Planning Application Status

PL2013143




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2013143
LAKEWOOD BUSINESS CENTER OFFICE BUILDING, LBPV
Commercial Final Development Plan
Commercial Final Development Plan
Withdrawn
12/11/2013
LBP V LLC
Mike Weisenborn 01/14/2015 4:33 PM - FDP APPROVAL EXTENDED FOR ONE YEAR. Mike Weisenborn 01/21/2016 2:36 PM - Per Mike Atcheson, they will not be moving forward at this time and will resubmit when they are ready to develop the property.
Locations
Contacts
LBP V LLC, Address:3215 NE CARNEGIE DR STE 200, Phone:(816) 795-8100  
LBP V LLC, Address:3215 NE CARNEGIE DR STE 200, Phone:(816) 795-8100  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:11301 STRANG LINE ROAD  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:11301 STRANG LINE ROAD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 01/24/2014 01/23/2014
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
01/23/2014

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $14,154.62 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
01/23/2014

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
01/23/2014

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
01/23/2014

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
01/23/2014

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
01/23/2014

Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan if land disturbance will take place prior to obtaining a building permit. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
Planning Review No Comments 01/24/2014 01/23/2014
Christina Stanton
Fire Review Approved with Conditions 01/24/2014 01/22/2014
Jim Eden
Code Statement
Corrective Action Required
01/16/2014

Fire Department- All building and life safety issues shall comply with the 2012 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 01/24/2014 01/16/2014
Michael Park
Engineering Review Corrections 01/14/2014 01/14/2014
Gene Williams, P.E.
Corrective Action Required
01/14/2014

The heavy duty asphalt pavement section shown as an alternate on Sheet C4.4 is not in compliance with the Unified Development Ordinance (UDO) Article 12. The typical section references a geotechnical report which the City does not have in its possession. At a minimum, the City would need to review the report and the recommendations contained within it prior to deviating from the UDO requirements. The report must state that the proposed pavement section will meet or exceed the standard design specified in the most recent version of the UDO which has been updated since 2010.
Corrective Action Required
01/14/2014

The private backflow preventer vault is shown within a public easement and on top of underground power. This is not allowed. It is acceptable for the restrained valve to be within the easement provided it is not on top of the underground electric line, but the backflow preventer vault must be completely outside the limits of the easement.
Corrective Action Required
01/14/2014

Engineer's estimate appeared very low for the following items: 1) 4' ID Manhole (very low compared to recent estimates), 2) fire hydrant (somewhat low based on recent estimates), and 3) backflow vault and double check backflow preventer (extremely low compared to recent estimates).
Corrective Action Required
01/14/2014

Engineer's estimate appeared to be missing the following items: 1) thrust blocks, 2) backing blocks, 3) sanitary sewer wye connection, 4) aggregate base for heavy duty asphalt sections, 5) water valve vaults, 6) 12" by 6" water line tee.
Corrective Action Required
01/14/2014

Engineeer's estimate included a 12" by 6" tapping sleeve. A tee is to be installed rather than a tapping sleeve.
Fire Review Approved with Conditions 01/14/2014 01/13/2014
Jim Eden
Code Statement
Corrective Action Required
01/07/2014

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Marking
Carried Forward
01/13/2014

Fire Department- IFC 505.3 Where required by the fire code official, approved signs or other approved notices shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. Signs or notices shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Provide fire lane signage along the north/south lane just to the west of the tranformer pad, FDC and hydrant.
Traffic Review No Comments 01/14/2014 01/09/2014
Michael Park
Planning Review No Comments 01/14/2014 01/09/2014
Christina Stanton
Fire Review Approved with Conditions 12/27/2013 12/31/2013
Jim Eden
Code Statement
Corrective Action Required
12/19/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Hydrants
Resolved
12/31/2013

Fire Department- IFC 508.5.1 508.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Provide a hydrant near the east entrance from NE Independence. 12/30/2013- The hydrant is no longer required, however landscaping shall be arranged such that the hydrants are clearly visible and accessible from the parking lots.
Marking
Corrective Action Required
12/19/2013

Fire Department- IFC 505.3 Where required by the fire code official, approved signs or other approved notices shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. Signs or notices shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Provide fire lane signage along the north/south lane just to the west of the tranformer pad, FDC and hydrant.
Engineering Review Corrections 12/27/2013 12/27/2013
Gene Williams, P.E.
Corrective Action Required
12/27/2013

Please add a note to the cover sheet stating "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813."
Corrective Action Required
12/27/2013

Sheet C1.1: Construction note states states that a minimum slope of 1% for sanitary sewer laterals shall be the minimum. This should be changed to read 2%,
Corrective Action Required
12/27/2013

General comment: What is the bold line splitting the lot into two separate entities? Please label this line.
Corrective Action Required
12/27/2013

Sheet C1.1: The domestic water supply is not shown in accordance with the Design and Construction Manual. The fire line should be connected to the tee as shown, but the domestic water supply should be connected after it crosses the street and prior to the restrained valve. Please see the Design and Construction Manual for an illustrative narrative concerning this connection.
Corrective Action Required
12/27/2013

Sheet C1.1: The fire line is missing a restrained valve just prior to the backflow valve.
Corrective Action Required
12/27/2013

Sheet C1.1: In accordance with the Fire Department's comment concerning an additional fire hydrant, it cannot be connected to the 16" transmission main installed parallel with Independence Avenue. It appears an 8" stub-off exists just south of the new entrance which might be utilized for the fire hydrant; however, it will need to be extended to the new entrance.
Corrective Action Required
12/27/2013

The new fire hydrant will be considered private since it only serves this development. As such, it must be completely outside the limits of any easement or right of way, and should be clearly marked as "private fire hydrant". The extent of the private water line feeding the hydrant will also need to be labeled as "private fire line".
Corrective Action Required
12/27/2013

The new private fire hydrant and associated fire line will need a backflow vault since the fire hydrant is greater than fifty (50) feet from the public water main.
Corrective Action Required
12/27/2013

It appears that significant portions of the sidewalk are outside the right of way. This will require dedication of a separate sidewalk easement prior to approval of the Final Development Plan.
Corrective Action Required
12/27/2013

Please note that truncated domes are not allowed on commercial entrances. They are only required at ADA-accessible ramps serving public intersections. Please label this on the plans and the detail sheet.
Corrective Action Required
12/27/2013

Sheet C4.1: The commercial entrances should be constructed of a minimum 8" thickness KCMMB mix.
Corrective Action Required
12/27/2013

Sheet C4.4: Asphaltic concrete pavement sections are not in compliance with the Unified Development Ordinance Article 12. In general, all driving surfaces including parking stalls must have a minimum 2" thickness surface course over a 5" base course and either a) 12" prepared subgrade, b) 8" aggregrate or c) 9" flyash treated soil subgrade. The requirement is higher for fire access lanes which increase the base course requirement to 6" with all other requirements unchanged.
Corrective Action Required
12/27/2013

Sheet C4.4: The typical asphaltic concrete pavement sections reference a geotechnical report, but the geotechnical report is not on file with the City of Lee's Summit nor does the report demonstrate that the proposed thickness is at least equivalent to the requirements of the Unified Development Ordinance Article 12.
Corrective Action Required
12/27/2013

Sheet L1.1: Utilities should be superimposed upon the landscape plan to determine whether utility conflicts exist. In general, trees should be kept a minimum of five (5) feet from any City-owned utility, including water, storm sewer, and sanitary sewer.
Corrective Action Required
12/27/2013

Sheet C4.1: Silt fence detail is incorrect. The trenched-in method for silt fence installation is not allowed, and a slit-method machine-laid method must be used. If necessary, simply remove this detail and state that the machine-laid method will be used on the Erosion and Sediment Control Plan.
Corrective Action Required
12/27/2013

General comment: A detail must be provided showing the temporary construction entrance for erosion and sediment control.
Corrective Action Required
12/27/2013

Sheet C4.1: The sidewalk width on the commercial entrance shows a four (4) foot width. The City requires a five (5) foot width.
Corrective Action Required
12/27/2013

A sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and is calculated at 3% of the total plus a small water sample collection fee ($100 per sample). Please include an itemized estimate of all items necessary to complete the work, including (but not limited to): 1) private and public storm sewer, 2) private and public water lines, 3) private and public sanitary sewer lines, 4) private and public pavement, subgrade, and curb and gutter, including parking lot, 5) public sidewalk and ADA-accessible ramps (do not include private sidewalk), 6) grading for parking lot, public sidewalk, and to establish proper drainage, 7) retaining walls to establish proper drainage, 8) valves, valve boxes, thrust blocks, tees, fittings, structures, backflow vaults, backflow preventers, hydrants, valve box covers, and all other associated items, 9) erosion and sediment control measures such as temporary construction entrance, silt fence, etc., 10) erosion control blanket, 11) final sodding and restoration.
Traffic Review No Comments 12/27/2013 12/20/2013
Michael Park
Planning Review Corrections 12/27/2013 12/16/2013
Christina Stanton
Corrective Action Required
12/16/2013

Lot Area Inconsistencies. Account for the differences in lot area between the approved PDP (334,443), the approved and recorded Final Plat (334,770), the cover sheet of this FDP (334,768), and Sheet C1.1 of this FDP (334,540).
Corrective Action Required
12/16/2013

Trash Enclosure. The submitted plans appear to be missing the detail of the trash enclosure.
Corrective Action Required
12/16/2013

Parking Required Calc Correction. Under the current UDO, 1 space is required for every 1,000 square feet of warehouse, which would yield 13.6 or 14 spaces required for that use. The Total Required Spaces does appear to be correct, but the number for the warehouse portion of the building is off by 1.
Corrective Action Required
12/16/2013

ADA Parking Sign. The sign reference shall be corrected to R7-8. FYI, the double arrow is only needed when there's a row of handicapped accessible stalls or if the stall is intended for parallel parking.
Corrective Action Required
12/16/2013

Sidewalk Width. The required minimum sidewalk width is 5', some sheets either did not indicate this or indicated 4'.
Corrective Action Required
12/16/2013

Sidewalk Location. The sidewalk is shown on private property rather than being located within the right-of-way. Either move the sidewalk into the right-of-way or provide a sidewalk easement.
Corrective Action Required
12/16/2013

Lighting. Provide the spec sheets for the proposed lighting. FYI, there is a mandatory illumination reduction requirement for non-residentially developed lots that contain a minimum of four (4) parking lot light poles (Section 7.280.K). This requirement states that "parking lot lighting levels...shall be reduced by at least 50% of the full operational levels within 60 minutes after the close of business."
Corrective Action Required
12/16/2013

Wall Light. Is "C", on Sheet PH1.0, an "excepted light" per Section 7.260.D of the UDO or merely a wall-mounted light? If it is an "excepted light" the maximum wattage for incandescent is 100W. If if is simply a wall-mounted light the maximum wattage for metal halide is 150W.
Corrective Action Required
12/18/2013

Open Yard Trees. The number of required open yard trees is in addition to the number of required street frontage trees, per Section 14.090.B.3 of the UDO. The calcs for landscaping appear to have rounded up in all instances (i.e., the number of trees required for street frontage is 27 not 28, the number of trees required for open space is 28 not 29, and the number of shrubs required for open space is 57 not 58), but the number of total trees provided is short 1 tree from the required total number of trees.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/11/2013
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
12/11/2013 Letter Routing Sheet - FDP
12/27/2013 Letter Applicant Letter - FDP (DFDP)
01/07/2014 Letter Resubmittal Routing Sheet - FDP
01/14/2014 Letter Applicant Letter - FDP (DFDP)
01/16/2014 Letter Resubmittal Routing Sheet - FDP
01/23/2014 Letter Applicant Letter - FDP (DFDP)
11/17/2017 Activity Document fee worksheet
09/23/2019 Lakewood Business Park V - Minor plat
09/23/2019 Lakewood Business Park V - Minor plat
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home