Planning Application Status

PL2017033




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017033
POTTER REZONING
Residential Rezoning with Preliminary Development Plan
Residential Rezoning with Preliminary Development Plan
Approved
02/17/2017
CHAD O POTTER & JOANN
REZONING FROM CP-2 TO R-1
Locations
Contacts
CHAD & JOANN POTTER, Address:4001 SW HIDDEN COVE CT, Phone:(816) 682-3693  
CHAD O POTTER & JOANN, Address:4001 SW HIDDEN COVE CT  
SIMON SUN (HDR ENGINEERING, INC.), Address:4435 MAIN ST, SUITE 1000, Phone:(816) 360-2756  
WILLIAM NEDS (HDR ENGINEERING, INC), Address:3741 NE TROON DR, Phone:(816) 347-1136  
POTTER, CHAD O & JOANN, Address:4001 SW HIDDEN COVE CT  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 04/04/2017 05/05/2017
Hector Soto Jr.
Fire Review No Comments 04/04/2017 05/05/2017
Hector Soto Jr.
Engineering Review No Comments 04/04/2017 05/05/2017
Hector Soto Jr.
Planning Review No Comments 04/04/2017 05/05/2017
Hector Soto Jr.
Engineering Review Approved with Conditions 03/03/2017 04/04/2017
Gene Williams, P.E.
Corrective Action Required
04/04/2017

A private easement must be obtained for domestic water service along the access road. The location of the water meter should be shown within the right of way, and the private easement should be shown along the driveway.
Corrective Action Required
04/04/2017

The new sanitary sewer line to be installed along with the Raintree Pointe subdivision to the west of this development must be installed and a Certificate of Substantial Completion issued prior to platting.
DE C&O #06 Land Disturbance
Corrective Action Required
04/04/2017

A Land Disturbance Permit shall be obtained from the Development Services Department if ground-breaking will take place prior to issuance of a building permit.
Planning Review Corrections 03/03/2017 03/03/2017
Shannon McGuire
Corrective Action Required
03/03/2017

Label land use of all parcels within 185’ of the property to be rezoned.
Corrective Action Required
03/03/2017

It appears the proposed 20’ easement for sanitary sewer has already been recorded. Please update the label to show the document number, including book and page.
Corrective Action Required
03/03/2017

The property dimensions do not seem to match the information that is on file with Cass County. Please confirm the submitted information is correct. Should the information at Cass County be incorrect please have it updated and provide documentation acknowledging the correction.
Corrective Action Required
03/03/2017

Please provide a compatibility study for adjacent single family residential. A comparison need be made to the proposed Raintree Point, which is also being engineered by HDR Engineering.
Engineering Review Corrections 03/03/2017 03/03/2017
Gene Williams, P.E.
Corrective Action Required
03/03/2017

The new sanitary sewer line to be installed along with the Raintree Pointe subdivision to the west of this development must be installed and a Certificate of Substantial Completion issued prior to platting.
Corrective Action Required
03/03/2017

An private easement must be obtained for domestic water service along the access road. The location of the water meter should be shown within the right of way, and the private easement should be shown along the driveway.
Traffic Review No Comments 03/03/2017 03/01/2017
Michael Park
Fire Review No Comments 03/03/2017 02/28/2017
Jim Eden
Corrective Action Required
04/04/2017

Fees
Paid Fees Amount Paid Owing Date Paid
Residential Rezoning and Preliminary Development Plan fee $3,000.00 $3,000.00 Paid 02/17/2017
Legal Notice Publishing Charge $165.00 $165.00 Paid 02/17/2017
Legal Notice Publishing Charge $165.00 $165.00 Paid 02/17/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 04/11/2017 05:00 PM Council Chambers 04/11/2017 05:00 PM
Public Hearing Review
Pending
City Council Ordinance 05/04/2017 06:15 PM Council Chambers 05/04/2017 06:15 PM
Public Hearing Review
Pending
City Council Public Hearing 05/04/2017 06:15 PM Council Chambers 05/04/2017 06:15 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
02/17/2017 Letter Routing Sheet
02/17/2017 Receipt Receipt for transaction: 2017-000539
03/03/2017 Letter Applicant Letter - Dev. Apps (DRCP)
03/21/2017 Letter Resubmittal Routing Sheet
05/05/2017 Letter PC Letter
05/05/2017 Ordinance Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home