Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
04/24/2017
|
04/25/2017
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
04/28/2017
|
04/24/2017
|
|
Sue Pyles, P.E.
|
|
DE Engineers Estimate
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $2,495.04 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
|
|
DE Contact Field Eng. Inspector
Contact Public Works Department at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
PW Submit Land Disturbance (DELETE)
If groundbreaking is scheduled to take place prior to issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments/fees to the City.
|
|
|
Fire Review
|
Approved with Conditions
|
04/24/2017
|
04/24/2017
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fire protection and life safety systems shall be maintained during construction per IFC Chapter 33 and 35. For information only.
|
|
|
Traffic Review
|
No Comments
|
04/24/2017
|
04/21/2017
|
|
Michael Park
|
|
|
Engineering Review
|
Approved with Conditions
|
04/24/2017
|
04/18/2017
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $2,495.04 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
PW Submit Land Disturbance (DELETE)
Corrective Action Required
If groundbreaking is scheduled to take place prior to issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments/fees to the City.
|
|
|
Traffic Review
|
No Comments
|
03/29/2017
|
03/30/2017
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
03/29/2017
|
03/29/2017
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sheet C2.1: Please eliminate the sediment fence detail. The trench and backfill method is not allowed. Only machine-laid silt fence is allowed in Lee's Summit. It is acceptable to merely provide a note on the plan view stating "silt fence in accordance with City of Lee's Summit standards", or equivalent language.
|
|
Corrective Action Required
Sheet C3.0: Please label the new sanitary sewer line as "PRIVATE".
|
|
Corrective Action Required
Sheet C3.2, Concrete Curb and Gutter Details: Please show the aggregate and geogrid being extended a minimum of one (1) foot beyond the back of curb.
|
|
Corrective Action Required
Sheet C3.2: Standard Sidewalk and Concrete Sidewalk Details appear to contradict each other. Although no public sidewalk is being proposed for this project, we recommend a leveling course be installed beneath the concrete as shown in the "Standard Sidewalk" detail. In addition, we recommend a 1.5% maximum slope rather than 2.00% maximum slope. However, all sidewalks on this project are private, so this is only a recommendation.
|
|
Corrective Action Required
An Engineer's Estimate of Probable Construction Costs for the site work should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total. Items to include in the itemized estimate are: 1) grading to establish proper drainage, 2) sanitary sewer lines and structures, 3) storm lines and structures greater than 6" diameter, 4) parking lot grading and compaction, 5) aggregate base course for parking lot, including the area one (1) foot beyond the back of curb, 6) geogrid for parking lot, including the area one (1) foot beyond the back of curb, 7) pavement for parking lot, 8) curb and gutter, 9) adjustments to storm inlets, 10) erosion and sediment control devices and measures, and 11) final restoration, including sodding, seeding, mulch, topsoil, and fertilizer.
|
|
|
Fire Review
|
Approved with Conditions
|
03/29/2017
|
03/28/2017
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fire protection and life safety systems shall be maintained during construction per IFC Chapter 33 and 35. For information only.
|
|
|
Planning Review
|
No Comments
|
03/29/2017
|
03/27/2017
|
|
Hector Soto Jr.
|
|
|