Planning Application Status

PL2014150




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2014150
JOHN KNOX VILLAGE - COURTYARDS - INDEPENDENT LIVING BUILDING
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/04/2014
JOHN KNOX VILLAGE
Locations
Contacts
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
WESTWOOD ENGINEERING, Address:5605 NORTH MACARTHUR BLVD, SUITE 500, Phone:(972) 793-0300  
SFCS INC., Address:305 south jefferson street, Phone:(540) 344-6664  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 12/09/2014 12/15/2014
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
12/09/2014

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $2,121.53 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
12/15/2014

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
12/15/2014

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
12/15/2014

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
12/15/2014

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
12/15/2014

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Administration Department.
Fire Review Approved with Conditions 12/09/2014 12/09/2014
Jim Eden
Code Statement
Corrective Action Required
12/09/2014

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Planning Review Approved with Conditions 12/09/2014 12/09/2014
Ron Seyl
Corrective Action Required
12/09/2014

Sets of the plans submitted were missing several pages. Specifically, pages 6,9,11,14,15,17,18,19,20,21,22 and 23 were missing. We can discuss in more detail at tomorrow's project meeting.
Corrective Action Required
12/09/2014

All platting/re-platting of the properties shall be required prior to final occupancy.
Traffic Review No Comments 12/09/2014 12/03/2014
Michael Park
Planning Review Corrections 11/19/2014 11/21/2014
Jennifer Thompson
Corrective Action Required
11/19/2014

Provide a landuse table on the site plan (Sheet 3) that includes the following: total floor area of proposed building; number of dwelling units; land area in square feet and acres for Lots F and G; number of required and proposed parking spaces; impervious coverage and floor area ratio.
Corrective Action Required
11/19/2014

Provide sufficient dimensions to indicate relationship between buildings and property lines.
Corrective Action Required
11/19/2014

Provide location, size, color and type of material to be used in all screening of mechanical equipment. A. Per Uniform Development Ordiinance Section 7.180.E – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. B. Per Uniform Development Ordiinance Section 7.180.F – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Corrective Action Required
11/19/2014

Provide lightpole detail including base height and over-all pole height. Per Unified Development Ordinance Article 7.280.D.2 - All light fixtures on properties within or adjoining residential uses and/or districts shall not exceed 15 feet.
Corrective Action Required
11/19/2014

What is the wattage of the pole lights? I do not see it in the manufacturers specification sheet. Per Unified Development Ordinance Article 7.280.G.1 - All fixtures on developments that adjoin residential uses and/or districts shall be limited to 175-Watts maximum per head through the entire parking lot.
Corrective Action Required
11/19/2014

Provide location, size, and type of material to be used in all screening of ground or roof mounted mechanical equipment. A. Rooftop Units - Per Uniform Development Ordinance Section 7.180.E – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. B. Ground mounted units - Per Uniform Development Ordinance Section 7.180.E - Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Corrective Action Required
11/19/2014

On the manufacturer’s specification sheets for both the pole and wall mounted fixtures, it is not clear whether light fixtures will be a full-cut off fixtures. The wall mounted fixture looks to be angled. The UDO requires a flat lense/full-cut-off fixtures for both pole and wall mounted fixtures. Additionally, the pole mounted fixture must be mounted to the pole at a 90-degree angle. This is a UDO requirement.
Corrective Action Required
11/19/2014

Is a trash enclosure proposed for this site? If so, please indicate the location and provide a detail of the enclosure. All exterior trash storage containers shall be screened so that they are not visible from off the property. Each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve.
Corrective Action Required
11/19/2014

Please include a dashed line indicating the roof line and rooftop mechanical equipment if this is the type of mechanical unit to be used.
Corrective Action Required
11/19/2014

Provide a color palet displaying proposed colors of the building on Sheet A4.
Corrective Action Required
11/19/2014

Provide manufacturer’s specification sheets for proposed mechanical equipment to be used.
Corrective Action Required
11/19/2014

Provide note on Sheet 5 specifying that CG-1 concrete curbing will be used. Per Unified Development Ordinance Section 12.120.F.d - All vehicle parking lot areas and access drives in all zoning districts shall have a boundary constructed of straight-back Portland cement concrete curbing (CG-1) or an integral Portland cement concrete sidewalk and curb with a vertical face.
Corrective Action Required
11/19/2014

The pavement section on Sheet 5 does not meet Unified Development Ordinance requirements. Per Unified Development Ordinance Section 12.120 - Parking Lot Design, All vehicle parking and loading areas and all access drives shall be improved with one of the following: (i) a minimum 5-inch asphaltic concrete base overlaid with a 2-inch asphaltic concrete surface constructed on a sub-grade of either 12-inch prepared soil, 8-inch aggregate or 9-inch fly ash treated soil; (ii) a minimum 6 inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of either 12-inch prepared soil, 8-inch aggregate or 9-inch fly ash treated soil.
Corrective Action Required
11/21/2014

As previously discussed, all platting/re-platting of the properties shall be required prior to final occupancy.
Corrective Action Required
11/21/2014

For informational purposes, a full building permit shall not be issued until the Vacation of Easement application is approved by City Council and executed.
Corrective Action Required
11/21/2014

Please provide a accessible sign detail and make a note in the accessible sign detail, the accessible sign shall follow the R7-8 model type. Add 36"-60" mounting height above grade, measured to the bottom of the sign.
Corrective Action Required
11/21/2014

On Sheet 5, why is one of the parking stalls labeled as no curb?
Corrective Action Required
11/21/2014

A portion of the plans are not sealed by a professional engineer. Please provide this on the next set of plans.
Corrective Action Required
11/21/2014

Proposed signs shall be submitted to the Planning and Codes Administration for review and approval by separate application.
Corrective Action Required
11/21/2014

The Unified Development Ordinance (UDO) requires parking lot screening for parking stalls visible from the right-of-way. Please label the plans and provide additional shrubs along the new portion of parking (the north parking lot adjacent Murray Street). The shrubs need to be located within the islands on the east portion of the parking lot.
Engineering Review Corrections 11/19/2014 11/19/2014
Gene Williams, P.E.
Corrective Action Required
11/19/2014

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
11/19/2014

Please note that the pavement section table on Sheet 5 of 23 does not follow our Unified Development Ordinance (UDO) in terms of asphalt base course for parking stalls. The minimum thickness for the base course is five (5) inches for parking stalls.
Corrective Action Required
11/19/2014

Sheet 8 of 23: Please label the stormwater improvements as private either on the plan view or within the title block.
Corrective Action Required
11/19/2014

Sheet 10 of 23: Please change the note from "to be abandoned" to "to be vacated".
Corrective Action Required
11/19/2014

Since the water line is going to become private, backflow vaults and assemblies will need to be installed at each end of the private line. The vaults will need to be installed on private property outside of any easements, and a gate valve installed just prior to the vault.
Corrective Action Required
11/19/2014

Please label all interior water lines and sanitary sewer lines as private on the water line plans.
Corrective Action Required
11/19/2014

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and is calculated at 3% of the total sitework, plus a per-trip fee of $100 for the collection of water samples. Public and private items to include in the estimate include: 1) storm pipe greater than 6 inches diameter, 2) storm structures, 3) sanitary sewer lines, 4) sanitary sewer manholes and wye connections, 5) water lines greater than 2" diameter, 6) water line fittings, thrust blocks, tees, bends, valves, valve boxes, valve box lids, 7) backflow vault and backflow assemblies, 8) grading to establish proper drainage for the site, 9) grading for new parking lot, 10) subgrade construction including one (1) foot beyond the back of curb, 11) pavement, 12) curb and gutter, 13) public sidewalk, 14) erosion and sediment control devices, 15) final restoration including sodding, seeding, fertilizer, and topsoil.
Traffic Review No Comments 11/19/2014 11/13/2014
Michael Park
Fire Review Corrections 11/19/2014 11/11/2014
Jim Eden
Code Statement
Carried Forward
12/09/2014

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code and local amendments. For information only.
FDC
Resolved
12/09/2014

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Provide a fire hydrant at the southeast corner of the IL Building to meet this requirement.
Knox Locks
Resolved
12/09/2014

IFC 506.1 -Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official.506.1.1 Locks.An approved lock shall be installed on gates or similar barriers when required by the fire code official. An application may be obtained from the fire department, or online at Knoxbox.com.
Imposed Loads
Resolved
12/09/2014

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Water Supply
Corrective Action Required
11/11/2014

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Modifications to available hydrants shall still provide the required fire flow (minimum of 1,500 gpm at 20 psi) per IFC Table B105.1.
Misc.
Resolved
12/09/2014

The canopy of the Commons building that is part of the fire lane access to the IL Building shall be a height of 13'6" or greater. The height must allow the passage of a 44' aerial under the canopy and up the grade to the north.
Fire Lanes - Marking
Resolved
12/09/2014

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. The lane along the northwest side of the building shall be marked.
Misc.
Resolved
12/09/2014

Class 1 standpipe / hose connections will be required. For information only.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 11/04/2014
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
11/04/2014 Receipt Receipt for transaction: 2014-002136
11/05/2014 Letter Routing Sheet - FDP
11/21/2014 Letter Applicant Letter - FDP (DFDP)
12/02/2014 Letter Resubmittal Routing Sheet - FDP
12/10/2014 Letter Applicant Letter - FDP (DFDP)
12/15/2014 Activity Document Fee WorksheetFDP150
12/16/2014 Letter Applicant Letter - FDP (DFDP)
12/16/2014 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home