Summary
PL2018030
Aldersgate Church storage building
Commercial Final Development Plan
Commercial Final Development Plan
Withdrawn
02/27/2018
ALDERSGATE METHODIST CHURCH
Locations
Contacts
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Corrections 03/14/2018 03/16/2018
Hector Soto Jr.
Corrective Action Required
03/16/2018

PAVED ACCESS. A paved access drive shall be provided from the existing parking lot to the proposed building.
Corrective Action Required
03/16/2018

EXTERIOR MATERIALS. The proposed detached garage is required to be similarly designed and constructed to the church building by using similar or compatible exterior materials. The proposed metal building exterior is not allowed.
Corrective Action Required
03/16/2018

EXTERIOR LIGHTING. Is any wall-mounted exterior lighting proposed on the garage? Any proposed fixtures shall have full 90-degree cut-offs so as to direct light downward. No floodlights are allowed. Light fixtures shall be metal halide or LED.
Traffic Review No Comments 03/14/2018 03/15/2018
Michael Park
Engineering Review Corrections 03/14/2018 03/15/2018
Sue Pyles, P.E.
Corrective Action Required
03/15/2018

Please include a hard surface for access.
Corrective Action Required
03/15/2018

Include finished floor elevation for the proposed building and add both existing and proposed contours.
Corrective Action Required
03/15/2018

The current submittal shows the garage addition drawn in on a plan sheet from an adjacent project. That plan sheet was prepared for that specific project by an engineer who is not the applicant on this project. Please do not use that plan sheet for the resubmittal unless the engineer signs and seals the sheet and clearly indicates the limits of this project.
Fire Review Approved with Conditions 03/05/2018
Jim Eden
Code Statement
Corrective Action Required
03/05/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 02/27/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/27/2018 Receipt Receipt for transaction: 2018-000684
02/27/2018 Letter Routing Sheet - FDP
03/16/2018 Letter Applicant Letter - FDP (DFDP)
03/19/2018 Drawing site plan
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents