Planning Application Status

PL2011019




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2011019
CHAPMAN PLAZA II
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
02/24/2011
KRAFT THOMAS ANTHONY-TRUSTEE
Locations
Contacts
LAWN & LEISURE OF LEE'S SUMMIT, Address:706 SE BLUE PKWY, Phone:(816) 524-6695  
KRAFT THOMAS ANTHONY-TRUSTEE, Address:706 SE BLUE PKWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 05/03/2011 04/01/2011
Hector Soto Jr.
Traffic Review No Comments 05/03/2011 04/01/2011
Hector Soto Jr.
Fire Review No Comments 05/03/2011 04/01/2011
Hector Soto Jr.
Engineering Review No Comments 05/03/2011 04/01/2011
Hector Soto Jr.
Planning Review Corrections 04/01/2011 04/01/2011
Hector Soto Jr.
Fire Review Complete 04/01/2011 03/31/2011
Jim Eden
Code Statement
Corrective Action Required
03/31/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Imposed Loads
Corrective Action Required
03/31/2011

Fire Department- IFC 503.2.3 Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Fire Dept. Access (150)
Corrective Action Required
03/31/2011

Fire Department- IFC 503.1.1 Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Future construction on the lot may require additional fire department access and, or automatic fire protection.
Traffic Review No Comments 04/01/2011 03/31/2011
Michael Park
Engineering Review Corrections 04/01/2011 03/30/2011
Tony Reames
Corrective Action Required
03/30/2011

Shall provide proof on a private easement granted from Lot 3 and Lot 2 to Lot 1 for private storm sewer infrastructure. Also provided proof of a maintenance agreement or easement from Lot 2 to Lot 1 for the maintenance of the stormwater detention.
Corrective Action Required
03/30/2011

All engineering plans and studies, including water, sanitary sewers, storm drainage, and streets are required with the final development plan.
Corrective Action Required
03/30/2011

All engineering plan review and inspection fees shall be paid prior to the issuance of any permits (except land disturbance).
Corrective Action Required
03/30/2011

A Land Disturbance Permit shall be obtained from the Public Works Department if ground breaking will take place prior to a building permit being issued.
Fire Review Complete 03/11/2011 02/25/2011
Jim Eden
Imposed Loads
Corrective Action Required
02/25/2011

Fire Department- IFC 503.2.3 Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Code Statement
Corrective Action Required
02/25/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fire Dept. Access (150)
Carried Forward
02/25/2011

Fire Department- IFC 503.1.1 Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Future construction on the lot may require additional fire department access and, or automatic fire protection.
Fees
Paid Fees Amount Paid Owing Date Paid
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 02/24/2011
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 02/24/2011
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 02/24/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 04/12/2011 05:00 PM 04/12/2011 05:00 PM
Public Hearing Review
Pending
04/12/2011
City Council Ordinance 05/05/2011 06:15 PM Council Chambers 05/05/2011 06:15 PM
Public Hearing Review
Pending
05/05/2011
City Council Public Hearing 05/05/2011 06:15 PM Council Chambers 05/05/2011 06:15 PM
Public Hearing Review
Pending
05/05/2011
Documents & Images
Date Uploaded File Type Document Name
02/24/2011 Letter Routing Sheet
03/09/2011 Letter Routing Sheet
04/08/2011 Letter PC LTTR
05/05/2011 Letter CC Public hearing letter
06/08/2011 Letter CC Ord Ltr
06/08/2011 Letter CC Ord Ltr
06/08/2011 Ordinance CC Ord
12/19/2016 Ordinance ORDINANCE #7056
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home