Planning Application Status

PL2016174




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2016174
5TH & JEFFERSON PARKING LOT IMPROVEMENTS
Commercial Final Development Plan
Commercial Final Development Plan
Approved
09/20/2016
LAW OFFICE OF CAMRON HOORFAR PC
PARKING LOT
Locations
Contacts
LAW OFFICE OF CAMRON HOORFAR PC, Address:415 SW JEFFERSON ST  
LAW OFFICE OF CAMRON HOORFAR PC, Address:415 SW JEFFERSON ST  
HG CONSULT, INC, Address:9007 PINE ST, Phone:(816) 759-2285  
CL ARCHITECTURE (CRAIG LUEBBERT), Address:396 SW WINTERGARDEN, Phone:(816) 536-3472  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 10/28/2016 10/31/2016
Jim Eden
Code Statement
Corrective Action Required
10/21/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Planning Review No Comments 10/28/2016 10/21/2016
Hector Soto Jr.
Engineering Review Approved with Conditions 10/04/2016 10/19/2016
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
10/19/2016

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $1,115.52 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE C&O #12 Cut & Fill
Corrective Action Required
10/19/2016

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE Contact Field Eng. Inspector
Corrective Action Required
10/19/2016

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
10/19/2016

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
10/19/2016

Submit a Land Disturbance Permit application and the required attachments/fees to the City prior to any land disturbance activities on the site.
Fire Review Approved with Conditions 10/19/2016 10/18/2016
Jim Eden
Code Statement
Corrective Action Required
10/18/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Planning Review Corrections 10/04/2016 10/10/2016
Hector Soto Jr.
Corrective Action Required
10/10/2016

SITE INFORMATION TABLE. - Add both the existing building gross floor area and the building footprint area to the table. - Add the lot area to the table.
Corrective Action Required
10/10/2016

OPEN YARD LANDSCAPING. - Since this application is associated with a change in use of the site, the open yard landscaping requirements are applicable to this project. Show the open yard calculations add the necessary numbers of plant materials to the landscape schedule. By staff's rough calculations (lot area - building footprint area = # of required open yard trees; and (lot area - building building footprint area) x 2 = # of required open yard shrubs), two trees and three additional shrubs are required to meet the minimum open yard landscaping requirement. - Staff recommends adding some additional bushes along the north side of the parking lot so as to help minimize light spillage onto the adjacent property from vehicle headlights. This is a recommendation only.
Corrective Action Required
10/10/2016

ACCESSIBLE SIGN BASE DETAIL. Revise the detail on Sheet 5 to indicate that the 5' measurement from grade to the bottom of the sign is the maximum height. The detail mistakenly labels that height as a minimum.
Engineering Review Corrections 10/04/2016 10/04/2016
Gene Williams, P.E.
Corrective Action Required
10/04/2016

The City of Lee's Summit has adopted the Comprehensive Control Strategy for stormwater detention as defined in Section 5600 of the KCAPWA. For this particular site, the City may be willing to allow an exemption for detention to limit the peak flow, but the water quality aspect (i.e., 40 hour extended detention) cannot be waived and does not appear to have been addressed. Simply calling out "BMPs" along the roadway (i.e., a grassed parkway) in lieu of providing 40 hour extended detention is not an acceptable alternative. The City recommends 40 hour extended detention be provided for the 90% annual mean storm event, and it appears this will be easily-achievable. If not, then other volumetric control measures might be considered, but they cannot jeopardize the integrity of the roadway or other public infrastructure (e.g., construction of a rain garden or bioswale along the roadway with deficient slope will lead to pavement failure and should be avoided).
Corrective Action Required
10/04/2016

The stormwater report should specifically ask for a waiver to the peak flow attenuation requirements of Section 5600. Simply stating that "...the parking lot will be very small and the flows minimal" is not sufficient. Please discuss the total square footage of impervious area to be added, along with other reasons such as the fact that the site drains toward the roadway and away from other adjacent property owners.
Corrective Action Required
10/04/2016

The typical pavement section shown on Sheet 5 of 5 does not meet the Unified Development Ordinance (UDO) Article 12 in terms of stabilized subgrade or geogrid. 95% compacted subgrade will be required in all cases, so this cannot be substituted for the stabilized subgrade.
Corrective Action Required
10/04/2016

Does the sidewalk accross the alleyway meet ADA standards? If not, it should be replaced with an ADA-compliant sidewalk with the maximum cross slope of 2.00% (1.50% preferred).
Corrective Action Required
10/04/2016

Some method to collect stormwater from the parking lot will need to be constructed to divert stormwater to the new 40 hour extended detention basin. This may be achievable using a variety of methods, including flumes, etc.
Corrective Action Required
10/04/2016

The commercial entrance should be specified as "8 thickness rather than 6".
Corrective Action Required
10/04/2016

An Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings.
Traffic Review Corrections 10/04/2016 09/29/2016
Michael Park
Corrective Action Required
09/28/2016

Change the direction of one-way aisle to improve traffic flow and reduce adverse impacts to 5th Street associated with the new access/driveway.
Fire Review Approved with Conditions 10/04/2016 09/27/2016
Jim Eden
Code Statement
Corrective Action Required
09/27/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 09/20/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
09/20/2016 Receipt Receipt for transaction: 2016-006039
09/20/2016 Letter Routing Sheet - FDP
10/10/2016 Letter Applicant Letter - FDP (DFDP)
10/12/2016 Letter Resubmittal Routing Sheet - FDP
10/21/2016 Letter Applicant Letter - FDP (DFDP)
10/31/2017 Activity Document Fee WorksheetUpdatedDevCenterREVISED
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home