Planning Application Status

PL2015040




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015040
HANGER R
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/31/2015
CITY OF LEES SUMMIT
NEW HANGER AT LEE'S SUMMIT AIRPORT
Locations
Contacts
THOMPSON BUILDERS LLC, Address:4559 GROVE ST, Phone:(913) 915-2836  
STAND STRUCTURAL ENGINEERING, Address:12417 CONNELL DR, Phone:(913) 424-9115  
SIGNATURE BUILDERS, Address:1516 SW HOOK RD , Phone:(816) 215-0891  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 04/29/2015 04/24/2015
Hector Soto Jr.
Engineering Review Approved with Conditions 04/29/2015 04/24/2015
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
04/24/2015

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $1,169.60 (which is based on 3% of the total infrastructure cost plus two (2) water test inspection fees) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
04/24/2015

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
04/24/2015

If ground breaking is desired prior to issuance of a building permit from the Planning and Codes Administration Department, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist. Contact Barton Reese at (816) 969-1800 if this is desired.
DE C&O #12 Cut & Fill
Corrective Action Required
04/24/2015

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Traffic Review No Comments 04/29/2015 04/23/2015
Michael Park
Fire Review Approved with Conditions 04/29/2015 04/22/2015
Jim Eden
Code Statement
Corrective Action Required
04/22/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. This building is classified as a Group III hangar per IFC Section 914.8.2 and NFPA 409. Separation of the office space and storage area shall be in accordance with the International Building Code.
Planning Review Corrections 04/14/2015 04/14/2015
Hector Soto Jr.
Corrective Action Required
04/14/2015

DRAWING TITLE. Change the drawing title from plot plan to final development plan.
Corrective Action Required
04/15/2015

DRAWING ORIENTATION. - Add a north arrow to the drawing. - Provide a vicincity map on the drawing to illustrate the hangar location relative to the airport site.
Corrective Action Required
04/15/2015

ACCESSIBLE PARKING SPACE. A striped 8'-wide accessible aisle shall be provided adjacent to the accessible parking space.
Corrective Action Required
04/15/2015

PARKING SPACES. Label the typical parking space dimensions. Parking spaces shall be a minimum 9' wide x 19' deep.
Corrective Action Required
04/15/2015

PARKING LOT BOUNDARY. Please clarify the pavement boundaries for the new parking lot. It appears as though pavement may extend outside of the lease area to surround the propane tank serving the hangar to the south.
Corrective Action Required
04/15/2015

TAXIWAY. Label the existing taxiway and its width.
Corrective Action Required
04/15/2015

BUILDING ELEVATIONS. - Label the proposed hangar exterior wall and roof colors. - Show all roof penetrations to the extend possible on the elevations. Small pipes shall be painted to blend their appearance into the roof.
Corrective Action Required
04/15/2015

LIGHTING. Show all proposed wall-mounted light fixtures on the building elevations. Wall-mounted light fixtures shall comply with the requirements of Section 7.260 and Section 7.270 of the Unified Development Ordinance (UDO). Manufacturer specifications for all proposed exterior light fixtures shall be submitted for review and approval.
Engineering Review Corrections 04/14/2015 04/14/2015
Gene Williams, P.E.
Corrective Action Required
04/14/2015

Please rename the "Plot Plan" as the "Final Development Plan."
Corrective Action Required
04/14/2015

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
04/14/2015

Please show a north arrow.
Corrective Action Required
04/14/2015

Please show the location and size of the existing water line. Please provide a note stating that a cut-in tee is required.
Corrective Action Required
04/14/2015

Please show how the new fire hydrant will be connected. It will be acceptable to call out a note stating "new fire hydrant assembly/valves/thrust blocks as per City of Lee's Summit standards."
Corrective Action Required
04/14/2015

Please show the location of the water meter.
Corrective Action Required
04/14/2015

The sanitary sewer is shown, but it is unclear where this will be connected.
Corrective Action Required
04/14/2015

The Final Development Plan should be sealed by a registered professional engineer licensed in the State of Missouri.
Corrective Action Required
04/14/2015

An erosion and sediment control plan was not provided.
Corrective Action Required
04/14/2015

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and is calculated at 3% of the total, plus a $100 per trip fee for the observation of water sample collection. Items to include in the estimate include: 1) water lines greater than 2" diameter, 2) fire hydrants, 3) valves and valve boxes and covers, 4) thrust blocks, 5) tees, bends, and other water line fittings, 6) subgrade preparation, including the area one (1) foot behind the back of curb, 7) pavement, 8) curb and gutter, 9) erosion and sediment control devices, and 10) final restoration including sodding, seeding, fertilizer, and mulch.
Traffic Review No Comments 04/14/2015 04/03/2015
Michael Park
Fire Review Approved with Conditions 04/14/2015 04/02/2015
Jim Eden
Code Statement
Corrective Action Required
04/02/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. This building is classified as a Group III hangar per IFC Section 914.8.2 and NFPA 409. Separation of the office space and storage area shall be in accordance with the International Building Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 03/31/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/31/2015 Receipt Receipt for transaction: 2015-000505
03/31/2015 Letter Routing Sheet - FDP
04/15/2015 Letter Applicant Letter - FDP (DFDP)
04/22/2015 Letter Resubmittal Routing Sheet - FDP
04/24/2015 Fee WorksheetHangarRFDP
04/24/2015 Letter Applicant Letter - FDP (DFDP)
09/13/2019 Hangar R
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.