Summary
PL2014130
John Knox Village Fire Line at 400 NW Murray Rd
Engineering Plan Review
Engineering Plan Review
Approved
10/01/2014
JOHN KNOX VILLAGE
Locations
Contacts
Not shown for privacy reasons.
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 10/15/2014 10/14/2014
Gene Williams, P.E.
Corrective Action Required
10/14/2014

The plan shows the water line along the middle of NW Murray Rd. Is this correct? Were as-built Record Drawings obtaiined and calls to Missouri One-Call made?
Corrective Action Required
10/14/2014

What is the restoration plan for Murray Road? This will need to be specifically shown on the plans, including paving, subgrade, and curb and gutter replacement.
Corrective Action Required
10/14/2014

A traffic control plan will need to be submitted within the engineering plan package. It will be acceptable to use our City of Lee's Summit standard "Traffic Control Details" available on our website at www.cityofls.net; however, they should be included as part of the engineering plan package.
Corrective Action Required
10/14/2014

A restoration plan for the parking lot was not shown on the plans. The plans need to show the specific actions which will take place to restore the pavement, including pavement thickness, base, and curb and gutter replacment.
Corrective Action Required
10/14/2014

A restoration plan for the parkway between the parking lot and Murray Road was not shown. It will be acceptable to simply provide a note stating that the parkway will be restored with sod.
Corrective Action Required
10/14/2014

A water valve (i.e., gate valve) will be needed on the public water main on the north side of the new cut-in tee.
Corrective Action Required
10/14/2014

A cut-in tee rather than a tapping sleeve should be specified on the plans.
Corrective Action Required
10/14/2014

The Engineer's Estimate of Probable Construction Costs appeared to be missing the following items: 1) street repair, 2) curb replacement, 3) subgrade preparation of the street, 4) traffic control, and 5) parkway restoration.
Engineering Review Corrections 10/22/2014 10/01/2014
Gene Williams, P.E.
Corrective Action Required
10/01/2014

Please add a note to the plans stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail."
Corrective Action Required
10/01/2014

It is difficult to determine where the proposed fire line is located. Where is the north arrow? Where are the side streets in relation to the new fire line? Where is the parking lot in relation to the new fire line?
Corrective Action Required
10/01/2014

What is the size of the public water main? What is the type (i.e., PVC, ductile iron, etc.)? Please note on the plans.
Corrective Action Required
10/01/2014

Where is the right of way and/or easements in relation to the new fire line? It will be necessary to locate the new backflow vault outside the limits of the right of way or public easement.
Corrective Action Required
10/01/2014

Please specify that a cut-in tee be provided at the connection to the public water main.
Corrective Action Required
10/01/2014

Please show a gate valve on the plan view just prior to the backflow vault. This denotes the end of the public line.
Corrective Action Required
10/01/2014

If the parking lot is disturbed, what is the restoration plan? Please see the Unified Development Ordinance Article 12 for acceptable pavement thickness and base requirements if the pavement will be disturbed during construction of the fire line.
Corrective Action Required
10/01/2014

What is the restoration plan for the landscaping? Will the area be sodded?
Corrective Action Required
10/01/2014

Please confirm that the fire flows shown and other applicable design standards within the interior of the building are acceptable to the City of Lee's Summit Fire Department.
Corrective Action Required
10/01/2014

Please show a general grading plan around the new backflow vault.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
10/01/2014 Letter PW-Comment Letter (Engineering Plans)
10/14/2014 Letter PW-Comment Letter (Engineering Plans)
11/17/2014 Fee WorksheetFDP
11/19/2014 Letter PW-Engineering Approval Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home