Planning Application Status



 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019247
CITY SOLAR (VARIOUS LOCATIONS) - GROUND MOUTED ARRAYS
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
07/31/2019
CITY OF LEES SUMMIT
Locations
Reviews
Review Type Outcome Est. Completion Completed
Traffic Review No Comments 08/19/2019
Hector Soto Jr. N/A
Engineering Review Approved with Conditions 08/19/2019
Hector Soto Jr. N/A
Planning Review Approved with Conditions 08/19/2019
Hector Soto Jr. N/A
Assign Reviewers Complete 08/07/2019 08/19/2019
Hector Soto Jr. N/A
Fire Review Approved with Conditions 08/12/2019
Jim Eden N/A
Code Statement
Corrective Action Required
08/12/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
08/15/2019 fire station 2
08/15/2019 High Service Pump (Revised)
08/15/2019 Maintenance facility
08/15/2019 South Terminal Pump Station
08/16/2019 tudor road pump station revised
08/16/2019 Drawing Location Map
08/16/2019 Letter PL2019-247 PDP Solar Arrays PC
08/23/2019 Letter Citizen Correspondence
09/25/2019 Ordinance Signed Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, .dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.

Once you have chosen the files you wish to upload, please click the "Next Step" button located at the bottom of the page, to complete your submission.


Select any documents you wish to provide:






Portal Home