Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Approved with Conditions
|
01/15/2014
|
01/22/2014
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Planning Review
|
Approved with Conditions
|
01/15/2014
|
01/21/2014
|
|
Jennifer Thompson
|
|
Corrective Action Required
Provide a professional analysis of the existing environmental conditions which addresses the potentially contaminated soil in the areas of the existing waste oil tanks and previously removed gasoline tanks. If required by the professional analysis, the existing waste oil tank shall be removed and all contaminated soil shall be properly abated prior to the issuance of any building permits. All abatement areas shall be identified on the final development plan. This documentation is needed prior to the final development plan approval.
|
|
|
Engineering Review
|
Approved with Conditions
|
01/15/2014
|
01/14/2014
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $2,277.00 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
|
|
DE Contact ROW Inspector
Corrective Action Required
Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
|
|
PW Submit Land Disturbance (DELETE)
Corrective Action Required
Submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist prior to any land disturbance activities that are to occur prior to obtaining a building permit from the Codes Department. Approval of these plans does not constitute approval of the erosion control plan. Contact Barton Reese at (816) 969-1800 for new land disturbance permitting details.
|
|
|
Traffic Review
|
No Comments
|
01/15/2014
|
01/09/2014
|
|
Michael Park
|
|
|
Engineering Review
|
No Comments
|
12/31/2013
|
01/03/2014
|
|
Jennifer Thompson
|
|
|
Planning Review
|
Corrections
|
12/31/2013
|
01/02/2014
|
|
Jennifer Thompson
|
|
Corrective Action Required
Please remove the line shown on C1.0, east of the new building and running north to south the length of the property.
|
|
Corrective Action Required
Just a reminder: Provide a professional analysis of the existing environmental conditions which addresses the potentially contaminated soil in the areas of the existing waste oil tank and previously removed gasoline tanks. If required by the professional analysis, the existing waste oil tank shall be removed and all contaminated soil shall be properly abated prior to the issuance of any building permits. All abatement areas shall be identified on the final development plan.
This documentation is needed prior to final development plan approval.
|
|
Corrective Action Required
Is any lighting proposed for the building? If so please provide the manufacture's specifications for each lighting type.
|
|
Corrective Action Required
The handicap detail shown is not the correct type of sign for Lee's Summit. The correct type is R7-8. The van accessible portion is typically beneath the accessible sign. Also, the sign should have a white background with a green border. Please revise the detail.
|
|
Corrective Action Required
It was noted that metal halide lighting is proposed for the parking lot lighting. The Unified Development Ordinance does not permit metal halide, rather LED lighting is required. Please resubmit manufacture specifications and an updated photometric drawing. If you have any questions about these requirements, please reference Article 7 in the Unified Development Ordinance.
|
|
Corrective Action Required
If the contract is used in lieu of the estimate, we need to have a signed contract with itemized units, unit costs, extended cost, and all other items necessary to determine the total project valuation.
FYI--this fee will be required before the Final Development Plan can be approved.
|
|
|
Fire Review
|
Approved with Conditions
|
12/31/2013
|
12/26/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Traffic Review
|
No Comments
|
12/31/2013
|
12/20/2013
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
11/18/2013
|
11/18/2013
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please add a note on the cover sheet stating "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813."
|
|
Corrective Action Required
Please call out the spot elevations as "existing xxx.xx" and "finish xxx.xx".
|
|
Corrective Action Required
Will any public sidewalk be disturbed and/or removed and replaced? If so, then it should be non-reinforced concrete (i.e., no WWF). Private sidewalk may include the WWF.
|
|
Corrective Action Required
Please provide a typical section of the paver replacement as discussed in Note 13 on Sheet C1.0. The City has specific requirements for pavers used for walking surfaces, and a .pdf file can be sent to the applicant. This .pdf file includes a typical section and notes.
|
|
Corrective Action Required
Are the commercial entrances to be removed and replaced? If so, then KCMMB mix concrete will be required within the right of way.
|
|
Corrective Action Required
Please provide a note on Sheet C1.0 stating that "...any work that creates a condition of non-compliance with the Americans with Disabilities Act (ADA) within the right of way (i.e., sidewalk) must be corrected by the owner" or similar language.
|
|
Corrective Action Required
An Erosion and Sediment Control Plan was missing from the submittal. An Erosion and Sediment Control Plan is required for any project where the total land disturbance is greater than 2000 square feet.
|
|
Corrective Action Required
A sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this amount, and is calculated at 3% of the total project cost. Please include an itemized estimate for the total project cost, less the actual building, water lines less than 2", trees/shrubs, and lighting. The cost estimate should include, but is not limited to, 1) parking lot construction, 2) curb and gutter, 3) subgrade preparation, 4) grading, 5) sanitary sewer lateral and connection, 6) water lines greater than 2" diameter, 7) public sidewalks and private sidewalks adjacent to public sidewalks (i.e., the paver stone sidewalk discussed in Note 13), 8) commerical entrances, 9) private paver stone construction, and 10) erosion and sediment control. The cost estimate should be broken down according to line item, units, total units, unit cost, and extended cost.
|
|
|
Planning Review
|
Corrections
|
11/18/2013
|
11/14/2013
|
|
Jennifer Thompson
|
|
Corrective Action Required
What does the line represent shown on C1.0, east of the new building and runs north to south the length of the property. Please remove the line if there is no significance.
|
|
Corrective Action Required
On Sheet C2.0, add a note on the trash enclosure detail indicating the gate material will be steel and painted to be compatible with the color of the masonry walls and building it is to serve.
|
|
Corrective Action Required
Please provide a professional analysis of the existing environmental conditions which addresses the potentially contaminated soil in the areas of the existing waste oil tank and previously removed gasoline tanks. If required by the professional analysis, the existing waste oil tank shall be removed and all contaminated soil shall be properly abated prior to the issuance of any building permits. All abatement areas shall be identified on the final development plan.
|
|
Corrective Action Required
Is parking lot lighting or wall-pak lighting proposed? Please provide the manufacture's specifications for each lighting type and a photometric sheet outlining the location of the fixtures and the corresponding foot candles.
|
|
Corrective Action Required
Add a handicap detail illustrating the sign, mounted on a pole or other structure, located between thirty-six (36) inches and sixty (60) inches above the ground, measured from the bottom of the sign. Also reference, the R7-8 sign type (white background and green border), as this is the sign type The City of Lee's Summit utilizes.
|
|
Corrective Action Required
When resubmitting, please submit six (6) full size copies and one (1) half size copy.
|
|
|
Fire Review
|
Approved with Conditions
|
11/18/2013
|
11/06/2013
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
|
|
|
Traffic Review
|
No Comments
|
11/18/2013
|
11/05/2013
|
|
Michael Park
|
|
|