Planning Application Status

PL2018213




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018213
Douglas Corners, Lot 1B
Commercial Final Development Plan
Commercial Final Development Plan
Expired
11/28/2018
THOMPSON PROPERTIES LLC
Locations
Contacts
THOMPSON PROPERTIES LLC, Address:PO BOX 2173  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
THOMPSON PROPERTIES LLC, Address:2151 SW FORESTPARK CT, Phone:(816) 678-6393  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Corrections 01/29/2019 02/01/2019
Jim Eden
Code Statement
Corrective Action Required
01/22/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Imposed Loads
Corrective Action Required
01/22/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: Confirm the lane in the parking lot will be heavy duty concrete. What is shown is different than the detail.
Engineering Review Corrections 12/12/2018 12/12/2018
Sue Pyles, P.E.
Corrective Action Required
12/12/2018

Submit: • Engineer’s Estimate of Probable Construction Costs • SWPPP
Corrective Action Required
12/12/2018

Sheet 1: Revise the Sheet 4 name in the Index to match the name shown on Sheet 4.
Corrective Action Required
12/12/2018

Sheet 3: • Show the detention basin and label the 100-year WSE on this sheet and throughout the plan set. • Revise Note #3 to refer to Development Engineering Inspections. • The chain link fence is shown but the retaining wall shown in the Preliminary Development Plan is not included in this plan set. Remove the fence and any references to the wall on this sheet and throughout the plan set.
Corrective Action Required
12/12/2018

Sheet 4: • How will erosion be prevented at the trench drain outlet to the detention basin? Is the intent to have an end section at this location? • Pipe must have a continuous slope from structure to structure. Please revise the detention basin outlet pipe accordingly. • Show and label the overflow spillway length and location, along with provided freeboard to top of embankment. Verify the design volume can pass over the spillway in case of a clogged outlet. • Include detention basin outlet structure information and construction details in the plan set. • Revise the reference from “Highway Department Standards” to “City Standards” in the Grading and Drainage notes. • Include storm sewer calculations and storm sewer profiles, including HGL, in the plan set.
Corrective Action Required
12/12/2018

Sheet 6: Label areas for each Drainage Area.
Corrective Action Required
12/12/2018

Sheet 7: • Label areas for each Drainage Area. • The leader for the 100-year WSE is not pointing to the correct location. • Clarify the riprap information. Is the D50=6” or is that the riprap depth? Include both for proper construction.
Corrective Action Required
12/12/2018

Sheet 8: • The existing water main has been extended to the south property line of this lot. Relocate the fire hydrant to the end of the extended water main. • Provide a utility easement meeting current requirements for the extended public water main from the public right-of-way through the fire hydrant. Show and label the easement throughout the plan set. Please submit the easement for review. • A Backflow Prevention Device is required for the fire protection line. Since the building is more than 50’ from the public water main, it will be required to be in a vault placed according to Section 6900 of the Design and Construction manual. • The line weights and number of lines overlapping make it very difficult to see the water lines connecting to the building. Please include an enlargement of the area on this sheet.
Corrective Action Required
12/12/2018

Sheets 10-13: • There is a detail for 6” x 18” concrete curb. Please clarify where is that curb is located. • There is a grate inlet specified in the plans, but no standard detail for it. • Is the junction box at the SE corner of the site existing or proposed? If proposed, include the standard detail. • Remove the duplicate Curb & Gutter detail.
Corrective Action Required
12/12/2018

Final Storm Water Drainage Report: • More clearly define the discharge from the additional impervious area added by this project. • Update the checklist inclusion item 21 to reflect the final submittal. • Clarify the detention pond outlet, is there a structure proposed? • The plans indicate the use of filtering devices prior to discharge into the detention basin as a water quality measure in lieu of 40-hour extended detention for the water quality storm. As this is not standard, please expand upon the use of these, providing the reason for their use and how they will meet the intent of Section 5600.
Traffic Review No Comments 12/12/2018 12/11/2018
Michael Park
Planning Review Corrections 12/12/2018 12/11/2018
Shannon McGuire
Corrective Action Required
12/11/2018

Please label the width of the proposed ADA aisle.
Corrective Action Required
12/11/2018

Please provide the location, height, intensity and type of outside lighting fixtures for buildings and parking lots.
Corrective Action Required
12/11/2018

Please provide a photometric diagram indicating the foot candle levels throughout the site and at the property lines.
Corrective Action Required
12/11/2018

Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
12/11/2018

Is any ground mounted equipment being proposed? If so please provide the location, size, and type of material to be used in all screening of ground mounted mechanical equipment.
Corrective Action Required
12/11/2018

Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used (ground and/or roof).
Corrective Action Required
12/11/2018

Please provide the location, size, and type of material of all proposed monument or freestanding signs.
Corrective Action Required
12/11/2018

Please provide elevations of all sides of proposed buildings including notation indicating building materials to be used on exteriors and roofs. Please include the location, size and materials to be used in all screening of rooftop mechanical equipment. A dashed line indicating the roof line and rooftop mechanical equipment shall be included.
Corrective Action Required
12/11/2018

Please provide a floor plan showing dimensions and areas of all floors within proposed buildings and structures.
Corrective Action Required
12/11/2018

The PDP plans that were approved showed a retaining wall. Has this been removed from the proposed project? If the wall has been removed, staff would like to see the chain-link fence on the north and east side of the building removed as well. If the applicant wished to keep the fence as proposed please provide details for it.
Corrective Action Required
12/11/2018

The correct address for this project is 150 NE Tudor Rd. Please update the plans accordingly.
Building Codes Review Corrections 12/12/2018 12/10/2018
Joe Frogge
Corrective Action Required
12/10/2018

Provide blow-up or otherwise clarify domestic and fire entrances into building.
Fire Review Corrections 12/03/2018
Jim Eden
Code Statement
Corrective Action Required
12/03/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Imposed Loads
Corrective Action Required
12/03/2018

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: Confirm the lane in the parking lot will be heavy duty concrete. What is shown is different than the detail.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 11/28/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.