PL2018060
EAGLE CREEK 16TH PLAT
Final Plat
City Council
04/20/2018
HUNT MIDWEST REAL EST DEV INC
Locations
Reviews
Review Type Outcome Est. Completion Completed
Planning Review Approved with Conditions 06/19/2018 06/19/2018
Jennifer Thompson N/A
Traffic Review Approved with Conditions 06/19/2018 06/19/2018
Michael Park N/A
Corrective Action Required
06/19/2018

Ladderback Drive is also a collector with no access to residential lots, similar to Eagle View Dr.
Fire Review No Comments 06/19/2018 06/14/2018
Jim Eden N/A
Engineering Review Approved with Conditions 06/19/2018 06/12/2018
Sue Pyles N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
06/12/2018

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
06/12/2018

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #05 As-Graded MDP
Corrective Action Required
06/12/2018

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/12/2018

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
06/12/2018

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #06 Land Disturbance
Corrective Action Required
06/12/2018

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
GIS Review Corrections 06/19/2018 06/05/2018
Kathy Kraemer N/A
Corrective Action Required
06/05/2018

Needs addresses
Traffic Review Corrections 05/04/2018 05/17/2018
Michael Park N/A
Corrective Action Required
05/17/2018

Ladderback Drive is also a collector with no access to residential lots, similar to Eagle View Dr.
Planning Review Corrections 05/04/2018 05/04/2018
Jennifer Thompson N/A
Corrective Action Required
05/01/2018

Addressing will come under separate cover.
Corrective Action Required
05/01/2018

Label the streets on Sheet 2 for SW Ladderback and SW Eagle View Dr. and label the right-of-way widths.
Corrective Action Required
05/01/2018

Label the existing 5 foot sidewalk along the northeast side of SW Ladderback Dr. Label the proposed 5 foot sidewalk on the east side of SW Ladderback Dr., north of SW River Trail Rd.
Corrective Action Required
05/01/2018

On the south side of SW River Trail Rd and the west side of Ladderback there is a 30'SE and a 15' UE, should this carry over?
Corrective Action Required
05/01/2018

Align the city signature blocks so they are on the same location on each sheet.
Corrective Action Required
05/01/2018

Revise the Mayor's signature line to read: William A. Baird
Corrective Action Required
05/01/2018

A temporary turn around easement is noted on the adjacent plat. Staff will begin the process to vacate this easement.
Corrective Action Required
05/01/2018

Lot widths for 723, 732, 733, 734 too narrow. The R-1 zoning district requires a minimum of 70 feet.
Corrective Action Required
05/01/2018

There are odd utility widths along SW Old Port Rd and SW Hickory Ln., are these necessary?
Corrective Action Required
05/01/2018

No final plat shall be recorded by the developer until the Director of Planning and Special Projects and the City Attorney have reviewed and approved the declaration of covenants and restrictions pertaining to common property as prepared in accordance with Section 5.330 of the UDO, and until the Director has received certification from the Missouri Secretary of State verifying the existence and good standing of the property owners’ association required by Section 5.340 of the UDO. In addition, the approved Declaration of Covenants, Conditions and Restrictions shall be recorded prior to the recording of the final plat.
Corrective Action Required
05/01/2018

A final plat shall be approved and recorded prior to any building permits being issued.
Corrective Action Required
05/01/2018

The covenants and restrictions shall conform to the common property regulations in Article 5 of the UDO.
Engineering Review Corrections 05/04/2018 05/02/2018
Sue Pyles N/A
Corrective Action Required
05/02/2018

It appears that the utility easement for the storm sewer on Lot 747, between structures 1-1 & 1-2, isn’t of adequate width. Revise as needed.
Fire Review No Comments 04/23/2018
Jim Eden N/A
GIS Review Corrections 05/04/2018 04/23/2018
Kathy Kraemer N/A
Corrective Action Required
04/23/2018

ITBs for curves should be listed for the streets Old Port Rd and Hickory Ln. Need addresses or address table
Assign Reviewers Complete 04/20/2018
Michael Weisenborn N/A
Hearings
Title Location Date Time
Planning Commission Meeting 06/26/2018 05:00 PM Council Chambers 06/26/2018 05:00 PM
Application Review
Approved
06/12/2018
Documents & Images
Date Uploaded File Type Document Name
04/20/2018 Receipt Receipt for transaction: 2018-001516
04/20/2018 Plans 018-0847 Closer Report
04/20/2018 Plans Eagle Creek-Sixteenth Plat Description 2018.04.03
04/20/2018 Plans Final Plat Application Eagle Creek 16th
04/20/2018 Plans Title Report
04/20/2018 Plans V_FPT_80847_PAGE 1-FINAL PLAT PAGE 1
04/20/2018 Plans V_FPT_80847-FINAL PLAT PAGE 2
04/20/2018 Letter Routing Sheet
05/04/2018 Letter Applicant Letter - FP (DRCF)
05/31/2018 Plans V_FPT_80847_PAGE 1
05/31/2018 Plans V_FPT_80847_PAGE 1
05/31/2018 Plans V_FPT_80847_PAGE 2
05/31/2018 Plans V_FPT_80847_PAGE 2
05/31/2018 Plans 18-05-31_SRVY_Response Letter_Final Plat
05/31/2018 Letter Resubmittal Routing Sheet
06/22/2018 PL2018-060 FP Eagle Creek, 16th Plat PC