PL2015115
LEE'S SUMMIT MEDICAL CENTER OPERATING ROOM ADDITION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/31/2015
MIDWEST DIVISION LSH LLC
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/14/2015 09/09/2015
Jennifer Thompson
Fire Review Approved with Conditions 09/14/2015 09/09/2015
Jennifer Thompson
Code Statement
Corrective Action Required
09/04/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Obstructions
Corrective Action Required
09/04/2015

2012 IFC 503.4 -Fire apparatus access roads shall not be obstructed in any manner, including the parking of vehicles. The minimum widths and clearances established in Section 503.2.1 shall be maintained at all times. Access to the fire department connection (FDC) to the west of the project shall be maintained at all times.
Misc.
Corrective Action Required
09/04/2015

2012 IFC 3311.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Engineering Review Approved with Conditions 09/14/2015 09/09/2015
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
09/09/2015

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $2,472.71 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
09/09/2015

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
09/09/2015

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
09/09/2015

If ground-breaking is desired prior to the issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist. Contact Barton Reese at (816) 969-1800 for land disturbance permitting details.
Traffic Review No Comments 09/14/2015 09/09/2015
Michael Park
Fire Review Approved with Conditions 09/09/2015 09/03/2015
Jim Eden
Code Statement
Corrective Action Required
09/01/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Obstructions
Corrective Action Required
09/01/2015

2012 IFC 503.4 -Fire apparatus access roads shall not be obstructed in any manner, including the parking of vehicles. The minimum widths and clearances established in Section 503.2.1 shall be maintained at all times. Access to the fire department connection (FDC) to the west of the project shall be maintained at all times.
Misc.
Corrective Action Required
09/01/2015

2012 IFC 3311.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Planning Review Corrections 09/09/2015 09/03/2015
Jennifer Thompson
Corrective Action Required
09/03/2015

The pavement section shown for the asphalt still does not meet the Unified Development Ordinance (UDO) Article 12 in terms of pavement thickness. Parking stalls and drive aisles are required to have a minimum 2" surface course over a 5" base course of asphaltic concrete. Fire lanes are required to have the same, except the base course is 6" minimum.
Corrective Action Required
09/03/2015

When resubmitting revised plans, please proved 6-full sets and one 1/2 size full set of plans.
Engineering Review Corrections 09/09/2015 09/02/2015
Gene Williams, P.E.
Corrective Action Required
09/02/2015

The pavement section shown for the asphalt still does not meet the Unified Development Ordinance (UDO) Article 12 in terms of pavement thickness. Parking stalls and drive aisles are required to have a minimum 2" surface course over a 5" base course of asphaltic concrete. Fire lanes are required to have the same, except the base course is 6" minimum.
Corrective Action Required
09/02/2015

An erosion and sediment control plan was shown, but hay bales are not allowed in the City of Lee's Summit. Alternatives include gutter buddies, rock checks, mulch berms, and other measures described in the Design and Construction Manual.
Corrective Action Required
09/02/2015

The estimate provided did not appear to include sufficient breakdown of costs necessary to prepare a fee schedule for the work. In particular, curb and gutter were missing, and new pavement work appears to be based on thin asphaltic concrete sections that are not in conformance with the UDO Article 12. Aggregate base also appeared to be missing, including the area one (1) foot beyond the back of curb. Finally, erosion and sediment control devices were missing, along with final restoration including sodding, seeding, fertilizer, mulch, and topsoil. The estimate does not need to include items such as landscaping, bushes, trees, shrubbery, lighting, the building, retaining wall, or other items associated with the building itself.
Traffic Review No Comments 09/09/2015 09/01/2015
Michael Park
Engineering Review Corrections 08/14/2015 08/13/2015
Gene Williams, P.E.
Corrective Action Required
08/13/2015

Pavement detail for PCC pavement and asphaltic paving does not meet the specifications contained in the Unified Development Ordinance (UDO) Article 12.
Corrective Action Required
08/13/2015

Please call-out new concrete curb and gutter (CG-1) on the plan view.
Corrective Action Required
08/13/2015

Have there been sufficient spot elevations taken to assess the drainage for the new improvements? It is difficult to determine whether the parking lot will drain properly based on Sheet A1-1.
Corrective Action Required
08/13/2015

Are there any other improvements, such as fire line upgrades, sanitary sewer upgrades, or other improvements?
Corrective Action Required
08/13/2015

A retaining wall is shown in section, but it is not clear where this will be installed. Please note that the retaining wall cannot be installed within an easement or right of way, including the footing. A separate building permit will also be required for any retaining wall.
Corrective Action Required
08/13/2015

An erosion and sediment control plan was missing. Please show a simple erosion and sediment control plan for the site.
Corrective Action Required
08/13/2015

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
08/13/2015

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculcated at 3% of the total. Items to include in the estimate are: 1) grading to establish proper drainage, 2) removals and demolition of existing pavement and base, 3) subgrade preparation, 4) aggregate, including the area one (1) foot beyond the back of curb, 5) subgrade preparation, including the area one (1) foot beyond the back of curb, 6) paving, 7) erosion and sediment control devices, 8) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil, and 9) any other site work not covered by the submittal drawings dated May 29, 2015.
Planning Review Corrections 08/14/2015 08/12/2015
Jennifer Thompson
Corrective Action Required
08/11/2015

Are new roof-top units or ground mounted units proposed with this addition? If new units are proposed, please provide information on the method of screening. Screening requirements can be found in the Unified Development Ordinance (UDO), Section 7.180.
Corrective Action Required
08/11/2015

On Sheet A1-1, the 1'=20' scale is not scaling properly within the site demo plan and site plan section. Please revise.
Corrective Action Required
08/11/2015

On Sheet A1-1, please label the drive aisle width where the island bump-out is located. The minimum requirement is 24' (foot).
Corrective Action Required
08/12/2015

The Unified Development Ordinance (UDO) Article 12 has specific requirements concerning pavement thickness, and subgrade. If a geotechnical report is used to justify a different design than shown in the UDO, then the report should specify that the proposed design is equal to or exceeds the standard design provided in the UDO. Revise the pavement detail to meet the Unified Development Standards (UDO). These standards can be found in the UDO, Article 12.F.1.
Corrective Action Required
08/13/2015

It was noted existing landscaping will be re-located. Provide additional information regarding the type, number, and species that is to be moved and indicate the new location.
Corrective Action Required
08/13/2015

On Sheet A5-1, label the proposed color of the proposed EIFS and Face Brick. It's noted it will match existing, please provide what color that is.
Corrective Action Required
08/13/2015

Is new lighting proposed (wall or parking lot lighting)? If so, provide the location of the lighting and the manufacturer specifications. Lighting standards can be found in the UDO, Article 7. If new lighting is proposed, please also provide a photometric diagram showing predicted maintained lighting levels produced by the proposed lighting fixtures.
Corrective Action Required
08/13/2015

On Sheet A1-1, the Hospital Addition label is misspelled.
Traffic Review No Comments 08/14/2015 08/10/2015
Michael Park
Fire Review Approved with Conditions 08/14/2015 08/04/2015
Jim Eden
Code Statement
Corrective Action Required
08/04/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Obstructions
Corrective Action Required
08/04/2015

2012 IFC 503.4 -Fire apparatus access roads shall not be obstructed in any manner, including the parking of vehicles. The minimum widths and clearances established in Section 503.2.1 shall be maintained at all times. Access to the fire department connection (FDC) to the west of the project shall be maintained at all times.
Misc.
Corrective Action Required
08/04/2015

2012 IFC 3311.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/31/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/31/2015 Receipt Receipt for transaction: 2015-004478
07/31/2015 Letter Routing Sheet - FDP
09/01/2015 Letter Resubmittal Routing Sheet - FDP
09/04/2015 Letter Resubmittal Routing Sheet - FDP
09/09/2015 Fee Worksheet
01/14/2017 Letter Applicant Letter - FDP (DFDP)
01/14/2017 Letter Applicant Letter - FDP (DFDP)
01/14/2017 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home