Planning Application Status

PL2014092




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2014092
Lumber Warehouse Fire Line Plans
Engineering Plan Review
Engineering Plan Review
Approved
07/01/2014
NEWTON MARILYN S-TRUSTEE
Locations
Contacts
Not shown for privacy reasons.
NEWTON MARILYN S-TRUSTEE, Address:2013 NW N ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 07/23/2014 07/01/2014
Gene Williams, P.E.
Corrective Action Required
07/01/2014

Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813."
Corrective Action Required
07/01/2014

Please make the outline of the existing driveway darker to provide a point of reference.
Corrective Action Required
07/01/2014

Please show Olive Street to the east as a point of reference.
Corrective Action Required
07/01/2014

Please show the existing easement for the water line running east/west from Olive along the driveway.
Corrective Action Required
07/01/2014

Please show the correct location of the water line in relation to the access drive. It does not appear to be correct (i.e., it is shown on the north side, but it appears from the record drawings, GIS, and site visit to be on the south side of the access drive).
Corrective Action Required
07/01/2014

Please note that the backflow vault cannot be within the limits of any easement.
Corrective Action Required
07/01/2014

A new gate valve must be installed prior to the backflow vault (i.e., the old valve should not be re-used). This valve should be within an easement.
Corrective Action Required
07/01/2014

Will any portions of the existing fire line besides the portion within the area of the new backflow vault be removed and replaced? If not, then please specify on the plans that the existing line will remain in-place.
Corrective Action Required
07/01/2014

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate and is calculated at 3% of the total plus a $100 per trip fee to observe and collect water samples. Items to include in the itemized estimate include: 1) backflow vault, 2) pipe, 3) fittings, 4) thrust blocks, 5) valves, 6) final restoration.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
07/01/2014 Letter PW-Comment Letter (Engineering Plans)
07/03/2014 Fee Worksheet3.xlsx
11/14/2017 Activity Document ScannedPlansBackflowVaultandAdjustmenttoGradeFireHydrants
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: