Summary
PL2017089
The Grove at Lee's Summit Final Plat
Final Plat
In Plan Review
04/21/2017
THE GROVE AT LEES SUMMIT LLC
Locations
Reviews
Review Type Outcome Est. Completion Completed
GIS Review No Comments 11/07/2018
Kathy Kraemer N/A
Fire Review No Comments 06/06/2017 06/06/2017
Jim Eden N/A
Misc.
Corrective Action Required
05/31/2017

Confirm addressing with Development Services.
Engineering Review Approved with Conditions 06/06/2017 06/06/2017
Gene Williams N/A
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
06/06/2017

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/06/2017

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
06/06/2017

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #06 Land Disturbance
Corrective Action Required
06/06/2017

A Land Disturbance Permit shall be obtained from the Public Works Department if ground breaking will take place prior to the issuance of an infrastructure permit or prior to the approval of the Final Development Plan / Engineering Plans.
Traffic Review No Comments 06/06/2017 06/05/2017
Michael Park N/A
Planning Review No Comments 06/06/2017 05/31/2017
Christina Stanton N/A
Engineering Review Corrections 05/12/2017 05/12/2017
Gene Williams N/A
Corrective Action Required
05/12/2017

Please remove the reference to the "Master Drainage Plan" under the "Restriction" note, and replace it with the following language: "...individual lot owners shall not change or obstruct the drainage flow lines or paths on the lots unless specific application is made and approved by the City Engineer." The reason for this change is that a Master Drainage Plan is not required for this site.
Traffic Review No Comments 05/12/2017 05/11/2017
Michael Park N/A
Planning Review Corrections 05/12/2017 05/04/2017
Christina Stanton N/A
Legal Description
Corrective Action Required
05/04/2017

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
05/04/2017

Revise the heading for Mr. Robert McKay's approval block from "Planning & Copes Administration" to "Planning & Special Projects". Likewise, correct his title to match this new heading.
Corrective Action Required
05/04/2017

Tract A shall be owned and maintained by a Property Owners Association per the requirements of Division V in Article 5 of the UDO.
Corrective Action Required
05/04/2017

Addressing. Staff has assigned addressing as follows: Lot 1 1411 SE Summit Street Lot 2 1407 SE Decker Street Tract A 1409 SE Summit Street
Corrective Action Required
05/05/2017

Fire Review Approved with Conditions 05/05/2017 04/26/2017
Jim Eden N/A
Misc.
Corrective Action Required
04/26/2017

Confirm addressing with Development Services.
Assign Reviewers Complete 04/24/2017
Chris Hughey N/A
Hearings
Title Location Date Time
Planning Commission Meeting 06/13/2017 05:00 PM Council Chambers 06/13/2017 05:00 PM
Code Review
Pending
06/13/2017
City Council Public Hearing 07/13/2017 06:15 PM Council Chambers 07/13/2017 06:15 PM
Code Review
Pending
07/13/2017
Documents & Images
Date Uploaded File Type Document Name
04/21/2017 Letter Routing Sheet
04/25/2017 Receipt Receipt for transaction: 2017-001585
05/31/2017 Letter Resubmittal Routing Sheet
06/12/2017 Letter PL2017-089 FP The Grove at LS 1st Plat PC