Planning Application Status

PL2017078




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017078
SUMMIT EYE CENTER
Commercial Final Development Plan
Commercial Final Development Plan
Approved
04/11/2017
UNITY REALTY LLC
Locations
Contacts
SUMMIT EYE CENTER LLC, Address:1621 NW BLUE PKWY, Phone:(816) 246-2111  
UNITY REALTY LLC, Address:1901 NW BLUE PKWY, Phone:(816) 251-3593  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
NEWMARK ZIMMER, Address:1485 SW MARKET ST, Phone:(816) 679-4954  
MENC LLC, Address:1621 NW BLUE PARKWAY  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 07/31/2017 07/27/2017
Sue Pyles, P.E.
Engineering Review Approved with Conditions 07/31/2017 07/27/2017
Sue Pyles, P.E.
DE Engineers Estimate
Corrective Action Required
07/27/2017

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $11,964.90 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/27/2017

Private pavement sections shall either follow Article 12 of the UDO or Table LS-2 or LS-3 of the Design & Construction Manual for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
07/27/2017

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
07/27/2017

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
07/27/2017

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
07/27/2017

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Administration Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
Fire Review Approved with Conditions 07/31/2017 07/26/2017
Jim Eden
Code Statement
Corrective Action Required
07/24/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Planning Review No Comments 07/31/2017 07/25/2017
Hector Soto Jr.
Planning Review No Comments 07/18/2017 07/19/2017
Hector Soto Jr.
Traffic Review No Comments 07/18/2017 07/17/2017
Michael Park
Engineering Review Corrections 07/18/2017 07/14/2017
Sue Pyles, P.E.
Corrective Action Required
07/14/2017

Some of the rip rap is shown with hatching in the plans, and some is not. Please show the rip rap the same throughout the plan sets for consistency or explain.
Corrective Action Required
07/14/2017

Revise the quantities for the subgrade items on the Summit Village Corp Park estimate. They should be greater than the asphalt quantity because they extend beyond the c & g.
Corrective Action Required
07/18/2017

Please include subgrade items and an item for a 5x3 Curb Inlet (Structure 6-2) in the Summit Eye Center estimate.
Corrective Action Required
07/18/2017

Sheet C012: Please check the upstream rim elevation in the drainage tables and revise if needed.
Corrective Action Required
07/18/2017

It doesn't appear that the ES 5-1 drainage area of 1.20 ac has been included in Line 8 downstream calculations. Please check and revise as needed.
Corrective Action Required
07/18/2017

Please provide information correlating the proposed condition drainage areas shown in Ehibit 4 of the Summit Village 1st Plat Stormwater Drainage Report and the drainage areas included in the drainage plan included in the plans. This information can be provided in an email.
Fire Review Approved with Conditions 07/18/2017 07/13/2017
Jim Eden
Code Statement
Corrective Action Required
07/11/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Hydrants
Partial Correction
07/11/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: The proposed hydrant near Building 1B shall be installed prior the construction of 1B.
Planning Review No Comments 06/23/2017 06/26/2017
Hector Soto Jr.
Engineering Review Corrections 06/23/2017 06/23/2017
Sue Pyles, P.E.
Corrective Action Required
06/23/2017

Please review all standard details in the plan sets. Many details have been recently updated and are available online.
Corrective Action Required
06/23/2017

Please check and revise the Engineer's Estimate of Probable Construction Costs. It appears to be missing some stormwater quantities.
Fire Review Approved with Conditions 06/29/2017 06/23/2017
Jim Eden
Code Statement
Corrective Action Required
06/22/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Hydrants
Partial Correction
06/23/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: The proposed hydrant near Building 1B shall be installed prior the construction of !B.
Fire Review Approved with Conditions 06/06/2017 06/07/2017
Jim Eden
Code Statement
Corrective Action Required
06/07/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Hydrants
Corrective Action Required
06/07/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: The proposed hydrant near Building 1B shall be installed prior the construction of !B.
Engineering Review Corrections 06/06/2017 06/06/2017
Sue Pyles, P.E.
Corrective Action Required
06/02/2017

Sheet C009: Revise "C014" to "C015" in the Bioretention labels.
Corrective Action Required
06/02/2017

Sheet C009: Label the wye to be cut in at the connection to the existing saitary sewer.
Corrective Action Required
06/02/2017

Sheet C010: The Line 6 pipe size does not match between the Plan and Profile views. Revise as needed. Verify the Drainage Tables on Sheet C012 reflect the correct pipe size.
Corrective Action Required
06/02/2017

Sheet C010: The elevations at the right side of the Line 6 profile are cut off. Please revise.
Corrective Action Required
06/02/2017

Sheet C012: Update the 100-year drainage tables to reflect the correct drainage area for C.I. 6-2.
Corrective Action Required
06/02/2017

Sheet C013: Revise all paving related details so the subgrade design meets the UDO Article 12 requirements.
Corrective Action Required
06/02/2017

Include standard details for the proposed structures in the plan sets.
Corrective Action Required
06/06/2017

Sheet C102: Verify Items 7 & 11 in the Estimate of Quantities Table and revise if needed.
Corrective Action Required
06/06/2017

Sheet C103: Delineate Tract A from the public right-of-way.
Corrective Action Required
06/06/2017

Sheet C105: Revise all paving related details so the subgrade design meets the Design and Construction Manual Section 5200 requirements.
Corrective Action Required
06/06/2017

Sheet C107: Label the swale profiles.
Corrective Action Required
06/06/2017

Sheet C107: Show the swale cross-section locations in the Plan views.
Corrective Action Required
06/06/2017

Sheet C113: Revise the Concrete Pad elevation shown in Detail A.
Corrective Action Required
06/06/2017

Sheet C114: Include the street names on the Drainage Plan.
Corrective Action Required
06/06/2017

Sheet C115: Revise the drainage area for F.I. 8-2 in the drainage tables to match the drainage map and update the calculations to reflect the revision.
Corrective Action Required
06/06/2017

Sheet C115: Revise the rim elevation for F.I. 9-3 in the drainage tables to match the elevation shown in the storm storm sewer profile.
Corrective Action Required
06/06/2017

Sheet C116: Remove the Under Curb Drain detail, it isn't applicable to this project.
Corrective Action Required
06/06/2017

Sheet C113:Revise Detail A so that the plan and profile views are oriented the same direction.
Corrective Action Required
06/06/2017

Sheet C113: Rename the "Proposed Detention Basin Routing" table, as it does not show routing.
Corrective Action Required
06/06/2017

Sheet C113: The Top of Berm elevation shown in Detail A does not match the Top of berm elevation shown in the Line 7 Profile. Revise as needed.
Corrective Action Required
06/06/2017

Sheet C113: Include structural details for the Basin Outlet Structure to ensure it is constructed correctly.
Corrective Action Required
06/06/2017

If the Detention Basin will be used as a temporary sediment basin, include required information in the plans for that use.
Corrective Action Required
06/06/2017

Please note that As-Built drawings will be required for the detention Basin prior to Substantial Completion.
Corrective Action Required
06/06/2017

Check and revise the quantity for "Field Inlets, Std 4' x 4' Inside" on the Engineer's Estimate of Probable Construction Costs to match the plans.
Corrective Action Required
06/06/2017

Include quantities for the Detention Basin items on the Engineer's Estimate of Probable Construction Costs.
Planning Review Corrections 06/06/2017 06/06/2017
Hector Soto Jr.
Corrective Action Required
06/06/2017

SITE DATA TABLE. Revise the table to reflect the elimination of Tract A as a separate parcel that will instead be absorbed into the adjacent lots (refer to comments from the related plat application).
Corrective Action Required
06/06/2017

TRASH ENCLOSURE. The trash enclosure configuration shown on the civil plans still does not match the trash dumpster and generator enclosure footprint shown on the Trash Enclosure Details sheet (Sheet A923) prepared by SR Architects that was included in the FDP submittal (see accompanying copy of Sheet A923). The detail sheet from SR Architects shows a structure with overall dimensions of 13'-4" deep x 43'-4" to house both a trash dumpster and a generator side by side. Please reconcile the drawings. If an exterior generator is being proposed, it shall be fully screened on all four sides similarly as the trash dumpster.
Corrective Action Required
06/06/2017

LIGHTING. - Show the location of any wall packs on the building elevations to the extent possible. - Incorporate the use of any wall packs into the photometric plan light level calculations. - Provide manufacturer specifications for any wall packs for compliance review against the standards of Article 7 of the UDO.
Corrective Action Required
06/06/2017

ROOF PENETRATIONS/EQUIPMENT. - Please confirm that the intent is to still provide a well on the roof to house any mechanical equipment and roof penetrations so they are fully hidden from view. - Any necessary roof penetrations on the pitched roof portion shall be shown on the elevations to the extent possible. Visible roof penetrations shall be placed in architectural appurtenances. Small vent pipes may be painted to blend in with the roof to disguise their appearance.
Traffic Review Approved with Conditions 06/06/2017 06/05/2017
Michael Park
Corrective Action Required
06/05/2017

Suggest providing sidewalk on-site connecting the development to the surrounding future development and connecting to the public sidewalk network along Rosemary and Blue Pkwy. If not done at this time, sidewalk on-site providing these connections will be required for adjacent development.
Planning Review Corrections 04/28/2017 05/01/2017
Hector Soto Jr.
Corrective Action Required
06/06/2017

SITE DATA TABLE. Provide a site data table on the site plan that includes the following information: zoning district; lot area; building square footage; floor area ratio; impervious lot coverage in sq. ft. and % of lot area; open area in sq. ft. and % of lot area; parking spaces required; parking spaces provided.
Corrective Action Required
05/01/2017

FLOODPLAIN. Revise Flood Certification Note #1 on Sheet C002 to cite the FIRM Panel information used to make the determination. Use the most current FEMA information from 2017.
Corrective Action Required
05/01/2017

PROPERTY BOUNDARY INFORMATION. Label the property line dimensions, bearings and radius information for the subject proposed Lot 1.
Corrective Action Required
05/01/2017

STREETS. Label the right-of-way widths, radii, centerlines and street grades for both NW Blue Pkwy and the proposed NW Rosemary Court.
Corrective Action Required
05/01/2017

SIDEWALKS. - Label the existing 5' sidewalk along the east side of NW Blue Pkwy. - Please clarify the notes regarding the sidewalk and NW Rosemary Court as "to be built by others". Both shall be constructed by the developer as part of the infrastructure requirements prior to plat approval and building permit issuance.
Corrective Action Required
05/01/2017

PARKING LOT. - A temporary asphalt curb shall be provided along the east boundary of the Phase 1A parking lot where it will be expanded in the future. Wheel stops are not allowed to line the parking lot border. - The labeled number of parking spaces in the bay immediately in front of the building shall be revised from 8 to 9. - For your reference regarding the future parking lot expansion, the dashed-in limits of the parking lot shown immediately north of the Phase 1A building does not meet the minimum 20' parking lot setback from the right-of-way.
Corrective Action Required
05/01/2017

DRIVE AISLE WIDTHS. The driveway entrance into Lot 1 and the internal parking lot drive aisles are shown as 24' wide from back-of-curb to back-of-curb. Aisles intended for two-way traffic shall have a minimum pavement width of 24' (28' back-of-curb to back-of-curb).
Corrective Action Required
05/01/2017

EASEMENTS. There are dashed lines seemingly connecting the U/E running parallel to NW Blue Pkwy to the building's SW corner. Is this supposed to indicate an easement? If so, please identify the lines as such and the easement type. The building encroaches onto the lines. Buildings cannot encroach into a public easement and will require the building be shifted or a portion of any public easement to be vacated under separate application.
Corrective Action Required
05/01/2017

TRASH ENCLOSURE. - The trash enclosure configuration shown on the civil plans does not match the trash enclosure footprint shown on the Trash Enclosure Details sheet (Sheet A923) prepared by SR Architects that was included in the FDP submittal. The detail sheet from SR Architects shows a generator being located next to the trash enclosure. Please reconcile the drawings. If an exterior generator is being proposed, it shall have to be full housed with a similar structure as the trash dumpsters up to the height of any generator. - Label the proposed colors for all trash enclosure materials.
Corrective Action Required
05/01/2017

ADA PARKING SPACES. - Each parking space shall have an R7-8 sign (as referenced in the MUTCD) posted at the head of each space. The sign shall be mounted between 36" and 60" above grade, measured to the bottom of the sign. - Provide a detail of the sign, including the mounting information.
Corrective Action Required
05/01/2017

LANDSCAPING. - To meet minimum ordinance requirments, revise the height of the White Pines on Sheets L001 and L002 from 6'/7' to 8'. - To meet minimum ordinance requirments, revise the caliper size of the Pacific Sunset Maple on Sheet L002 from 2" to 3". - Note #3 on Sheets L001 and L002 state that all disturbed areas shall be restored with seed. Per ordinance, open areas not otherwise covered with landscape material (e.g. mulch, rock, etc.) shall be sodded, not seeded. Larger disturbed areas outside of Lot 1 can be seeded to restore vegetation, but Lot 1 shall be sodded in accordance with ordinance requirements where it is not otherwise landscaped. - Complete the accompanying landscaping calculation worksheet to show how the proposed numbers of trees and shrubs on Lot 1 meets the minimum landscaping requirements.
Corrective Action Required
05/02/2017

LIGHTING. - Show the location of any wall packs on the building elevations to the extent possible. - Incorporate the use of any wall packs into the photometric plan light level calculations. - Provide manufacturer specifications for any wall packs for compliance review against the standards of Article 7 of the UDO.
Corrective Action Required
05/02/2017

ROOF PENETRATIONS/EQUIPMENT. - Please confirm that the intent is to still provide a well on the roof to house any mechanical equipment and roof penetrations so they are fully hidden from view. - Any necessary roof penetrations on the pitched roof portion shall be shown on the elevations to the extent possible. Visible roof penetrations shall be placed in architectural appurtenances. Small vent pipes may be painted to blend in with the roof to disguise their appearance.
Corrective Action Required
05/02/2017

PLAN REVIEW/APPROVAL SCOPE. Please note that the review and approval process on the submittal is limited to the the Phase 1A improvements. The future 12,000 sq. ft. building addition, parking lot expansion, etc., outside of Phase 1A shall be reviewed and approved under future separate application.
Corrective Action Required
05/02/2017

PLATTING. No application has as of yet been submitted for the platting of the subject property. No final development plan approval or building permit shall be issued until such time as the property is platted and the required public infrastructure improvements related to the plat are completed.
Engineering Review Corrections 04/28/2017 04/28/2017
Sue Pyles, P.E.
Corrective Action Required
04/14/2017

Combine the three submitted plan sets (Summit Village 1st Plat Site Improvement Plans, Summit Village 1st Plat Site Grading, Site Disturbance & Detention Plans, and Summit Eye Center Site Development Plans) into one set of plans and include “Final Development Plans” in the title.
Corrective Action Required
04/28/2017

Submit final detention, drainage and sanitary studies.
Corrective Action Required
04/28/2017

Submit an Engineer’s Estimate of Probable Construction Costs.
Corrective Action Required
04/28/2017

Label the wye to be cut in at the connection to the existing sanitary sewer.
Corrective Action Required
04/28/2017

Verify that the trees adjacent to the sanitary sewer at the southwest corner of the lot meet separation requirements.
Corrective Action Required
04/28/2017

Check and revise standard details, many are incorrect.
Corrective Action Required
04/28/2017

Curb Inlet 6-2 does not appear to be in a low point, check and revise as needed.
Corrective Action Required
04/28/2017

Check and revise the 950 contour at the private drive, it appears incorrect.
Corrective Action Required
04/28/2017

If the building will be sprinklered, include a fire line, with backflow vault and backflow preventer the plans.
Corrective Action Required
04/28/2017

Label the bioretention basins throughout the plan set and include and reference details.
Corrective Action Required
04/28/2017

Include detention basin design information in the plan set.
Fire Review Corrections 04/28/2017 04/24/2017
Jim Eden
Code Statement
Corrective Action Required
04/24/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. Action required: Provide a public hydrant on the south side of future right in/right out on Blue Parkway.
Hydrants
Resolved
06/07/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Traffic Review Corrections 04/28/2017 04/18/2017
Michael Park
Corrective Action Required
04/18/2017

Street Plans - Lane widths should be 12' typical.
Corrective Action Required
04/18/2017

Street Plans - Include City Standard Details for TTC, Marking, and Signing. The markings should be revised to match type (e.g. longitudinal lines high build paint), width, size and locations per standard details. The signs should be revised (e.g. street name signs) to match standard details and location of OM's should be revised to match standard detail locations.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 04/12/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/16/2017 Letter Resubmittal Routing Sheet - FDP
07/24/2017 Letter Resubmittal Routing Sheet - FDP
10/24/2017 Plans C010 C_STM01_63182 - STORM SEWER PLAN & PROFILE
10/24/2017 Plans C011 C_DRN01_63182 - DRAINAGE PLAN
10/24/2017 Plans C012 C_TAB01_63182 - DRAINAGE TABLES
10/24/2017 Plans C013 C_DTL01_63182 - DETAIL SHEET
10/24/2017 Plans C014 C_DTL01_63182 - DETAIL SHEET 2
10/24/2017 Plans C015 C_DTL01_63182 - DETAIL SHEET 3
10/24/2017 Plans C016 C_DTL01_63182 - DETAIL SHEET 4
10/24/2017 Plans C017 C_DTL01_63182 - DETAIL SHEET 5
10/24/2017 Plans 125_SEC_A6_2017.04.28
10/24/2017 Plans 16868es-PH1 (2)
10/24/2017 Plans C001 C_TTL01_63182 - COVER SHEET
10/24/2017 Plans C002 C_GEN01_63182 - GENERAL NOTES
10/24/2017 Plans C003 C_EXC01_63182 - EXISTING CONDITIONS
10/24/2017 Plans C004 C_SIT01_63182 - SITE PLAN
10/24/2017 Plans C005 C_GEO01_63182 - GEOMETRIC PLAN
10/24/2017 Plans C006 C_GRD01_63182 - GRADING PLAN
10/24/2017 Plans C007 C_SPT01_63182 - SPOT ELEVATIONS
10/24/2017 Plans C008 C_SPT01_63182 - SPOT ELEVATION DETAILS
10/24/2017 Plans C009 C_UTL01_63182 - UTILITY PLAN
06/26/2017 Letter Applicant Letter - FDP (DFDP)
06/07/2017 Letter Applicant Letter - FDP (DFDP)
06/07/2017 Letter Applicant Letter - FDP (DFDP)
04/25/2017 Letter Routing Sheet - FDP
04/12/2017 Letter Routing Sheet - FDP
04/12/2017 Receipt Receipt for transaction: 2017-001370
07/26/2017 Letter Applicant Letter - FDP (DFDP)
01/19/2018 Activity Document Fees PL2017078 Summit Eye Center FDP
07/19/2017 Letter Applicant Letter - FDP (DFDP)
05/30/2017 Letter Resubmittal Routing Sheet - FDP
08/01/2017 Letter Applicant Letter - FDP (DFDP)
10/24/2017 Plans C116 C_DTL01_63182 - DETAIL SHEET
10/24/2017 Plans C115 C_TAB01_63182 - DRAINAGE TABLES
10/24/2017 Plans C114 C_DRN01_63182 - DRAINAGE PLAN
10/24/2017 Plans C113 C_STM01_63182 - DETENTION BASIN PLAN
10/24/2017 Plans C112 C_STM01_63182 - STORM SEWER PLAN & PROFILE
10/24/2017 Plans C111 C_ERC03_63182 - SITE DISTRUBANCE PLAN - PHASE 3
10/24/2017 Plans C110 C_ERC02_63182 - SITE DISTRUBANCE PLAN - PHASE 2
10/24/2017 Plans C109 C_ERC01_63182 - SITE DISTRUBANCE PLAN - PHASE 1
08/16/2017 Plans L004 LANDSCAPE DETAILS
08/16/2017 Plans L003 LANDSCAPE DETAILS
08/16/2017 Plans L002 LANDSCAPE PLAN - PHASE 1A
08/16/2017 Plans L001 LANDSCAPE PLAN - OVERALL
07/11/2017 Letter Resubmittal Routing Sheet - FDP
10/24/2017 Plans C117 C_DTL02_63182 - DETAIL SHEET
10/24/2017 Plans C118 C_DTL02_63182 - DETAIL SHEET 2
10/24/2017 Plans C119 C_DTL02_63182 - DETAIL SHEET 3
10/24/2017 Plans C105 C_SIT01_63182 - SITE PLAN IMPROVEMENTS
10/24/2017 Plans C106 C_GRD01_63182 - GRADING PLAN
10/24/2017 Plans C107 C_SWL01_63182 - SWALE PLAN & PROFILE
10/24/2017 Plans C108 C_SWL01_63182 - SWALE PLAN & PROFILE 2
10/24/2017 Plans C104 C_GEN02_63182 - GENERAL LAYOUT
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home