Summary
PL2019112
THE TRAILS OF PARK RIDGE, 4TH PLAT, LOTS 70-115
Final Plat
In Plan Review
03/25/2019
TRAILS OF PARK RIDGE LLC
Locations
Reviews
Review Type Outcome Est. Completion Completed
Engineering Review Approved with Conditions 05/13/2019 05/28/2019
Sue Pyles N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
05/24/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
05/24/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
05/24/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
05/24/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
05/24/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
05/24/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
GIS Review Corrections 05/13/2019 05/24/2019
Kathy Kraemer N/A
Corrective Action Required
05/24/2019

Please provide the dimension of the centerline of Fuchsia where Fuchsia meets Chapel Manor.
Corrective Action Required
05/24/2019

Please provide the distances on each side of the centerlines where Chapel Manor meets Parkwood.
Corrective Action Required
05/24/2019

Please clarify where R=214.36 L- 423.44 belongs.
Corrective Action Required
05/24/2019

Please provide a distance on either side of the centerline where Parkwood meets Woods Chapel.
Corrective Action Required
05/24/2019

Sign easement detail refers to "Lot 115", which should be "Block 2."
Traffic Review Corrections 05/13/2019 05/21/2019
Joshua Johnson N/A
Fire Review Corrections 05/13/2019 05/21/2019
Joshua Johnson N/A
Planning Review Corrections 05/13/2019 05/21/2019
Joshua Johnson N/A
Planning Review Approved with Conditions 05/13/2019 05/15/2019
Hector Soto Jr. N/A
Corrective Action Required
04/25/2019

Right of Way Tracts. If the HOA ever wants a sign or landscaping, they will need to enter into a license agreement with the City.
Corrective Action Required
04/25/2019

Street name. Please change the street name from Woodcrest Dr to Parkwood Dr.
Corrective Action Required
04/25/2019

BL Labeling. Please label the Build Line along with the Utility Easement.
Corrective Action Required
04/25/2019

30 Labeling. Please extend an arrow from the labeling of the 30’D/E DOC# 2007E0119936 to show what the line is both sides of the coordinate line.
Engineering Review Approved with Conditions 05/13/2019 05/13/2019
Sue Pyles N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
05/13/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
05/13/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
05/13/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
05/13/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
05/13/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
05/13/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
GIS Review Corrections 05/13/2019 04/30/2019
Kathy Kraemer N/A
Corrective Action Required
04/30/2019

Please provide bearings and distances on all road centerlines.
Corrective Action Required
04/30/2019

Please provide centerline distance where Parkwood meets Fuchsia Ln.
Traffic Review No Comments 05/13/2019 04/26/2019
Michael Park N/A
Fire Review No Comments 05/13/2019 04/26/2019
Jim Eden N/A
GIS Review Corrections 04/12/2019 04/17/2019
Kathy Kraemer N/A
Corrective Action Required
04/12/2019

Electronic copies were uploaded on April 10th. Staff has not had an opportunity to review.
Corrective Action Required
04/17/2019

Please provide bearings and distances on all road centerlines.
Corrective Action Required
04/17/2019

Please provide centerline distance where Parkwood meets Fuchsia Ln.
Engineering Review Corrections 04/12/2019 04/12/2019
Sue Pyles N/A
Corrective Action Required
04/12/2019

The proposed water line alignment north of NE Chapel Manor Drive does not appear to be within the proposed easement. Verify and revise as needed.
Planning Review Corrections 04/12/2019 04/12/2019
Hector Soto Jr. N/A
Corrective Action Required
04/09/2019

Building setback lines. Why are the build lines 70ft back and 50ft back on lots 114 and 113? Would the developer consider eliminating the sign on Lot 114 in order to maintain a similar front setback to the other subdivision lots? Or it is possible to create a common area tract closer to the corner, but outside of any necessary easement, so as not to push back the front building line?
Corrective Action Required
04/10/2019

Lot 115. Add a limit of no access note to Lot 115 to include the currently named NE Woodcrest Dr (to be renamed NE Parkwood Dr).
Corrective Action Required
04/10/2019

Signature block. Change the department name above Ryan Elam's signature line to Development Services Department.
Corrective Action Required
04/12/2019

STREET NAME CHANGE. The developer shall submit a street name change application to change the name of NE Woodcrest Dr to NE Parkwood Dr.
Corrective Action Required
04/12/2019

VACATION OF RIGHT-OF-WAY. The west entrance to this subdivision has a median that is platted as a common area tract under the ownership and maintenance of the HOA. The east entrance to the subdivision has two medians not in common area tracts that appear to be the responsibility of the City. Internal discussions between City departments are taking place as to the desired direction for ownership of said medians. Dependent on the outcome of those discussions, the developer may be required to submit a vacation of right-of-way application so that both ownership and maintenance of said east entrance medians fall under the HOA. Staff will keep you aprised of the outcome.
Corrective Action Required
04/12/2019

ADDRESSES. Addresses will be provided under separate cover.
Corrective Action Required
04/12/2019

LOT 115. Is the intent for Lot 115 to be developed in the same manner as the abutting property to the west, meaning with attached dwelling units surrounded by common area? If so, Lot 115 shall be renamed Block 2 to remain consistent with the abutting property's naming convention.
Corrective Action Required
04/12/2019

SIDEWALKS. The sidewslk note on Sheet 1 states that sidewalks shall be constructed at the time the public infrastructure is constructed. Confirm that this is correct, rather than construction of sidewalks along individual lots at the time the individual lots are developed. The City has no objection to construction of the entire sidewalk network at the time of infrastructure construction because it eliminates gaps that exist in the sidewalk network until such time as the entire subdivision is built out.
Fire Review No Comments 04/12/2019 04/02/2019
Jim Eden N/A
Traffic Review No Comments 04/12/2019 03/28/2019
Michael Park N/A
Assign Reviewers Complete 03/25/2019 03/26/2019
Michael Weisenborn N/A
Hearings
Title Location Date Time
Planning Commission Meeting 05/23/2019 05:00 PM Council Chambers 05/23/2019 05:00 PM
Application Review
Pending
05/23/2019
Documents & Images
Date Uploaded File Type Document Name
03/25/2019 Receipt Receipt for transaction: 2019-001023
03/25/2019 Letter Routing Sheet
04/10/2019 FINAL PLAT PG 1
04/10/2019 FINAL PLAT PG 2
04/12/2019 Letter Applicant Letter - FP (DRCF)
04/22/2019 Plans TRAILS OF PARK RIDGE 4TH FINAL PLAT
04/22/2019 Letter Resubmittal Routing Sheet
05/16/2019 Drawing Location Map
05/21/2019 Letter Applicant Letter - FP (DRCF)
05/24/2019 Plans Trails of Park Ridge 4th Final Plat
05/24/2019 Letter Resubmittal Routing Sheet