Summary
PL2019090
MC POWER TRACKER
Commercial Preliminary Development Plan
Approved
02/28/2019
H I LLC
Locations
Reviews
Review Type Outcome Est. Completion Completed
Engineering Review Approved with Conditions 03/22/2019
Kent Monter N/A
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
03/22/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
03/22/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
03/22/2019

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed information on the location of the proposed ground-mounted solar arrays in relation to existing public storm sewer and water lines and their associated public easements as well as an existing MoDot drainage easement.
Fire Review Complete 03/19/2019 03/18/2019
Jim Eden N/A
Code Statement
Informational
03/18/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Misc.
Informational
03/18/2019

605.11.4 Ground-mounted photovoltaic arrays. Ground-mounted photovoltaic arrays shall comply with Sections 605.11 through 605.11.2 and this section. Setback requirements shall not apply to ground-mounted, free-standing photovoltaic arrays. A clear, brush-free area of 10 feet (3048 mm) shall be required for ground-mounted photovoltaic arrays.
Planning Review Corrections 03/19/2019 03/18/2019
Hector Soto Jr. N/A
Corrective Action Required
03/18/2019

MODIFICATION NARRATIVE. Provide a narrative outlining the justification for the request to allow the ground mounted solar panels along the street frontage.
Traffic Review Not Required 03/06/2019
Dawn Bell N/A
Assign Reviewers Complete 03/06/2019 03/06/2019
Dawn Bell N/A
Hearings
Title Location Date Time
Planning Commission Meeting 03/28/2019 05:00 PM Council Chambers 03/28/2019 05:00 PM
Application Review
Pending
03/28/2019
City Council Ordinance 04/16/2019 06:15 PM Council Chambers 04/16/2019 06:15 PM
Application Review
Pending
04/16/2019
City Council Public Hearing 04/02/2019 06:00 PM Council Chambers 04/02/2019 06:00 PM
Application Review
Pending
04/02/2019
Documents & Images
Date Uploaded File Type Document Name
03/06/2019 site plan
03/19/2019 Drawing Location Map
03/19/2019 Letter Modification Narrative
03/19/2019 Photograph Photos
03/19/2019 Drawing Site Plan
04/22/2019 Ordinance Signed Ordinance