Planning Application Status

PL2017073




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017073
Lee's Summit Medical Center Tower Expansion
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/29/2017
MIDWEST DIVISION LSH LLC
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
LEE'S SUMMIT MEDICAL CENTER, Address:2100 SE BLUE PKWY, Phone:(816) 282-5000  
S&ME, Inc., Address:1615 Edgewater Drive, Suite 200, Phone:(407) 975-1273  
Gould Turner Group, Address:4400 Harding Pike. Suite 1000, Phone:(615) 297-3122  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 05/18/2017 05/08/2017
Jennifer Thompson
Traffic Review No Comments 05/18/2017 05/08/2017
Jennifer Thompson
Engineering Review No Comments 05/18/2017 05/08/2017
Jennifer Thompson
Planning Review No Comments 05/18/2017 05/08/2017
Jennifer Thompson
Traffic Review No Comments 04/12/2017 04/13/2017
Jennifer Thompson
Engineering Review No Comments 04/12/2017 04/13/2017
Chris Hughey
Planning Review Corrections 04/12/2017 04/11/2017
Jennifer Thompson
Corrective Action Required
04/11/2017

The maximum plan size is 24" x 36" with a one inch border. Please revise the plan size when resubmitting.
Corrective Action Required
04/11/2017

In the parking data table, please clarify the number of existing ADA parking stalls.
Corrective Action Required
04/11/2017

Sign permits shall be obtained prior to installation of any signs through the Development Services Department. All signs proposed must comply with the sign requirements as outlined in the sign section of the Unified Development Ordinance.
Corrective Action Required
04/11/2017

It was noted on the building permit plans that the existing condensing units will be relocated to the new 3rd floor's roof. Please indicate (with a dashed line), the location of the units on the elevation sheet. Also indicate the method of screening. For screening requirements reference the UDO (Unified Development Ordinance), Article 7.
Corrective Action Required
04/11/2017

On Sheet A2.02, is the elevation key plan diagram accurate? It appears the lettering doesn't match the corresponding elevation reference.
Corrective Action Required
04/11/2017

Please provide the lighting manufacturer's specification sheets for all proposed exterior lighting.
Fire Review Approved with Conditions 04/12/2017 04/05/2017
Jim Eden
Code Statement
Corrective Action Required
04/05/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Corrective Action Required
04/05/2017

Facility access and egress shall be maintained during construction. Provide a temporary exiting plan to the Fire Department and Codes Administration for approval if construction impairs egress from the existing building. For information only.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 03/29/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/29/2017 Receipt Receipt for transaction: 2017-001137
03/29/2017 Letter Routing Sheet - FDP
05/04/2017 Letter Resubmittal Routing Sheet - FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home