Summary
PL2018059
WINTERSET VALLEY 12TH PLAT
Final Plat
Recorded
04/20/2018
WINTERSET 6 LLC
Locations
Reviews
Review Type Outcome Est. Completion Completed
Engineering Review Approved with Conditions 06/05/2018 07/03/2018
Gene Williams N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
06/05/2018

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
07/03/2018

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #06 Land Disturbance
Corrective Action Required
07/03/2018

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
07/03/2018

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
07/03/2018

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
07/03/2018

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
07/03/2018

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
Planning Review Corrections 06/05/2018 06/05/2018
Hector Soto Jr. N/A
Corrective Action Required
06/05/2018

No final plat shall be recorded by the developer until the Director of Planning and Special Projects and the City Attorney have reviewed and approved the declaration of covenants and restrictions pertaining to common property as prepared in accordance with Section 5.520 of the UDO, and until the Director has received certification from the Missouri Secretary of State verifying the existence and good standing of the property owners’ association required by Section 5.510 of the UDO. In addition, the approved Declaration of Covenants, Conditions and Restrictions shall be recorded prior to the recording of the final plat.
Corrective Action Required
06/05/2018

A final plat shall be approved and recorded prior to any building permits being issued.
Traffic Review No Comments 06/05/2018 06/05/2018
Michael Park N/A
Fire Review Approved with Conditions 06/05/2018 05/23/2018
Jim Eden N/A
GIS Review No Comments 06/05/2018 05/22/2018
Kathy Kraemer N/A
Planning Review Corrections 05/04/2018 05/07/2018
Chris Hughey N/A
Corrective Action Required
05/04/2018

Correct Mayor's signature line to read "William A. Baird".
Corrective Action Required
05/04/2018

Sidewalks. Show the sidewalks from Sheet 1 also on Sheets 2 and 3.
Corrective Action Required
05/04/2018

Addresses. Addresses will be assigned by City staff in the near future. Informational Only.
Engineering Review Corrections 05/04/2018 05/03/2018
Gene Williams N/A
Corrective Action Required
05/03/2018

Adjustments to easement widths may be necessary after a review of the engineering plans for this development. The review of these engineering plans is scheduled to be complete by May 14, 2018.
Corrective Action Required
05/03/2018

Please make the drainage note bold, in capital letters, and capitalize the phrase "Master Drainage Plan".
Corrective Action Required
05/03/2018

Sidewalks do not appear to have been shown.
Traffic Review No Comments 05/04/2018 05/03/2018
Michael Park N/A
GIS Review Corrections 05/04/2018 05/02/2018
Kathy Kraemer N/A
Corrective Action Required
05/01/2018

Lots need addresses or please add an address table.
Fire Review No Comments 04/23/2018
Jim Eden N/A
Assign Reviewers Complete 04/23/2018
Michael Weisenborn N/A
Hearings
Title Location Date Time
Planning Commission Meeting 06/12/2018 05:00 PM Council Chambers 06/12/2018 05:00 PM
Application Review
Approved
06/12/2018