Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Corrections
|
07/27/2018
|
07/27/2018
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PLATTING. A minor plat combining Lots 2 and 3 into a single lot shall be submitted, approved and recorded prior to the issuance of any building permits.
|
|
Corrective Action Required
BUILDING ELEVATIONS. Label the roof color.
|
|
Corrective Action Required
PROPERTY LINES. Label the property line dimensions.
|
|
Corrective Action Required
ACCESS EASEMENT. Show and label the Access Easement from Oldham Pkwy.
|
|
Corrective Action Required
UTILITY EASEMENTS. Label and dimension all utility easements.
|
|
Corrective Action Required
FENCE DETAIL. Provide a detail of the pipe rail fence used to secure the site.
|
|
Corrective Action Required
SIGNAGE. For your information, sign permit applications shall be required to be submitted for administrative staff approval prior to the installation of any sign.
|
|
|
Engineering Review
|
Corrections
|
07/27/2018
|
07/24/2018
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Revise the sidewalk ramp location to direct the accessible route toward SE Oldham Pkwy rather than SE Oldham Court. The ADA Accessible Ramp will be just on the north side of the existing concrete flume.
|
|
Corrective Action Required
Sheet 3: The "Streets" note incorrectly indicates no sidewalk along SE Oldham Pkwy is required. Please revise.
|
|
Corrective Action Required
Sheet 4: There are many occurances of text-overlapping, please revise for clarity.
|
|
Corrective Action Required
Sheet 5: The bottom of the detention basin appears to be mostly flat. Please ensure that water is able to get from the inflows to the outflow location without causing standing water.
|
|
Corrective Action Required
Sheet 9: A new water meter is required. Locate per City requirements.
|
|
Corrective Action Required
Storm Water Drainage Report:
• Incude “Preliminary” in the title.
• Include existing and proposed drainage area maps.
• It appears that portions of the site drain to the north and east in both existing and proposed conditions. Please identify those areas in both existing and proposed drainage area maps.
• The report is missing required elements. I believe you have been provided a list of required elements previously, but if needed can provide it again.
|
|
Corrective Action Required
Revise plan set to reflect any revisions to the storm water study.
|
|
Corrective Action Required
Page 12: Revise pavement sections to meet City requirements.
|
|
Corrective Action Required
The Final Development Plan will require the City's FH standard detail as well as expansion of the erosion and sediment control to reflect phases prior to, during, and after construction.
|
|
|
Fire Review
|
Corrections
|
07/27/2018
|
07/24/2018
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
Knox Locks
Corrective Action Required
IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Actionrequired. Knox padlock will be required on the gate.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Action required: Access inside the fenced area to the hydrant behind the building shall be maintained at all times. The lane from north gated entrance to the north border of the property shall be posted FIRE LANE -NO PARKING and the curbs painted red.
|
|
Misc.
Corrective Action Required
Access to the hydrant on the north side of the building shall be conspicuous and unobstructed by fencing and landscaping.
Action required: Provide a detail for the fence and make corrections to meet this requirement.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Action required: Fire lane accesss shall meet this requirement.
|
|
|
Building Codes Review
|
Corrections
|
07/27/2018
|
07/23/2018
|
|
Joe Frogge
|
|
Corrective Action Required
Existing water meter is no longer usable.
Action required: Modify design to depict replacement of existing water meter.
|
|
|
Traffic Review
|
No Comments
|
07/27/2018
|
07/23/2018
|
|
Michael Park
|
|
|