Planning Application Status

PL2017152




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017152
Pergola Park, 4th Plat
Final Plat
Final Plat
Withdrawn
07/21/2017
M-III LONGVIEW LLC
Locations
Contacts
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
INSPIRED HOMES LLC, Address:1300 NW BRIARCLIFF PKWY STE 250, Phone:(816) 548-3300  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
Reviews
Review Type Outcome Est. Completion Date Completed
GIS Review Corrections 10/22/2018
Kathy Kraemer
Corrective Action Required
10/22/2018

NEED DIMENSION, RADIUS, & ITB ON TRACT O (THE PART IN ROADWAY)
Engineering Review Approved with Conditions 09/05/2017 09/06/2017
Sue Pyles, P.E.
DE C&O #02 Master Drainage Plan
Corrective Action Required
09/06/2017

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/06/2017

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
09/06/2017

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
09/06/2017

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
09/06/2017

A Land Disturbance Permit shall be obtained from the Public Works Department if ground breaking will take place prior to the issuance of an infrastructure permit or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/08/2017

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
Traffic Review Approved with Conditions 09/05/2017 09/05/2017
Chris Hughey
Planning Review Approved with Conditions 09/05/2017 09/05/2017
Chris Hughey
Fire Review Approved with Conditions 09/05/2017 08/31/2017
Jim Eden
Code Statement
Corrective Action Required
08/22/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. It is assumed that all houses will face a public street.
Engineering Review Corrections 08/04/2017 08/02/2017
Sue Pyles, P.E.
Corrective Action Required
08/02/2017

Please label all easements.
Corrective Action Required
08/02/2017

On Lots 96 & 97 the building line crosses the easement lines. Please trim back the building lines so that they are not in the easements.
Corrective Action Required
08/02/2017

Due to the depth of the sanitary line, the easement width in Lot 99 is inadequate. Please revise to meet the requirements of the Design and Construction Manual.
Corrective Action Required
08/02/2017

Please either provide justification for the varying right-of-way widths throughout the plat or standardize the widths.
Planning Review Corrections 08/04/2017 08/02/2017
Jennifer Thompson
Corrective Action Required
08/02/2017

No final plat shall be recorded by the developer until the Director of Planning and Special Projects and the City Attorney have reviewed and approved the declaration of covenants and restrictions pertaining to common property as prepared in accordance with Section 5.330 of the UDO, and until the Director has received certification from the Missouri Secretary of State verifying the existence and good standing of the property owners’ association required by Section 5.340 of the UDO. In addition, the approved Declaration of Covenants, Conditions and Restrictions shall be recorded prior to the recording of the final plat.
Corrective Action Required
08/02/2017

A final plat shall be approved and recorded prior to any building permits being issued. All subdivision-related public improvements must be complete prior to approval of the final plat by the City Council unless security is provided in the manner set forth in UDO Section 16.340.
Corrective Action Required
08/03/2017

All Lots and Tracts shall be labeled with their respective addresses. Address assignment shall come under separate cover.
Legal Description
Corrective Action Required
08/03/2017

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
08/03/2017

It was noted 6-foot sidewalks are proposed along Pergola Park Dr. and Redbuck Circle. The minimum sidewalk width is 5 feet, however if a sidewalk is located adjacent to a curb with no grassy area, a 6 foot sidewalk is required.
Corrective Action Required
08/03/2017

Sidewalks are required along the south side of SW Pergola Park Dr., the west side of SW Grandstand Circle, and both sides of SW Redbuck Circle. Currently there are no sidewalks adjacent to Tract G within SW Pergola Park 2nd Plat, installing sidewalks along both sides of Tract N will create a gap in the sidewalk connectivity. The sidewalks will need to be extended to SW Rockbridge Dr.
Corrective Action Required
08/03/2017

Provide additional detail in the vicinity map, to include street names for reference.
Corrective Action Required
08/03/2017

On each sheet provide summary tables referencing the Building Line/Encroachment summary and the building type matrix specific to this development. This would be similar to what can be found within Pergola Park 3rd Plat.
Corrective Action Required
08/03/2017

Label all proposed easements and the easement dimensions.
Corrective Action Required
08/03/2017

Can the "house" label be removed? An address can be labeled on the lot without the house reference, this additional label seems to make it a bit cluttered.
Corrective Action Required
08/03/2017

Please provide the square footage of the Alley tracts.
Corrective Action Required
08/03/2017

A Vacation of Easement application shall be required to vacate the 20-foot easement running through Tract N, Lots 103, 102, 93, 94, 95, 83, 82, and 81. Prior to the approval of the vacation of easement, the relocated sanitary sewer line shall receive substantial completion.
Fire Review Approved with Conditions 08/04/2017 07/27/2017
Jim Eden
Code Statement
Corrective Action Required
07/27/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. It is assumed that all houses will face a public street.
Traffic Review Corrections 08/04/2017 07/27/2017
Michael Park
Corrective Action Required
07/27/2017

Review and comments pending for the roadway design may or may not impact right-of-way and property lines.
Corrective Action Required
07/27/2017

Sidewalk should be on both sides of Pergola Park Dr. and Redbuck Cir.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $781.00 $781.00 Paid 07/21/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 09/12/2017 05:00 PM Council Chambers 09/12/2017 05:00 PM
Public Hearing Review
Pending
City Council Ordinance 09/21/2017 06:15 PM Council Chambers 09/21/2017 06:15 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
07/21/2017 Receipt Receipt for transaction: 2017-005153
07/21/2017 Letter Routing Sheet
08/07/2017 Letter Applicant Letter - FP (DRCF)
08/22/2017 Letter Resubmittal Routing Sheet
09/08/2017 Plans 017-0264 Pergola Park - 4th Plat 08.22.2017
12/12/2017 Letter PL2017-152 FP Pergola Park, 4th PC
12/21/2017 Plans V_FPT_70264 Pergola Park 4th Plat 12.15.2017
01/17/2018 Plans V_FPT_70264 Pergola Park 4th Plat 01.08.2018
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home