Planning Application Status

PL2014049




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2014049
GREEN LANTERN CAR WASH
Commercial Final Development Plan
Commercial Final Development Plan
Approved
04/24/2014
CROSS PROPERTIES LLC
Locations
Contacts
BLUE BEACON INTERNATIONAL, INC., Address:500 GRAVES BLVD, Phone:(785) 825-2221  
OLSSON ASSOCIATES, Address:1251 NW BRIARCLIFF PKWY, STE. 50, Phone:(816) 361-1177  
GASTINGER WALKER HARDEN ARCHITECTS, Address:817 WYANDOTTE  
CROSS PROPERTIES LLC, Address:1101 NW BLUE PKWY  
CWW ENTERPRISES LLC, Address:500 GRAVES BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 06/03/2014 07/18/2014
Jennifer Thompson
Engineering Review Approved with Conditions 06/03/2014 07/01/2014
Gene Williams, P.E.
Traffic Review No Comments 06/03/2014 06/03/2014
Michael Park
Fire Review Approved with Conditions 06/03/2014 05/27/2014
Jim Eden
Code Statement
Corrective Action Required
05/27/2014

Fire Department- All building and life safety issues shall comply with the 2012nternational Fire Code and local amendments as adopted by the City of Lee’s Summit.
Engineering Review Corrections 05/09/2014 05/09/2014
Gene Williams, P.E.
Corrective Action Required
05/09/2014

Please change note 5 under General Notes to read "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813".
Corrective Action Required
05/09/2014

Has the applicant verified that a cross-access easement exists to provide the needed access to the site?
Corrective Action Required
05/09/2014

The storm drainage plan will need concurrence from MoDOT. Please contact Steve Holloway at Stephen.Holloway@modot.mo.gov, or 816-607-2186.
Corrective Action Required
05/09/2014

Both fire hydrants will be public improvements, and hence will require a separate engineering plan. Upon resubmittal of the Final Development Plan, please include a separate engineering plan for the fire hydrants and fire hydrant supply lines to be bored beneath the street (i.e., unless the owner of the private street will allow for open-cutting of the street). Please ensure that the fire hydrant plans show a cut-in tee at the main, bored water line if required, casing carrier pipe extending beyond the back of curb to the minimum distance shown in the Design and Construction Manual (required regardless of whether the owner of the private street will allow the open-cut method), site restoration and sidewalk repair, and please consider the use of C900 rather than DIP.
Corrective Action Required
05/09/2014

Sheet C6.0: The water meters shown as W-4 (domestic) and W-5 (irrigation) should be connected to the public water supply main feeding the new fire hydrant after the street crossing. This will allow an easier installation without the need for boring or open-cutting the street. Finally, please consider a more standard symbol for a water meter vault for W-4. The symbol used for W-4 is typically used to denote a backflow vault.
Corrective Action Required
05/09/2014

When preparing the Minor Plat for this lot, please ensure that utility easements are shown for the new fire hydrants and any portion of the fire hydrant supply lines which cross the lot. Please ensure that all water meters are fully-contained within right of way or an easement.
Corrective Action Required
05/09/2014

Sheet C6.0: The sanitary sewer connection must be made a minimum of four (4) feet from the outside of the manhole with a cut-in wye. Please revise the plans as appropriate.
Corrective Action Required
05/09/2014

Please revise Sheet C7.0 to delete the temporary construction entrance as shown, and relocate the temporary construction entrance to a location which will have minimal impact on the bank operations (i.e, further south along the Summit Fair private drive). Finally, please delete the gravel filter bags from the private street within the Summit Fair private drive. This will possibly lead to flooding issues, and the intent of the erosion and sediment control plan is to contain sediment before it leaves the site.
Corrective Action Required
05/09/2014

Sheet C7.0: It is not clear what the circled "erosion control staging" numbers refer to. Does this refer to the "Erosion Control Plan BMP Reference No." shown in the table? If so, then why are these numbers not identical (i.e., circled and including the leading zero)? Finally, what is "Stage C"? If this refers to project completion, then perhaps it would be better to state "At Project Completion"?
Corrective Action Required
05/09/2014

Sheet C7.1: The City of Lee's Summit no longer allows the use of trenched-in silt fence as shown. It must be machine-laid using the slit method. Please remove the detail, and simply reference the use of a machine-laid silt fence on the Erosion and Sediment Control plan view.
Corrective Action Required
05/09/2014

Sheet C8.0: The "Heavy Duty Asphalt Section" does not meet the Unified Development Ordinance Article 12 for pavement thickness and subgrade. Perhaps it would be better to simply remove this detail since it appears asphaltic concrete pavement will not be used on the project?
Corrective Action Required
05/09/2014

Sheet C8.4: Since it won't be used on the project, perhaps it would be better to remove the standard detail for the backflow vault?
Corrective Action Required
05/09/2014

Sheet C3.0: When preparing the separate engineering plan for the north fire hydrant, please move the connection point for the fire hydrant supply line to the public water main approximately 25 feet to the south to avoid the intersection. Suitable bends can be used after the street crossing to straighten the pipe out and feed the hydrant in the proposed location.
Corrective Action Required
05/09/2014

An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate and calculated at 3% of the total project cost plus a nominal water sample collection and observation fee. Items to include in the itemized estimate include: 1) waterlines greater than 2" diameter including any casing carrier pipe and/or boring, 2) fire hydrants, 3) valves/valve boxes/covers, 4) tees, bends, thrust blocks, and other fittings, 5) sanitary sewer laterals, 6) sanitary sewer wye, 7) manholes, 8) stormwater lines greater than 6" diameter, 9) rip rap, 10) stormwater flumes, 11) public sidewalks, 12) ADA-accessible ramps, 13) grading to establish proper drainage patterns including cut or fill, 14) grading for parking lot, 15) subgrade for parking lot including one foot beyond the back of curb, 16) pavement for parking lot, 17) curb and gutter, 18) erosion and sediment control measures and devices, 19) final restoration including sodding, seeding, fertilizer, mulch, and 20) all other items necessary to complete the site work. Please do not include any items related to the building construction, landscaping, lighting fixtures, electrical or other non-City utilities.
FINAL DEVELOPMENT PLAN
Planning Review Corrections 05/09/2014 05/09/2014
Jennifer Thompson
Corrective Action Required
05/09/2014

A minor plat application shall be submitted, reviewed, approved, and recorded prior to the issuance of a building permit.
Corrective Action Required
05/09/2014

Sign permits shall be obtained prior to installation of any signs through the Department of Planning and Codes Administration.
Corrective Action Required
05/09/2014

Once the City receives a design proposal for the gateway monument, to be located on the southwest corner of the property, we will forward to you. The proposal should be available by mid-May.
Corrective Action Required
05/09/2014

Please provide a copy of the executed access agreement for the drive entry area. The Document No.'s were provided to us at the preliminary stage, however I'm unable to access them through the County's website. During the platting process this easement will need to be reflected on the plat along with the coordination of other easements necessary for existing and or proposed utilities for this property.
Corrective Action Required
05/09/2014

On Sheet C8.0, add a comment for the accessible sign indicating model No. R7-8 is the sign type to be used. This sign has a white background with a green border.
Corrective Action Required
05/09/2014

Provide confirmation/documentation the Landscape Easement, located on the eastern property line, has been vacated with RED Development. If that is the case please remove the easement from the plans.
Fire Review Approved with Conditions 05/09/2014 05/07/2014
Jim Eden
Code Statement
Corrective Action Required
05/06/2014

Fire Department- All building and life safety issues shall comply with the 2012nternational Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 05/09/2014 05/06/2014
Michael Park
Fire Review Approved with Conditions 05/08/2014 04/28/2014
Jim Eden
Code Statement
Corrective Action Required
04/28/2014

Fire Department- All building and life safety issues shall comply with the 2012nternational Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 04/24/2014
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents