Planning Application Status

PL2015160




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015160
SUMMIT FAIR SHOPPING MALL BUILDING E - H & M
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/21/2015
RED LEES SUMMIT EAST LLC
New sheets turned in for south addition on 8/25/16
Locations
Contacts
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
YAEGER ARCHITECTURE, INC, Address:8655 PENROSE LANE STE 300, Phone:(913) 742-8000  
RED LEES SUMMIT EAST LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/01/2016 09/06/2016
Hector Soto Jr.
Engineering Review No Comments 09/01/2016 09/01/2016
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
08/26/2016

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $4,182.71 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
08/26/2016

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
08/26/2016

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
08/26/2016

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
08/26/2016

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
08/26/2016

If ground breaking is desired prior to obtaining a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist.
Fire Review Corrections 09/01/2016 08/30/2016
Jim Eden
Code Statement
Corrective Action Required
08/26/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Misc.
Corrective Action Required
08/30/2016

Where will the sprinkler room be located?
Traffic Review No Comments 09/01/2016 08/30/2016
Michael Park
Engineering Review Approved with Conditions 11/04/2015 02/29/2016
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
02/29/2016

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $4,182.71 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
02/29/2016

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
02/29/2016

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
02/29/2016

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
02/29/2016

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
02/29/2016

If ground breaking is desired prior to obtaining a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist.
Planning Review Approved with Conditions 12/17/2015 12/17/2015
Hector Soto Jr.
Corrective Action Required
12/17/2015

TRASH COMPACTOR SCREENING. Staff does not have the authority to approve the proposed temporary wood fence screening. The use of wood can only be approved by the City Council as part of a public hearing process, which requires submittal of a separate application and fee. However, staff does have the authority to administratively approve (i.e. no City Council approval required) any of the following types of temporary screening materials: vinyl fence, masonry wall, metal panel screen or fiber-cement panel screening. Please submit 3 copies of Sheet A303 only that reflect the revision of the screening material to one of the options that staff can administratively approve.
Engineering Review Corrections 12/17/2015 12/17/2015
Gene Williams, P.E.
Corrective Action Required
12/17/2015

Cost estimate needs revision as per email dated Dec. 17, 2015
Corrective Action Required
12/17/2015

Awaiting permission from engineer to redline plans as per email dated Dec. 17th, 2015
Traffic Review No Comments 12/17/2015 12/16/2015
Michael Park
Fire Review Approved with Conditions 12/17/2015 12/15/2015
Jim Eden
Code Statement
Corrective Action Required
12/15/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Engineering Review Corrections 11/04/2015 11/04/2015
Gene Williams, P.E.
Corrective Action Required
11/04/2015

Sheet C401: It is not clear where the sanitary and water service is being connected. Were the locations of the water and sanitary sewer field-verified? Our GIS records do not show the water or sanitary sewer service at this location.
Corrective Action Required
11/04/2015

An automatic meter reading meter must be installed since the water line is private. Please show this on the plans after verifying the location.
Corrective Action Required
11/04/2015

Why is ductile iron pipe being used for the fire line? The City would accept C900. Ductile iron pipe must be wrapped with poly, including all fittings.
Corrective Action Required
11/04/2015

Please label the private streets, such as SW Midway Crossing in order to establish a reference.
Corrective Action Required
11/04/2015

An erosion and sediment control plan appeared to be missing from the plans.
Corrective Action Required
11/04/2015

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total. Items to include in the estimate are: 1) water lines greater than 2" diameter, 2) water line fittings, tees, bends, thrust blocks, and valves and valve boxes, 3) sanitary sewer wye connection at the main, 3) storm pipes greater than 6" diameter, 4) storm inlets and storm drainage structures, 5) grading to establish proper drainage, 6) subgrade preparation, 7) aggregate sub-base for parking, 8) pavement, 9) curb and gutter, 10) erosion and sediment control measures and devices, and 11) final restoration, including seeding, sodding, fertilizer, mulch, and topsoil.
Planning Review Corrections 11/04/2015 11/03/2015
Hector Soto Jr.
Corrective Action Required
11/03/2015

KEYNOTES. - The keynote on Civil Sheet C101 identifying the driveway for the trash compactor area is incorrect. It is labeled as the number 1 (proposed sidewalk), but should be the number 7 (proposed driveway entrance). - The keynotes on Architectural Sheet A301 for the trash compactor enclosure are incorrect. The gate note should be called out as 5.7C, not 4.7C. The pattern on the gate should be called out as 5.7D, not 4.7C.
Corrective Action Required
11/03/2015

TRASH COMPACTOR SCREENING. The trash compactor area on the south side of the building is shown to be screened from view along the east and south sides. The west side is left open. Staff understands that a future building expansion on the south side of the building will eventually provide screening along the west side. However, screening is required to be provided along the west side of the trash compactor area in the interim until such time as the building expansion is constructed. Staff will consider any temporary methods to achieve the necessary screening until the building expansion provides the intended permanent screening.
Traffic Review No Comments 11/04/2015 10/29/2015
Michael Park
Fire Review Corrections 11/04/2015 10/28/2015
Jim Eden
FDC
Corrective Action Required
10/28/2015

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Shown the location of the fire department connection (FDC) on the building and a fire hydrant within 100 feet.
Knox Locks
Corrective Action Required
10/28/2015

IFC 506.1 -Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official.506.1.1 Locks.An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: A Knox box is required over the FDC. A box may be ordered online at Knoxbox.com.
Hydrants
Corrective Action Required
10/28/2015

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Show the location of new or existing fire hydrants.
Code Statement
Corrective Action Required
10/28/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Misc.
Resolved
12/15/2015

The correct address for the building is 820 NW Blue Parkway.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 10/21/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
10/21/2015 Receipt Receipt for transaction: 2015-005861
10/21/2015 Letter Routing Sheet - FDP
11/04/2015 Letter Applicant Letter - FDP (DFDP)
12/10/2015 Letter Resubmittal Routing Sheet - FDP
12/17/2015 Letter Applicant Letter - FDP (DFDP)
04/29/2016 Letter Applicant Letter - FDP (DFDP)
08/25/2016 Letter Resubmittal Routing Sheet - FDP
09/06/2016 Letter Applicant Letter - FDP (DFDP)
11/10/2017 Activity Document Fee WorksheetUpdated
09/05/2019 Building E Summit Fair
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home