Planning Application Status

PL2015070




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015070
EAA CHAPTER 91 HANGAR
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/08/2015
CITY OF LEES SUMMIT
NEW HANGAR
Locations
Contacts
M.A.C. CORPORATION OF KANSAS, Address:900 NW HUNTER DR, STE 2 SOUTH, Phone:(816) 229-6090  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
SDC ENGINEERING, Address:5907 RAYTOWN TFWY, Phone:(816) 356-1445  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 06/22/2015 06/17/2015
Jim Eden
Code Statement
Corrective Action Required
06/15/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Engineering Review No Comments 06/22/2015 06/17/2015
Gene Williams, P.E.
Planning Review No Comments 06/22/2015 06/15/2015
Hector Soto Jr.
Fire Review Approved with Conditions 06/02/2015
Jim Eden
Code Statement
Corrective Action Required
05/27/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Traffic Review No Comments 05/27/2015 05/29/2015
Michael Park
Planning Review Corrections 05/27/2015 05/27/2015
Hector Soto Jr.
Corrective Action Required
05/27/2015

LIGHTING. Provide manufacturer specifications for the proposed exterior wall packs for review and approval. Fixtures shall have full 90-degree cut-offs so as to direct the light downward.
Fire Review Approved with Conditions 05/22/2015 05/27/2015
Jim Eden
Code Statement
Corrective Action Required
05/27/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Engineering Review Corrections 05/27/2015 05/27/2015
Gene Williams, P.E.
Corrective Action Required
05/27/2015

An FAA form 7460 should be provided prior to construction.
Corrective Action Required
05/27/2015

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total. Items to include in the estimate are: 1) grading, 2) concrete apron, 3) final restoration, including sodding, seeding, fertilizer, mulch, and topsoil.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 05/11/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
05/11/2015 Receipt Receipt for transaction: 2015-000994
05/12/2015 Letter Routing Sheet - FDP
05/27/2015 Letter Applicant Letter - FDP (DFDP)
06/12/2015 Fee Worksheet
06/17/2015 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home