Planning Application Status

PL2017157




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017157
Pergola Park, 4th Plat Sanitary Sewer
Engineering Plan Review
Engineering Plan Review
Expired
07/25/2017
M-III LONGVIEW LLC
Locations
Contacts
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
OLSSON ASSOCIATES (SHANNON BUSTER), Address:1301 Burlington Rd, Suite #100, Phone:(816) 299-4327  
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 01/17/2018 01/17/2018
Sue Pyles, P.E.
Engineering Review Corrections 12/22/2017 12/27/2017
Sue Pyles, P.E.
Corrective Action Required
12/27/2017

Lots 82-83, 96-104, 107 on this plat and Future Lots 1-3 all require 12" Wyes, for a total of 15. Please revise the Engineer's Estimate of Probable Construction Costs accordingly. My previous review comment incorrectly indicated 12.
Engineering Review Corrections 10/18/2017 10/18/2017
Sue Pyles, P.E.
Corrective Action Required
10/16/2017

Label the proposed easemnt along SW Pergola Park Dr, and also label the existing dashed lines in the same area.
Corrective Action Required
10/16/2017

Sanitary Sewer Line 2 at approximate Sta 11+30 does not appear to have adequate horizontal separation of 5' with the adjacent storm sewer structure. Review and revise as needed.
Corrective Action Required
10/16/2017

Doghouse MHs are not allowed. Please revise MH 1-5 accordingly. Revise the estimate, as well. Please excuse my oversight on the previous review.
Corrective Action Required
10/16/2017

Revise the Engineer's Estimate of Probable Construction Costs to Either separate the 8" wyes (12) and 12" wyes (12) or combine to show 24 each. there are 3 existing service lines already in place, so there are 24 total new.
Corrective Action Required
10/16/2017

Revise the Estimate of Quantities on Sheet C202 to match the revised Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
10/19/2017

Please revise the plans to match any revisions to the Final Plat, and coordinate with all public plans for consistency.
Engineering Review Corrections 08/15/2017 08/10/2017
Sue Pyles, P.E.
Corrective Action Required
08/09/2017

Sheet C202: The Sanitary Line Removal quantity shown in the Estimate of Quantities does not appear to include the 8.48 LF at the west end of the removal. Please revise accordingly.
Corrective Action Required
08/09/2017

Sheets 205 & 206: Please revise the first General Note to indicate "cut-in wye" connections for all laterals. Please note that there are laterals on both 8" and 12" mains.
Corrective Action Required
08/09/2017

Sheets 205 & 206: Please verify the appropriate horizontal separation has been provided between the sanitary sewer lines and storm sewer lines & structures and between the sanitary sewer lines and water lines. If necessary, revise as needed to meet the requirements. Please note this does not refer to the area included in the previous email with Gene Williams.
Corrective Action Required
08/09/2017

Please label all manholes shown. Label all existing manholes in the plan set with the City's MH number.
Corrective Action Required
08/09/2017

Please revise the plans to match any revisions to the Final Plat, and coordinate with all public plans for consistency.
Corrective Action Required
08/09/2017

Please verify that all easements are labeled throughout the plan set.
Corrective Action Required
08/10/2017

Sheet C208: The details on this sheet are outdated. Please revise.
Corrective Action Required
08/10/2017

The 12" PVC quantity included in the Engineer's Estimate of Probable Construction Costs appears incorrect. Please revise.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
08/15/2017 Letter PW-Comment Letter (Engineering Plans)
10/11/2017 Plans C201 COVER SHEET
10/11/2017 Plans C202 GENERAL NOTES
10/11/2017 Plans C203 GENERAL LAYOUT
10/11/2017 Plans C204 DEMOLITION PLAN
10/11/2017 Plans C205 SANITARY SEWER PLAN & PROFILE
10/11/2017 Plans C206 SANITARY SEWER PLAN & PROFILE
10/11/2017 Plans C207 DETAIL SHEET
10/11/2017 Plans C208 DETAIL SHEET
10/11/2017 Plans C209 SANITARY SEWER TABLES
10/19/2017 Letter DE-Comment Letter (Engineering Plans)
12/15/2017 Plans C201 COVER SHEET
12/15/2017 Plans C202 GENERAL NOTES
12/18/2017 Plans C203 GENERAL LAYOUT
12/18/2017 Plans C204 DEMOLITION PLAN
12/18/2017 Plans C205 SANITARY SEWER PLAN & PROFILE
12/18/2017 Plans C206 SANITARY SEWER PLAN & PROFILE
12/18/2017 Plans C207 DETAIL SHEET
12/18/2017 Plans C208 DETAIL SHEET
12/18/2017 Plans C209 SANITARY SEWER TABLES
12/18/2017 Plans C201 COVER SHEET
12/18/2017 Plans C202 GENERAL NOTES
12/27/2017 Letter DE-Comment Letter (Engineering Plans)
01/17/2018 Plans C203 GENERAL LAYOUT
01/17/2018 Plans C204 DEMOLITION PLAN
01/17/2018 Plans C205 SANITARY SEWER PLAN & PROFILE
01/17/2018 Plans C206 SANITARY SEWER PLAN & PROFILE
01/17/2018 Plans C207 DETAIL SHEET
01/17/2018 Plans C208 DETAIL SHEET
01/17/2018 Plans C209 SANITARY SEWER TABLES
01/17/2018 Plans C201 COVER SHEET
01/17/2018 Plans C202 GENERAL NOTES
01/19/2018 Activity Document Fees PL2017157 Pergola Park 4th Sanitary
03/15/2018 Letter DE-Engineering Plans Approval Letter
11/07/2019 Activity Document PL2017157 Pergola Park 4th Plat MDNR Conc. Letter SAN
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home