Planning Application Status

PL2013030




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2013030
WILSHIRE HILLS PHASE II
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/29/2013
JEFFREY E. SMITH DEVELOPMENT, INC
Locations
Contacts
Engineering Surveys & Services, Address:1113 Fay Street  
JEFFREY E. SMITH DEVELOPMENT, INC, Address:206 PEACH WAY, Phone:(573) 443-2021  
JEFFREY E SMITH INV CO LC, Address:PO BOX 7688  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 06/20/2013 06/17/2013
Jim Eden
Code Statement
Corrective Action Required
06/13/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Misc.
Corrective Action Required
06/17/2013

For Information Only- Landscaping such as trees and ground cover shall be maintained so they do not obstruct full use of the fire lane (20'-26' wide by 13'6" in height), or obstruct view and use of the fire hydrants (3' feet unobstructed).
Traffic Review No Comments 06/20/2013 06/14/2013
Michael Park
Fire Review Approved with Conditions 05/31/2013 05/28/2013
Jim Eden
Code Statement
Corrective Action Required
05/28/2013

Fire Department- All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Planning Review Corrections 05/31/2013 05/21/2013
Christina Stanton
Corrective Action Required
05/21/2013

Landscaping Plan - Sheet L1. Provide a detail of the "picket fence" used for the buffer.
Corrective Action Required
05/21/2013

Landscaping Plan - Sheet L1. Provide a detail/section view of the retaining wall.
Corrective Action Required
05/21/2013

Landscaping Plan - Sheet L1. Provide the number/calculations of "plants provided" that are not shown for open yard requirments and north buffer calculations.
Engineering Review Approved with Conditions 05/31/2013 05/20/2013
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
05/20/2013

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $12,926.44 (which is based on 3% of the total infrastructure cost plus a water test inspection fee of $100) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Department.
DE Contact Field Eng. Inspector
Corrective Action Required
05/20/2013

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
05/20/2013

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
05/20/2013

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Public Improvements TIFF CD's (DELETE)
Corrective Action Required
05/20/2013

Any public improvements will require two (2) CD ROMs with the plans in TIFF format.
Corrective Action Required
05/20/2013

Please submit the correct number of plan sets as requested by Planning. We were missing several copies of the plan sets.
Traffic Review No Comments 05/31/2013 05/16/2013
Michael Park
Engineering Review Corrections 04/19/2013 04/19/2013
Gene Williams, P.E.
Corrective Action Required
04/19/2013

Please add a note to Sheet 2 stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813." This note needs to be specific to Ordinance 5813.
Corrective Action Required
04/19/2013

Sheet 5: There appears to be considerable grading on the west side of the project. Please verify that the minimum and maximum depth of cover is not exceeded. The maximum depth of cover for water lines is 7 feet measured to the top of pipe, and the minimum depth of cover is 3.5 feet. If these numbers are exceeded, then the grading plan must be revised. The water line is likely impractical to relocate.
Corrective Action Required
04/19/2013

Sheet 6: Please show the hydraulic grade line and design storm superimposed on the profile view.
Corrective Action Required
04/19/2013

Sheet 6: Profile JB4 thru CO8 appears to show a small 8" PVC pipe entering a box lower than the crown of the receiving pipe. Please consider adjusting this design so that the receiving pipe crown is lower than the 8" PVC.
Corrective Action Required
04/19/2013

FES 17: It would appear that a concrete headwall or collar would be necessary to keep the HDPE stable at the daylight end in addition to the flared end section and concrete toe wall.
Corrective Action Required
04/19/2013

Sheet 8: Please change all references to 1/4" per foot to "...not to exceed 2%". The City would actually prefer 1.5% as the maximum cross-slope.
Corrective Action Required
04/19/2013

Sheet 9: Please see the City standard detail for pipe embedment in trenches. The City recommends the use of our standard for all private construction. If, however, the private stormwater pipe is connected to a public inlet, then the City standard for pipe embedment must be used.
Corrective Action Required
04/19/2013

General comment: It does not appear that a toe wall detail is included for the flared end section.
Corrective Action Required
04/19/2013

Sheet 4: Please consider a separate utility plan. This would include at a minimum utilities such as water, sanitary sewer, and storm sewer.
Corrective Action Required
04/19/2013

Sheet 4: Items to include on the utility plan would include the sanitary sewer connection point, backflow vault, fire hydrants, water mains, domestic water lines, fire lines, storm sewer, boxes, inlets, underground detention, and discharge points.
Corrective Action Required
04/19/2013

Sheet 4: The backflow vault must be outside the right of way and outside any public easement. It appears that the vault is within an easement. It should be moved five (5) from the easement line with an inline restrained valve installed immediately prior to the vault.
Corrective Action Required
04/19/2013

Sheet 4: The domestic water meter should be placed within right of way or a public easement within 1 foot of the right of way or easement line on the public side. It appears this condition is met, but it must also be placed prior to the inline valve placed before the backflow vault.
Corrective Action Required
04/19/2013

General comment: A separate Erosion and Sediment Control Plan is required for every project within the City of Lee's Summit. The existing permit for Land Disturbance is not sufficient to cover the activities proposed under this plan. Please include an erosion and sediment control plan with this plan set which is specific to this particular project.
Corrective Action Required
04/19/2013

General comment: It appears the curb inlet on the end of the cul-de-sac bulb is connected to something, but it is unclear from the plans what it is connected to. Please clarify.
Corrective Action Required
04/19/2013

General comment: It appears that a retaining wall is being proposed over an easement. This is not allowed.
Corrective Action Required
04/19/2013

A sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this fee and is calculated at 3% of the estimate, plus a nominal water sample collection fee. Please include an itemized list of items necessary to complete the work for this project, excluding the actual building, lighting, water feature, and on-site sidewalks.
Fire Review Corrections 04/19/2013 04/11/2013
Jim Eden
Code Statement
Corrective Action Required
04/11/2013

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Hydrants
Resolved
05/28/2013

"Fire Department- IFC 508.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official." The hydrant located near the southeast corner of the building needs to be relocated to the building side of the drive to allow truck movement to the north when in use.
Knox Box
Corrective Action Required
04/11/2013

Fire Department- IFC 506.1 Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. An approved lock shall be installed on gates or similar barriers when required by the fire code official. A Knox Box is required for the building. Obtain an application from the fire department.
Misc.
Resolved
05/28/2013

AERIAL FIRE APPARATUS ACCESS ROADS D105.1 Where required. Buildings or portions of buildings or facilities exceeding 30 feet (9144 mm) in height above the lowest level of fire department vehicle access shall be provided with approved fire apparatus access roads capable of accommodating fire department aerial apparatus. Overhead utility and power lines shall not be located within the aerial fire apparatus access roadway. D105.2 Width. Fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm) in the immediate vicinity of any building or portion of building more than 30 feet (9144 mm) in height. Provide a 26 foot drivable surface, primarilly in the area of the front (main entrance) of the building.
Traffic Review No Comments 04/19/2013 04/11/2013
Michael Park
Planning Review Corrections 04/19/2013 04/05/2013
Christina Stanton
Corrective Action Required
04/05/2013

Address. Please note that the address assigned to this lot is 3360 NE Wilshire Drive.
Corrective Action Required
04/05/2013

Missing Landscape Plan. Please submit for review.
Corrective Action Required
04/05/2013

Trash Enclosure. Shall be constructued of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve. Provide a detail of the trash enclosure.
Corrective Action Required
04/05/2013

Service Bluiding. Provide elevations/detail of the proposed service building. In addition, Codes noted that there was a pavillion shown in their elevations (this detail needs to be provided to Planning as well) but the location is not shown on the Site Plan; please rectify.
Corrective Action Required
04/05/2013

Parking Lot Lighting Height. The approved Preliminary Development Plan (PDP) indicated a maximum pole height of 12 feet. The Unified Development Ordinance (UDO) requires all light fixtures on properties with, or adjoining, residential uses to not exceed 15 feet in height. Bases are not to exceed 3 feet in height. Reduce the proposed 20 foot pole height to meet the height that was approved per the Preliminary Development Plan.
Corrective Action Required
04/05/2013

Parking Lot Lighting Wattage. Both the approved PDP and the UDO require a maximum wattage of 175-watts per head. Reduce the proposed 250-watt parking lights to meet the approved plans.
Corrective Action Required
04/09/2013

Parking Lot Lighting-Fixture Type. Our UDO has changed since the PDP was originally approved, we now require a minimum of 50% of the parking lot light fixtures to be solar powered, or 100% to utilize LED light fixtures. However, your development was approved prior to this requirement so you may use metal halide, but it may be to your advantage to incorporate some LED.
Corrective Action Required
04/09/2013

Building Lighting-Clarification. Is it intended that the wall-mounted fixtures will be used to accent architectural features, fascia, landscaping, flags, art, or other objects for architectural or landscape purposes? Are all the outdoor lights proposed International Dark-Sky Association (IDA) approved fixtures?
Corrective Action Required
04/09/2013

Accessible Parking Sign. Note, and make corrections accordingly, that the accessible parking sign shall comply with the R7-8 standard. Every accessible parking space shall be identified by a sign, mounted on a pole or other structure, located between thirty-six (36) inches and sixty (60) inches above the ground, measured from the bottom of the sign, at the head of the parking space.
Corrective Action Required
04/10/2013

Mechanical Units. Rooftop or ground-level mechanical units shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop-mounts or by providing screening for ground-mounted units with landscaping or a masonry wall up to a height of the units to be screened. The location of these units are not indicated on the plans submitted to Planning, please provide plans that show where these units are located and how they are being screened.
Corrective Action Required
04/18/2013

Elevations. Provide the color schedule on elevations. In addition, please note that "Cherokee block" is probited. Staff requests a sample of the proposed "Kingsize Brick".
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 04/04/2013
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/29/2013 Letter Routing Sheet - FDP
04/05/2013 Letter Routing Sheet - FDP
04/19/2013 Letter Applicant Letter - FDP (DFDP)
05/14/2013 Letter Resubmittal Routing Sheet - FDP
05/20/2013 fee worksheet PL2013 013.xlsx
05/20/2013 EEOPCC.pdf
05/23/2013 Letter Resubmittal Routing Sheet - FDP
05/31/2013 Letter Applicant Letter - FDP (DFDP)
06/13/2013 Letter Resubmittal Routing Sheet - FDP
07/23/2013 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home