Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
Approved with Conditions
|
08/06/2018
|
08/06/2018
|
|
Michael Park
|
|
Design of on-street parking along Market may have comments that do not impact the Preliminary Development Plan (site plan) on the engineering plan submittals/final development plan (e.g. review of sight distance, curb transitions, etc.)
|
|
Design and/or location of sidewalk along the north property line may have comments that may or may not impact the Preliminary Development Plan (site plan) on the engineering plan submittals/final development plan (e.g. location and overlap with depicted parking lot design).
|
|
Design of driveways along the Alley will be further reviewed (e.g. turning movements) with the engineering plan/final development plan submittal, but should not impact the Preliminary Development Plan (site plan).
|
|
|
Engineering Review
|
Approved with Conditions
|
08/06/2018
|
08/06/2018
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Planning Review
|
Approved with Conditions
|
08/06/2018
|
08/06/2018
|
|
Shannon McGuire
|
|
|
Fire Review
|
Approved with Conditions
|
08/06/2018
|
08/01/2018
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Show the location of the FDC on the FDP.
8/1/2018- FDC still not shown.
|
|
Dumpsters
IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines.
The alley has numerous dumpsters about. Is there a proposed plan on how this will be handled?
|
|
|
Planning Review
|
Corrections
|
07/06/2018
|
07/06/2018
|
|
Shannon McGuire
|
|
Corrective Action Required
Please check and update the scale on sheet C.001 it does not seem to match the drawing.
|
|
Corrective Action Required
Please add the ROW widths for SW Main St and SW Market St.
|
|
Corrective Action Required
In an effort to make this building easily re-tenanted for retail use in the future staff would like to see the first floor raised to 14’.
|
|
Corrective Action Required
Please label the proposed building colors. It would be helpful if you could provide a sample of the proposed brick and color samples.
|
|
Corrective Action Required
All proposed signs are required to comply with the sign requirements as outlined in the sign section of the UDO. The elevations appear to show a raceway behind the sign. Please remove the raceway from the elevations as they are prohibited.
|
|
Corrective Action Required
On new construction in the downtown core all mechanical equipment is required to be roof mounted and screened by a parapet wall. Please note the location of all proposed mechanical equipment and include a dashed line on the elevations indication the height/location of the units in relation to the height of the screening wall.
|
|
Corrective Action Required
On new construction in the downtown core all electrical and gas meters, conduits and other equipment should be located on the rear facades. Please not the location of these on plans.
|
|
Corrective Action Required
Is a trash enclosure being proposed? If so, please provide details.
|
|
Corrective Action Required
As an FYI, backflow prevention/anti-siphon valves shall be integrated into the building design and concealed from public view. Such devices shall not be located within the public right-of-way.
|
|
Corrective Action Required
Recessed entries are required in new construction in the downtown core area. Please update the plans to show a recessed entry way.
|
|
Corrective Action Required
All Street facing facades including alley facing facades on new construction shall consist of brick on the first and second floors. Please update the plans to reflect the compliance of this requirement on the rear façade is it is adjacent to an alley and visible from SW Market St.
|
|
Corrective Action Required
New buildings shall be delineated both vertically and horizontally to reflect traditional patterns and convey a human scale. The facades of new buildings shall have vertical divisions similar in width to the pattern of existing buildings of the district. Staff would like to see additional vertical divisions be added to the facade to give the appearance of a more consistent scale in relation to existing buildings in the district.
|
|
Corrective Action Required
Is any wall mounted lighting being proposed? If so please provide details.
|
|
Corrective Action Required
Sheet L.100’s landscape worksheet, planting schedule and drawing all show different information on what is being proposed. The worksheet and planting schedule numbers are completely different while the drawing does not show any proposed landscaping. The UDO prescribes a certain number of trees and shrubs be planted on the site based on the street frontage and total land area. While I understand this not the typical method of development for Downtown Lee’s Summit the only process to seek relief from this requirement is to request a modification by submitting a written request that includes justification. This modification request would be supported by staff as it would be consistent with the development of the downtown core.
|
|
Corrective Action Required
Staff has reviewed the inventory of currently available parking in the vicinity of the proposed building and feels that there is sufficient capacity of public parking spaces in the area to support the proposed use. Please remove the parking lot from the proposal as staff feels that it is not warranted. Should you choose to proceed with proposing the parking as submitted, lot Staff’s recommendation to the Planning Commission and City Council will be to remove the parking lot from the proposal. That being said staff has reviewed the proposal with the parking lot as presented.
|
|
Corrective Action Required
Parking lots require a 20’ setback from the ROW and 6’ setback from the side/rear yards. While I understand this not the typical method of development for Downtown Lee’s Summit the only process to seek relief from this requirement is to request a modification by submitting a written request this includes justification.
|
|
Corrective Action Required
Please label the minimum width of the parking lot drive and aisle widths.
|
|
Corrective Action Required
All commercial developments providing parking lots accommodating 11 or more parking spaces shall provide parking lot lighting in accordance with Article 7 of the UDO. Please provide a photometric plan and parking lot lighting details to include the type of fixtures and light pole height.
|
|
Corrective Action Required
Please label the dimensions of the ADA parking stalls and aisle.
|
|
Corrective Action Required
Please provide the ADA parking sign details.
|
|
Corrective Action Required
The character of the buildings in the downtown core are that of commercial store fronts that are primarily glass. In an effort to blend the old with the new and maintain a consistent street scape please ensure the windows on the first floor are stretched from pilaster to pilaster.
|
|
|
Traffic Review
|
Corrections
|
07/06/2018
|
07/06/2018
|
|
Michael Park
|
|
Corrective Action Required
It appears the site and alleys can accommodate a passenger vehicle and single unit truck (delivery truck/trash truck) in all directions of travel/turns. However, a passenger vehicle would have difficulty exiting the parking lot adjacent to Market and use of the alley towards Market without obstructing conflicting traffic. This could be improved by increasing the radius on the southwest corner of the westerly driveway to this parking lot to approximately 25'. This should have no impact on the currently shown parking layout.
|
|
Corrective Action Required
Widen the east-west alley towards the north to the extent possible (adjacent to the utility enclosure/easement). There appears to be a few feet of unobstructed space between the easement and curb that may be available for additional widening to better accommodate two-way traffic and improve traffic visibility.
|
|
Corrective Action Required
Some improvements across the alley at Market and at the southeast corner of the same intersection may be needed to tie existing conditions into the development plan.
|
|
Corrective Action Required
Was there a proposal to provide sidewalk from W. Main Street to the public lot on Market (north side of the project) in consideration of a 2-hour parking restriction for all parking along W. Main Street?
|
|
|
Engineering Review
|
Corrections
|
07/06/2018
|
07/06/2018
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
The "Sanitary Study" dated June 22, 2018 is incomplete. The study contained numerous errors, and did not address the primary concern for this site, which is addressing potential downstream issues with the sanitary sewer after development. Will Lot 1 be directed a different direction on the relocated sanitary sewer line? Page 3 of the report would seem to indicate that all sanitary sewer flows will be directed to the south, but this assumption is vague. The primary conclusions contained within the report are based on a 20 year old study which is outdated and no longer relevant. The City has almost doubled in size since the production of this report.
|
|
Corrective Action Required
Errors Contained in the Sanitary Study: 1) 1998 study is outdated and no longer relevant, and the sanitary sewer system must be analyzed to points (to be determined) downstream of this development, 2) page 3 of the report references Section 5500 of the APWA, which the City does not recognize for sanitary sewers, 3) page 4 appears to contain a calculation error for the peak inflow (i.e., rainfall intensity should be 6.38, not 3.10 inches per hour), 4) conversion factor from cfs to gallons per day appears incorrect, 5) peak base flow should be based on residential units rather than a flat 1500 gallons per day per acre, 6) the conclusion section of the report contains a contradictory statement (i.e., ...will create not create a capacity issue), 7) page 4 provides a proposed condition analysis that completely neglects the hydraulic grade line of the receiving sewer, and 8) page 4 of the report provides an existing condition analysis that neglects the fact that there are known capacity issues downstream of the site.
|
|
Corrective Action Required
The Sanitary Study was missing the following items: 1) off-site drainage area map. 2) identification of off-site manholes and off-site sanitary sewer lines, 3) calculations of the flow within each segment of sanitary sewer line, slope, maximum capacity running nearly full, hydraulic grade line at the design flow, etc.
|
|
Corrective Action Required
The "Macro Storm Water Drainage Study" dated June 22, 2018 (hereinafter referred to the stormwater study) states that detention is not required due to the exception listed in Section 5601.3.A.3 of the Design and Construction Manual. However, this section of the Design and Construction Manual only pertains to sites that have an increase in impervious surface area less than or equal to 10% of that previously existing. In other words, this logic does not meet the cited reference within the Design and Construction Manual.
|
|
Corrective Action Required
The City has reviewed the particular situation of this site, and has concluded that stormwater detention, including 40 hour extended detention, is not required based on the fact that it meets the design exception listed in Section 5601.3A.2, not 5601.3A.3. For purposes of this site, it shall be considered as impervious coverage for Lot 1.
|
|
Corrective Action Required
Why is the SCS method being used to determine peak runoff within the stormwater report? Wouldn't it make more sense to use the rational method to calculate peak flow rates?
|
|
Corrective Action Required
It was our understanding that the stormwater report was to be scoped more along the lines of a stormwater memorandum, describing why detention is not required. It was also our understanding that a new curb inlet on the west side of Main St. would be constructed along with the improvements. The addition of the parking lot to the site, on an area previously covered with grass and in a depressed condition raises additional concerns for street flooding and icing on Main St.
|
|
Corrective Action Required
The concrete flumes are a concern, due to concerns with stormwater being directed over City sidewalks. Although this may be a good idea for managing the larger storm events, it is not a good idea for normal stormwater management. It was our understanding that the storm system would be piped beneath the sidewalk, and a new public storm inlet be installed on Main St. This is still the City's expectation.
|
|
Corrective Action Required
The location of the curb inlet on Main St. should be shown.
|
|
Corrective Action Required
Sheet C.001: There is no mention or indication of the abandonment of the existing sanitary sewer, and re-routing to the northeast either in the notes or plans. Please be specific about what is going to occur both in the notes and the plans. Ensure that all affected sheets (i.e., not just this sheet) are updated.
|
|
Corrective Action Required
Sheet C.001: Under "Site Improvement Notes", there is no mention of the sanitary sewer removal, abandonment, relocation, etc. Storm Sewer note and Storm Water Detention note and Storm Water Quality elements note references the wrong citation within the Design and Construction Manual (i.e., it is 5601.3A.2). Finally, no mention of the additional curb inlet is shown under the SW Main and Market St. note.
|
|
Corrective Action Required
Sheet C.200: Grading is shown near the southwest corner of the project which appears to cross the property line. Has this been discussed with the owner of this property? In addition, the proposed versus existing contour elevations within the private alley do not appear to make sense (e.g., proposed elevations do not tie into the existing elevations shown within the alley). Is there a retaining wall that we do not know about?
|
|
Corrective Action Required
Sheet C.300: It was our understanding that the existing sanitary sewer bisecting the property would be removed and/or abandoned in place, and relocated along the northern property line. Nothing on this sheet would indicate this is the case. Please revise as appropriate.
|
|
|
Fire Review
|
Approved with Conditions
|
07/06/2018
|
06/25/2018
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Show the location of the FDC on the FDP.
|
|
Dumpsters
Corrective Action Required
IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines.
The alley has numerous dumpsters about. Is there a proposed plan on how this will be handled?
|
|
|