections 02/28/2019 02/21/2019
Gene Williams, P.E.
Corrective Action Required
02/21/2019

Stream buffer setbacks were not shown anywhere on the plans, nor the location of the box culvert beneath Douglas St. Please be aware this is a large box culvert, and it appears buildings, parking lots, and roads are proposed within what appears to be the stream buffer.
Corrective Action Required
02/21/2019

The stormwater study was vague in terms of what is proposed within the area designated as "Stormwater Management Area" within Summit Village North.
Corrective Action Required
02/21/2019

Several water lines are shown along Douglas St. We are only showing one (1) 20 inch transmission main, which cannot be utilized for water service. A 12 inch water main is available to the west of the development.
Corrective Action Required
02/21/2019

Please see comments related to the sanitary sewer analysis for Aria Preliminary Development Plan. There appear to be capacity issues that need to be addressed.
Corrective Action Required
02/21/2019

As discussed on the Aria Preliminary Development Plan comments, the City will not support the comparision between existing peak storm flows, and post-developed peak storm flows. The City follows the Comprehensive Control Strategy, which also includes the requirement that 40 hour extended detention be provided.
Corrective Action Required
02/21/2019

A ten (10) foot general utility easement is needed along all street frontage (i.e., Colbern Rd. and Douglas St.).
Corrective Action Required
02/22/2019

A water line extension appears to be warranted along Douglas St., from the dead-end 8 inch line at Colbern Rd. and Douglas St., to the north end of the project (i.e., to the existing 12 inch water line to the north of the dual 120 inch by 84 inch box culverts).
Hearings
Title Location Date Time
Planning Commission Meeting 04/11/2019 05:00 PM Council Chambers 04/11/2019 05:00 PM
Public Hearing Review
Pending
04/11/2019
City Council Public Hearing 05/07/2019 06:15 PM Council Chambers 05/07/2019 06:15 PM
Public Hearing Review
Pending
05/07/2019
City Council Public Hearing 05/21/2019 06:15 PM Council Chambers 05/21/2019 06:15 PM
Public Hearing Review
Pending
05/21/2019
Documents & Images
Date Uploaded File Type Document Name
02/15/2019 Letter Routing Sheet
03/01/2019 Letter Applicant Letter - Dev. Apps (DRCP)
04/02/2019 Letter Resubmittal Routing Sheet
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home