Summary
PL2013093
SUMMIT CENTER PAD SITE BUILDING
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/10/2013
DACUR INVESTMENT COMPANY INC
Locations
Contacts
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
CURRY INVESTMENT COMPANY, Address:2700 KENDALLWOOD PKWY STE 208, Phone:(816) 424-5200  
SCHLAGEL & ASSOC., P.A., Address:14920 W. 107TH STREET  
SCHARHAG ARCHITECTS, Address:310 ARMOUR RD #202, Phone:(816) 221-9297  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 08/09/2013 08/09/2013
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
08/09/2013

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $4,899.30 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
08/09/2013

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
08/09/2013

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
08/09/2013

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
08/09/2013

If ground-breaking is desired prior to the issuance of a building permit from the Codes Administration Department, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist. Contact Barton Reese at (816) 969-1800 if a Land Disturbance Permit is desired prior to obtaining a building permit from the Codes Administration Department.
Planning Review Approved with Conditions 08/09/2013 08/09/2013
Chris Hughey
Corrective Action Required
08/09/2013

All roof top mechanical units shall be screened by the parapet wall equal to the height of the units.
Corrective Action Required
08/09/2013

All parking lot screening shrubs shall have a minimum height of 18 inches at the time of planting and shall be capable of growing to an overall height of 2.5 feet (or 30 inches) measured from the surface grade of the adjacent parking lot.
Fire Review Approved with Conditions 08/09/2013 08/08/2013
Jim Eden
Code Statement
Corrective Action Required
08/02/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Traffic Review No Comments 08/09/2013 08/02/2013
Michael Park
Planning Review Corrections 07/24/2013 07/23/2013
Chris Hughey
Corrective Action Required
07/23/2013

Road right-of-way. Add a note or dimension for the road right-of-way width of NW Oldham Pkwy and Now O'Brian Rd.
Corrective Action Required
07/23/2013

Roof Top Mounted Mechanical Units. Dash in the location of the roof top mechanical units (RTU's) on all four elevation drawings.
Corrective Action Required
07/23/2013

Roof Top Mounted Mechanical Units. It appears the RTU's are not fully screened by the parapet wall of the building. The parapet walls will need to be raised/adjusted to fully screen the units.
Corrective Action Required
07/23/2013

Roof Top Mounted Mechanical Units. Submit manufacture's specification sheets for all RTU's types.
Corrective Action Required
07/23/2013

Aluminum Sun Screens. Provide a detail or rendering of the aluminum sun screens.
Corrective Action Required
07/23/2013

Landscaping. Add a note to the landscaping plan stating that all impervious areas not covered with plantings or other landscaping material shall be covered with sod. (Note: This may affect the language to the notes 8 and 9.)
Corrective Action Required
07/23/2013

Landscaping. The text and image for the "Typical Shrub Planting Detail" on the landscaping plan appears to be half-toned and difficult to read. Please correct accordingly.
Corrective Action Required
07/23/2013

Landscaping. All evergreen trees are required to be 8 feet in height at the time of planting. Correct the planting legend accordingly.
Corrective Action Required
07/23/2013

Landscaping. Add a note to the landscaping plan stating all parking lot screening shrubs shall have a minimum height of 18 inches at the time of planting and shall be capable of growing to an overall height of 2.5 feet (or 30 inches) measured from the surface grade of the adjacent parking lot.
Corrective Action Required
07/23/2013

Lighting. Submit manufacturer's specification sheets for all exterior wall mounted and pole mounted light fixture types.
Traffic Review No Comments 07/24/2013 07/23/2013
Michael Park
Engineering Review Corrections 07/24/2013 07/23/2013
Gene Williams, P.E.
Corrective Action Required
07/23/2013

Please consider using 1.5% on all private sidewalk cross-slopes rather than 2% maximum cross-slope. The City currently uses this standard on all public sidewalks to allow for construction tolerance.
Corrective Action Required
07/23/2013

Sheet C5: The trench and backfill method for installation of silt fence is no longer allowed in Lee's Summit. The City requires silt fence to be installed using the machine-laid, slit method. Please remove the detail showing the trench and backfill method and either use a different detail or provide notes specifying that the machine-laid method in accordance with the City of Lee's Summit Design and Construction Manual shall be used to install silt fence.
Corrective Action Required
07/23/2013

Sheet SL1: Please show the location of all easements.
Corrective Action Required
07/23/2013

A sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate and is calculated at 3% of the total project cost. Please provide an itemized cost estimate for the entire project, with the exception of the building, lighting, and the landscaping. Erosion and sediment control should be included in the estimate.
Fire Review Approved with Conditions 07/24/2013 07/15/2013
Jim Eden
Code Statement
Corrective Action Required
07/15/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/10/2013
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/10/2013 Letter Routing Sheet - FDP
07/24/2013 Letter Applicant Letter - FDP (DFDP)
08/02/2013 Letter Resubmittal Routing Sheet - FDP
08/09/2013 Letter Applicant Letter - FDP (DFDP)
11/16/2017 Activity Document fee worksheet FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home