SUMMIT EYE CENTER PHASE 1A PARKING EXPANSION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/16/2018
MENC LLC - ANITA DAVIS
Locations
Contacts
MENC LLC - ANITA DAVIS, Address:1741 NE DOUGLAS STE 100, Phone:(816) 246-2111  
PAUL OSBORNE (OLSSON ASSOCIATES), Address:1301 BURLINGTON ST, SUITE 100, Phone:(816) 587-4320  
MENC LLC - ANITA DAVIS, Address:1741 NE DOUGLAS STE 100, Phone:(816) 246-2111  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/07/2018 09/07/2018
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
09/07/2018

Private parking lots shall follow Article 12 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/07/2018

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
09/07/2018

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $1,567.69 (which is calculated as 3% of the total infrastructure cost), must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
Planning Review No Comments 09/07/2018 09/07/2018
Hector Soto Jr.
Building Codes Review Approved with Conditions 09/07/2018 09/07/2018
Joe Frogge
Corrective Action Required
09/07/2018

A construction permit will be required for the new lighting. Action required: Comment is for informational purposes.
Traffic Review No Comments 09/07/2018 09/06/2018
Michael Park
Fire Review No Comments 09/07/2018 08/30/2018
Jim Eden
Planning Review No Comments 08/10/2018 08/10/2018
Hector Soto Jr.
Building Codes Review Approved with Conditions 08/10/2018 08/10/2018
Joe Frogge
Corrective Action Required
08/10/2018

A building permit is required for all work associated with site lighting. Action required: Comment is for informational purposes.
Traffic Review No Comments 08/10/2018 08/09/2018
Michael Park
Fire Review No Comments 08/10/2018 08/08/2018
Jim Eden
Engineering Review Corrections 08/10/2018 08/08/2018
Sue Pyles, P.E.
Corrective Action Required
08/07/2018

Article 12 of the UDO requires 5.5 or 6.5 inches of asphalt and 6" of granular base course with either geogrid or 6" of stabilized subgrade. The plans meet the asphalt 6" granular base course requirements. However, the base course is shown on 6" compated subgrade in both pavement sections in the plans. This does not meet the UDO requirement of either geogrid or 6" stabilized subgrade. Please revise.
Corrective Action Required
08/08/2018

Extend silt fence to the north and west to capture any sediment from the north parking area.
Corrective Action Required
08/08/2018

Engineer’s Estimate of Probable Construction Costs: • Items 6, 9, 10, 13 may be removed from the estimate as those items are not included in the fee calculation. • Add an item for either geogrid or stabilized subgrade, with a quantity greater than the asphalt quantity to account for the extension beyond the curb and gutter.
Planning Review Corrections 07/30/2018 07/30/2018
Victoria Nelson
Corrective Action Required
07/24/2018

C.1. Legal Description. A legal description which accurately describes the limits of the property. The description that you show on the FDP is for the entire area. Please revise so that the description is addressing the Lot only.
Corrective Action Required
07/24/2018

C.3. Floodplain. Please cite and date the year of the floodplain description (FIRM Panel) that you have shown in the FDP.
Corrective Action Required
07/24/2018

C.5. Streets. Please label the Right-of-Way and the private drive. Please show width of each.
Corrective Action Required
07/24/2018

C.6. Sidewalks. Please label and show the width of the sidewalks along Rosemary and Blue Parkway.
Corrective Action Required
07/24/2018

Property Boundary. Label the property line bearings and dimensions for the boundaries of Lot 1.
Corrective Action Required
07/24/2018

C.7. Easements. Please label the utility easements on sheets 104 and 105.
Corrective Action Required
07/24/2018

C.20. Right-of-Way. All existing adjacent public street right-of-ways with centerline location need to be labeled and have dimensions.
Corrective Action Required
07/24/2018

C.25. Oil & Gas Wells. Please add a note and show if there are any active or non-active oil & gas wells within the area and be sure to cite the source of the information. The Missouri Department of Natural Resources maintains a database of oil & gas wells that can be cited.
Corrective Action Required
07/24/2018

Site Data Table needed on sheet 104. Please include: Lot Description-Lot 1... Lot Area- Existing Building Area- Floor Area Ratio (FAR)- Required Parking Spaces- Existing Parking Spaces- Proposed Parking Spaces- Total Parking Spaces- Existing Impervious Coverage- Total Impervious Coverage (existing and propsed)
Engineering Review Corrections 07/30/2018 07/25/2018
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
07/23/2018

Sheet 109: The pavement sections do not meet the requirements of Article 12 of the Unified Development Ordinance for pavement thickness and base requirements. Please revise.
Corrective Action Required
07/23/2018

Submit an Engineer's Estimate of Probable Construction Costs.
Building Codes Review Approved with Conditions 07/30/2018 07/24/2018
Joe Frogge
Corrective Action Required
07/24/2018

A building permit is required for all work associated with site lighting. Action required: Comment is for informational purposes.
Fire Review No Comments 07/30/2018 07/24/2018
Jim Eden
Traffic Review No Comments 07/30/2018 07/23/2018
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/18/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/16/2018 Letter Routing Sheet - FDP
07/17/2018 Letter Routing Sheet - FDP
07/18/2018 Receipt Receipt for transaction: 2018-004987
07/30/2018 Letter Applicant Letter - FDP (DFDP)
08/03/2018 Plans 106 GRADING PLAN
08/03/2018 Plans 107 EROSION CONTROL PLAN - PHASE 1
08/03/2018 Plans 108 SPOT ELEVATIONS
08/03/2018 Plans 109 DETAIL SHEET
08/03/2018 Plans E1 ELECTRICAL PLAN
08/03/2018 Plans E2 PHOTOMETRIC PLAN
08/03/2018 Plans L002 LANDSCAPE PLAN
08/03/2018 Plans 100 TITLE SHEET
08/03/2018 Plans 101 GENERAL NOTES
08/03/2018 Plans 102 EXISTING CONDITIONS
08/03/2018 Plans 103 DEMOLITION PLAN
08/03/2018 Plans 104 SITE PLAN
08/03/2018 Plans 105 GEOMETRIC PLAN
08/03/2018 Letter Resubmittal Routing Sheet - FDP
08/15/2018 Letter Applicant Letter - FDP (DFDP)
08/30/2018 Plans 104 SITE PLAN
08/30/2018 Plans 105 GEOMETRIC PLAN
08/30/2018 Plans 106 GRADING PLAN
08/30/2018 Plans 107 EROSION CONTROL PLAN - PHASE 1
08/30/2018 Plans 108 SPOT ELEVATIONS
08/30/2018 Plans 109 DETAIL SHEET
08/30/2018 Plans E1 ELECTRICAL PLAN
08/30/2018 Plans E2 PHOTOMETRIC PLAN
08/30/2018 Plans L002 LANDSCAPE PLAN
08/30/2018 Plans 100 TITLE SHEET
08/30/2018 Plans 101 GENERAL NOTES
08/30/2018 Plans 102 EXISTING CONDITIONS
08/30/2018 Plans 103 DEMOLITION PLAN
08/30/2018 Letter Resubmittal Routing Sheet - FDP
09/07/2018 Activity Document Fees PL2018119 Summit Eye Center Ph 1 Parking Exp FDP
09/10/2018 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home