Planning Application Status

PL2017022




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017022
B&B THEATERS NEW LONGVIEW 7
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/06/2017
M-III LONGVIEW LLC
new movie theater
Locations
Contacts
BOX REAL ESTATE DEVELOPMENT, Address:440 SW LONGVIEW BLVD, Phone:(913) 735-9861  
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
OLSSON ASSOCIATES (SHANNON BUSTER), Address:1301 Burlington Rd, Suite #100, Phone:(816) 299-4327  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 05/19/2017 05/12/2017
Jennifer Thompson
Fire Review Approved with Conditions 05/19/2017 05/12/2017
Jennifer Thompson
Code Statement
Corrective Action Required
05/12/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Fire Lanes - Marking
Corrective Action Required
05/12/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Show the designated "No Parking-Fire Lane" on the Building Permit set of drawings.
Engineering Review Approved with Conditions 05/19/2017 05/12/2017
Jennifer Thompson
DE Engineers Estimate
Corrective Action Required
05/12/2017

Please submit a revised Sheet C06 showing the private sanitary sewer connecting to the public sanitary sewer via a wye connection (i.e., not a direct-connect to the manhole).
DE Contact Field Eng. Inspector
Corrective Action Required
05/12/2017

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $17,901.18 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact ROW Inspector
Corrective Action Required
05/12/2017

Contact Development Services Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
05/12/2017

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
Planning Review Approved with Conditions 05/19/2017 05/12/2017
Jennifer Thompson
Fire Review Approved with Conditions 03/24/2017 03/27/2017
Jim Eden
Code Statement
Corrective Action Required
03/27/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Fire Lanes - Marking
Corrective Action Required
03/27/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Show the designated "No Parking-Fire Lane" on the Building Permit set of drawings.
Planning Review Approved with Conditions 03/24/2017 03/24/2017
Jennifer Thompson
Corrective Action Required
03/24/2017

An agreement shall be executed between the City and developer that addresses ownership, permitted uses, maintenance responsibilities and assignments of easements, right-of-ways and adjacent property pertaining to on-street parking, parking lanes along SW Longview Blvd., right-of-way encroachments, private tracts within right-of-way and potential right-of-way vacation.
Corrective Action Required
03/24/2017

The developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, the required public improvement listed in the TIA dated, November 2, 2016, sanitary sewer improvements, and waterline improvements. No building permit shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorder' Office. All public improvements shall be substantially complete prior to issuance of any building permit within the proposed preliminary development plan, except where the timing of improvements are specifically noted in the description of condition.
Corrective Action Required
03/24/2017

Provide the manufacturer specification for all proposed, exterior lighting.
Corrective Action Required
03/24/2017

In reference to my previous comment #11, the drive width still seems to be a bit too narrow for the drive lane on the eastern most entry into the site off SW Fascination Dr. as it maneuvers around an island. The drive appears to have been widened however, it doesn't meet the 24' foot minimum. Please label the this drive width on Sheet C05.
Corrective Action Required
03/24/2017

On Sheet C04, label the temporary asphalt curbing along the proposed drive that connects the west side parking and the east side parking.
Corrective Action Required
03/24/2017

When resubmitting please only resubmit Sheets C04, C05, and C06, as those are the only sheets that need revisions.
Engineering Review Approved with Conditions 03/24/2017 03/24/2017
Gene Williams, P.E.
Corrective Action Required
03/24/2017

Please submit a revised Sheet C06 showing the private sanitary sewer connecting to the public sanitary sewer via a wye connection (i.e., not a direct-connect to the manhole).
DE Engineers Estimate
Corrective Action Required
03/24/2017

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $17,901.18 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
03/24/2017

Contact Development Services Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
03/24/2017

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
03/24/2017

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
03/24/2017

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review No Comments 03/24/2017 03/23/2017
Michael Park
Traffic Review No Comments 02/21/2017 02/23/2017
Michael Park
Engineering Review Corrections 02/21/2017 02/21/2017
Gene Williams, P.E.
Corrective Action Required
02/17/2017

The proposed sanitary sewer alignment does not follow the approved Preliminary Development Plan. In general, the approved Preliminary Development Plan showed the sanitary sewer extension to be provided to the southeast rather than towards the northeast. This proposed alignment presents a number of design issues.
Corrective Action Required
02/17/2017

The sanitary sewer along the northeast portion of Fascination Drive is too close to the future building. The minimum distance between a building and the outside of the sanitary sewer is fifteen (15) feet. It appears the sanitary sewer line is approximately eleven (11) feet from the building.
Corrective Action Required
02/17/2017

An alternative alignment of the sanitary sewer might be along Fascination Drive closer to the property line. This would require work within the parking area along Fascination Drive. The sanitary sewer would need to be placed no further than a few feet from the northeast corner of the future lot for the theater, with a private sanitary sewer lateral constructed in this location to serve the theater.
Corrective Action Required
02/17/2017

A backflow vault and backflow assembly is required outside the building near the property line, and outside any easement. The fire line must be connected via a cut-in tee. A gate valve is required prior to the vault, and also on the north side of Fascination Drive. In other words, two (2) gate valves are required; one (1) on each side of Fasciniation Drive. No valve is required on the main, however, due to the existence of a valve within 500 feet of the tee.
Corrective Action Required
02/17/2017

The location of the fire and domestic water connections are shown in the middle of a driveway. Please move the connection point outside of the driveway.
Corrective Action Required
02/17/2017

Show the locations of existing water valves along Fascination Drive.
Corrective Action Required
02/17/2017

Since the water line along Fascination is on the opposite side of the street, the domestic water tap should be shown on the south side of the street. The tap should be made prior to the gate valve prior to the backflow vault.
Corrective Action Required
02/17/2017

Please show the location of the water meter. The water meter should be fully-contained within right of way or an easement.
Corrective Action Required
02/17/2017

If comments related to the alternative sanitary sewer alignment can be adequately addressed, the street crossing for the sanitary sewer at Kessler Drive in the northeast portion of the project must be bored and cased. No open-cut installation of the sanitary sewer is allowed, except for the parking area along Fascination Drive if this alignment is desired.
Corrective Action Required
02/17/2017

Sheet L01: Please show the location of all City-owned utilities (i.e., water and sanitary sewer) on this sheet. It is difficult to determine whether conflicts exist. Trees must be a minimum of five (5) feet from sanitary sewer lines and water lines, as measured from the mature tree trunk and the outside of the utility line.
Corrective Action Required
02/17/2017

Sheet L02: Please see above comment. Please be aware that small ornamentals and shrubs are exempt from the distance requirement.
Corrective Action Required
02/17/2017

Sheet C02: Please correct the typographical errors (e.g., "exiting" versus "existing").
Corrective Action Required
02/17/2017

Sheet C04; All commercial entrances must be constructed of 8" KCMMB mix non-reinforced concrete from the sawcut to the right of way line.
Corrective Action Required
02/17/2017

Sheet C04: Please label all ADA-accessible ramps at the commercial entrances, and please add a note stating that truncated domes shall not be installed.
Corrective Action Required
02/17/2017

Sheet C04: There seems to be confusion on the distinction between drive aisle and parking stall pavement thicknesses. For purposes of the Unified Development Ordinance (UDO) Article 12 "Parking", there is not distinction between parking stalls and drive aisles in terms of pavement thickness, base, or subgrade stabilization/geogrid.
Corrective Action Required
02/17/2017

Typical pavement sections do not appear to have been included in the plans. Please include a graphical representation a typical pavement section for parking stalls and drive aisles, and another typical pavement section for emergency access vehicle and freight traffic.
Corrective Action Required
02/17/2017

Standard details for the sanitary sewer service did not appear to be included in the plan set. Please include the City standard detail, including the tracer wire and box detail.
Corrective Action Required
02/17/2017

Standard details for curb and gutter were not shown. Please provide a standard detail for CG-1 curb and gutter, and ensure the standard detail includes the aggregate base and flyash stabilized subgrade or geogrid a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
02/17/2017

The site plan does not appear to specifically call-out the locations where CG-1 curb and gutter will be installed.
Corrective Action Required
02/17/2017

Please provide standard detail for the backflow vault and backflow assembly.
Corrective Action Required
02/17/2017

It appears profile views for the stormwater system, including a graphical representation of the hydraulic grade line for the design storm, were missing from the plans. Please provide profile views and the hydraulic grade line for the design storm in the plans.
Corrective Action Required
02/17/2017

Sheet C06: It appears there are two sets of bold lines near the middle of Fascination Drive which do not appear to be part of the plans. Please remove them or describe what these features represent.
Corrective Action Required
02/17/2017

An erosion and sediment control plan appeared to be missing from the plan set.
Corrective Action Required
02/17/2017

Please be aware that comments on the public sanitary sewer plans shall be forthcoming. According to our schedule, review comments would be due by Feb. 28, 2017. However, based on the comments above, it is evident that the public sanitary sewer plans will be changed substantially, and the proposed alignment may even change to the point that review of these plans would not be beneficial. Please advise on how you wish to proceed with the review.
Corrective Action Required
02/17/2017

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total, plus a fee for the observation and collection of water samples. Items to include in the estimate are: 1) grading the site, 2) water lines greater than 2 inches in diameter, 3) water line valves, tees, elbows, and fittings, 4) valve boxes and valve covers, 5) gate valves, 6) thrust blocks and saddle blocks, 7) backflow vaults and backflow assembly, 8) fire hydrants, 9) storm lines greater than 6 inches in diameter, 10) storm structures including inlets and boxes, 11) private sanitary sewer lateral and wye connection to the main (please do not include the public sanitary sewer line at this time, this will be required separately as part of the public sanitary sewer plans), 12) grading and compaction of parking lot, including the area one (1) foot beyond the back of curb, 13) aggregate for parking lot, including the area one (1) foot beyond the back of curb, 14) flyash stabilized subgrade or geogrid, including the area one (1) foot beyond the back of curb, 15) pavement, 16) curb and gutter, 17) KCMMB commercial approaches, 18) sawcuts and removals for commercial approaches, 19) sidewalks, 20) ADA-accessible ramps, 21) erosion and sediment control devices and measures, 22) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
Planning Review Corrections 02/21/2017 02/17/2017
Jennifer Thompson
Corrective Action Required
02/21/2017

Provide a statement and reference the source indicating the location of all oil/and or gas wells within the subject property, if any.
Corrective Action Required
02/21/2017

Stamped, signed and sealed plans are required when resubmitting.
Corrective Action Required
02/21/2017

Provide a copy of any proposed public easement dedications, prior to execution of said documents.
Corrective Action Required
02/21/2017

A vacation of easement application (for those areas needing to be vacated), will need to be submitted, reviewed, approved, and recorded with the Jackson County Recorder of Deeds prior to the issuance of a building permit.
Corrective Action Required
02/21/2017

A vacation of right-of-way application (for those areas needing to be vacated), shall be submitted, reviewed, approved, and recorded with Jackson County Recorder of Deeds prior to the issuance of a building permit.
Corrective Action Required
02/21/2017

Please note on the site plan the location of the mechanical service enclosure.
Corrective Action Required
02/21/2017

A final plat shall be reviewed, approved, and recorded with the Jackson County Recorder of Deeds prior to the issuance of a building permit.
Corrective Action Required
02/21/2017

Provide a detail (to include the height), of any proposed retaining walls.
Corrective Action Required
02/21/2017

Provide the manufacturer specifications for all proposed, exterior lighting.
Corrective Action Required
02/21/2017

On Sheet L03, provide the painted gate color for the trash enclosure. In addition, provide more detail on the proposed CMU-Type 1 and 2 for the enclosure (i.e. color and description). Smooth CMU is not permitted for a trash enclosure.
Corrective Action Required
02/21/2017

On Sheet C05 the drive width for one of the lanes is too narrow. It's the drive lane on the eastern most entry into the site off SW Fascination as it maneuvers around an island. Please revise the width to meet the 24-foot minimum.
Corrective Action Required
02/21/2017

Provide a accessible signage detail. Each accessible parking space shall be identified by a sign, mounted on a pole or other structure, located between 36 inches (3 feet) and 60 inches (5 feet) above ground, measured from the bottom of the sign, at the head of the parking space. Please reference the R7-8 model.
Corrective Action Required
02/21/2017

Provide a CG-1 curbing detail.
Corrective Action Required
02/21/2017

Provide a detail of the special paving area.
Corrective Action Required
02/21/2017

Sign permits shall be obtained prior to installation of any signs through the Department of Development Services.
Corrective Action Required
02/21/2017

Provide paving details. The vehicle parking areas and drives should be the same detail. Please reference the Unified Development Ordinance, Article 12.120, Table 12-5.
Corrective Action Required
02/17/2017

An agreement shall be executed between the City and developer that addresses ownership, permitted uses, maintenance responsibilities and assignments of easements, right-of-ways and adjacent property pertaining to on-street parking, parking lanes along SW Longview Blvd., right-of-way encroachments, private tracts within right-of-way and potential right-of-way vacation.
Corrective Action Required
02/17/2017

The developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, the required public improvements listed in the TIA dated, November 2, 2016, sanitary sewer improvements, and waterline improvements. No building permit shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorders' Office. All public improvements shall be substantially complete prior to issuance of any building permit within the proposed preliminary development plan, except where the timing of improvements are specifically noted in the description of condition.
Corrective Action Required
02/22/2017

On Sheet C04, revise the area where wheel stops are shown and replace with temporary asphalt curbing. Other places within the site that temporary asphalt curing is needed and should be revised on the plans are along the proposed drive that connects the west side parking and the east side parking and the eastern drive lane that will eventually connect to the property to the south.
Corrective Action Required
02/22/2017

On Sheet C04, what type of curb does the hatched markings indicate?
Fire Review Corrections 02/21/2017 02/14/2017
Jim Eden
Code Statement
Corrective Action Required
02/14/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Imposed Loads
Resolved
03/27/2017

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: All fire lanes shall be able to support the weight of fire apparatus (75,000-pounds). The plans call for a portion of the lane to the south to be light asphalt.
Hydrants
Resolved
03/27/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: The rear of the building does not meet requirements with the hydrants shown.
FDC
Resolved
03/27/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC and a hydrant within 100 feet.
Fire Lanes - Marking
Corrective Action Required
02/14/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 02/06/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/06/2017 Receipt Receipt for transaction: 2017-000346
02/06/2017 Letter Routing Sheet - FDP
02/24/2017 Letter Applicant Letter - FDP (DFDP)
03/17/2017 Letter Resubmittal Routing Sheet - FDP
03/27/2017 Letter Applicant Letter - FDP (DFDP)
05/15/2017 Plans C401-CoverSheet
05/15/2017 Plans C402-General Notes
05/15/2017 Plans C403-General Layout
05/15/2017 Plans C404-GradingPlan
05/15/2017 Plans C405-SiteDisturbancePlan-Phase1
05/15/2017 Plans C406-SiteDisturbancePlan-Phase2
05/15/2017 Plans C407-SiteDisturbancePlan-Phase3
10/30/2017 Activity Document Fee WorksheetUpdatedDevCenterFDP
09/23/2019 New Longview - B&B Theatre
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home