Summary
PL2018208
Cobey Creek, 1st Plat
Final Plat
In Plan Review
11/21/2018
JCM DEVELOPMENT LLC
Locations
Reviews
Review Type Outcome Est. Completion Completed
Engineering Review Corrections 12/07/2018 12/07/2018
Gene Williams N/A
Corrective Action Required
12/07/2018

The floodplain note needs revisions. It should be based on the findings of the FIRM, and suggested language would read "...The FIRM Panel No. xxxxxxx, dated Jan. 20, 2017 shows this area is in Zone X, areas of minimal flooding outside the 0.2% chance flood zone" or equivalent language.
Corrective Action Required
12/07/2018

The sidewalk note must be removed. It is not correct, and does not correspond to the requirement that all ADA-accessible ramps be installed with the development, sidewalks along Tracts, and sidewalks along unplatted property be installed with the subdivision improvements.
Corrective Action Required
12/07/2018

Sidewalk is shown terminating prior to the plat boundary. Please show sidewalk termination points all the way to the plat boundary, rather than truncating them prior to the plat boundary. There are several instances where this is incorrectly shown, such as the termination points at: 1) Tract H missing a 10 foot piece of sidewalk prior to the plat boundary, 2) west end of SE Tyler Rd. being shown terminating 10 feet prior to the plat boundary, 3) southeast corner of Lot 140 is missing a 10 foot section prior to the plat boundary, and 4) the west end of SE Aspen Dr. is shown with a 10 foot gap in the sidewalk prior to the plat boundary. All of these sidewalks should be shown to the plat boundary.
Planning Review Corrections 12/07/2018 12/07/2018
Shannon McGuire N/A
Corrective Action Required
12/07/2018

Please propose new names for SE Riley Way, SE Melissa Drive, SE Tyler Road and SE Aspen Drive as they already exist elsewhere within the City.
Corrective Action Required
12/07/2018

Please include the full plat title to include lot and tract numbers in the City certification block.
Corrective Action Required
12/07/2018

Please update the City’s signature block to reflect the current City Clerk, Trisha Fowler Arcuri.
Corrective Action Required
12/07/2018

Please show the required sidewalk along the full length of Tract D parallel to SE Carter Road.
Corrective Action Required
12/07/2018

There are numerous areas where a required sidewalk stops short of the plat boundary, i.e. Northside of SE Aspen Drive adjacent lot 140, SE Aspen Dr & SE Tyler Rd streets stubs west of SE Cobey Creek Dr. Please ensure that required sidewalks are shown extending to the plat boundaries throughout the plat.
Corrective Action Required
12/07/2018

A 5’ sidewalk is required on the south side of SE Aspen Drive.
Corrective Action Required
12/07/2018

Please label the U/E adjacent to lots 152-159.
Corrective Action Required
12/07/2018

Please and a limited access note to lots 140 and 152 stating no direct vehicular access will be allowed to SE Aspen Drive.
Corrective Action Required
12/07/2018

Please add the total area in square feet to sheet 1 of 4.
Corrective Action Required
12/07/2018

Please show the shared use path that runs parallel to Mo-150 as 10’.
GIS Review Corrections 12/07/2018 12/03/2018
Kathy Kraemer N/A
Corrective Action Required
11/30/2018

The excepted tract has an error in the legal. The 7th call after the POB should be N02-05-50E (24.18) instead of NW.
Corrective Action Required
11/30/2018

ROW distances and distances from centerlines should be noted on each street.
Corrective Action Required
11/30/2018

In addition to the 3 streets mentioned in the Fire Dept review, Riley is also a street name used in another part of the city.
Traffic Review Corrections 12/07/2018 12/03/2018
Michael Park N/A
Corrective Action Required
12/03/2018

Shared-Use path along M-150 should be 10', not 8', unless otherwise approved by MoDOT.
Corrective Action Required
12/03/2018

There should be a 5' sidewalk along the south side of Aspen Drive.
Fire Review Corrections 11/29/2018 11/27/2018
Jim Eden N/A
Misc.
Corrective Action Required
11/27/2018

Street names need to be changed. Melissa, Tyler and Aspen are already used in other parts of the city and in nearby Greenwood.
Assign Reviewers Complete 11/28/2018 11/27/2018
Joshua Johnson N/A
Hearings
Title Location Date Time
Planning Commission Meeting 01/24/2019 05:00 PM Council Chambers 01/24/2019 05:00 PM
Application Review
Pending
01/10/2019
Documents & Images
Date Uploaded File Type Document Name
11/21/2018 Receipt Receipt for transaction: 2018-007340
11/21/2018 Plans Legal Description
11/21/2018 Plans Closure Report
11/21/2018 Plans Closure Report
11/21/2018 Plans Wetland Delineation
11/21/2018 Plans Pavement Evaluation
11/21/2018 Plans Cobey Creek, 1st Plat
11/21/2018 Letter Routing Sheet
12/07/2018 Letter Applicant Letter - FP (DRCF)
Portal Home