Permit Application Status

PRSUBDPWFC20174063


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBDPWFC20174063
Public Infrastructure
Final Acceptance
B & D BUSINESS HOLDINGS LLC
DEVELOPMENT COMPLETE
PUBLIC WATER MAIN EXTENSION
12/18/2017
01/04/2018
03/23/2023
Locations
Contacts
B & D BUSINESS HOLDINGS LLC, Address:24000 W 43RD STREET  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
ED MOORE CONSTRUCTION COMPANY, INC., Address:413 EAST MAIN ST, Phone:(913) 856-2300  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/02/2018 01/03/2018
John DiMauro
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $1,552.50 $1,552.50 Paid 12/21/2017
9110072-Water Test Fee $200.00 $200.00 Paid 12/21/2017
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 1/19/2018 at 10:00 AM 01/19/2018
PW-Misc
Informational
01/19/2018
John DiMauro 01/19/2018 3:56 PM Jeremy Young and I surveyed the surrounding businesses to see the potential impact of the future shutdown for the water line install. At this time it appears that an after hours shutdown will be required. We will relay this information to the contractor.
Water Line - Thrust Restraint Partial 2/27/2018 at 1:25 PM 02/27/2018
PW-Misc
Informational
02/27/2018
Jeremy Young 02/27/2018 3:19 PM Contractor installed 6" C900 pipe for fire line restraint. They also added DIP and covered it wil poly wrap 12 mil and clear as per city specs. They had at least 6" of rock covering the pipe and a tracer wire run into the building and will add water tape 18-24" below the finished grade. The contractor aslo poured the thrust block which was KCMMB 4K mix. The contractor is backfilling the trench.
Site Visit Partial 2/27/2018 at 10:15 AM 02/27/2018
PW-Misc
Informational
01/19/2018
John DiMauro 01/19/2018 3:56 PM Jeremy Young and I surveyed the surrounding businesses to see the potential impact of the future shutdown for the water line install. At this time it appears that an after hours shutdown will be required. We will relay this information to the contractor.
Site Visit Complete 2/27/2018 at 2:15 PM 02/27/2018
PW-Misc
Informational
02/27/2018
John DiMauro 01/19/2018 3:56 PM Jeremy Young and I surveyed the surrounding businesses to see the potential impact of the future shutdown for the water line install. At this time it appears that an after hours shutdown will be required. We will relay this information to the contractor.
Fire Line Construction Inspection Partial 2/27/2018 at 1:50 PM 02/27/2018
Informational
02/27/2018
Jeremy Young 02/27/2018 3:28 PM The contractor installed the Fire Line Restraint inside the building. The contractor ran C900 pipe and tied it to DIP with Mega Lok Fittings. They ran tracer wire and tape over the line. They had 6" rock surrounding the pipe. They poured the thrust block with KCMMB 4K mix and are backfilling now.
Site Visit Partial 3/2/2018 at 8:30 AM 03/02/2018
Site Visit Partial 3/2/2018 at 11:10 AM 03/02/2018
Water - Material Verification Partial 4/30/2018 at 11:20 AM 04/30/2018
Informational
04/30/2018
Jeremy Young 04/30/2018 11:43 AM Contractor had the materials delivered. The pipe is C900, and manufactured within the last year. The fire hydrants are Waterous 250 with the WB67B label. The valves are AWWA C515 D16. The tracer wire is 12mil and the restrained joint pipe is CertaLok.
Water - Material Verification Partial 5/2/2018 at 8:15 AM 05/02/2018
Informational
05/02/2018
Jeremy Young 05/02/2018 2:38 PM Crew had material delivered that was incorrect. The Certa-Lock pipe was not of the correct pressure rating and was not C900. This has been corrected and the correct pipe is on site for the road crossing.
Water - Material Verification Partial 5/2/2018 at 8:15 AM 05/02/2018
Site Visit Partial 5/2/2018 at 1:40 PM 05/02/2018
PW-Misc
Informational
05/02/2018
Jeremy Young 05/02/2018 2:43 PM Crew has begun installing the water line on site. They have added approx 40' of line. They have added 2 tees and have wrapped them with 12 Mil Poly. They have at least 6" of rock surrounding the pipe and will backfill.
Site Visit Partial 5/2/2018 at 1:40 PM 05/02/2018
PW-Misc
Informational
05/02/2018
Jeremy Young 05/02/2018 2:43 PM Crew has begun installing the water line on site. They have added approx 40' of line. They have added 2 tees and have wrapped them with 12 Mil Poly. They have at least 6" of rock surrounding the pipe and will backfill.
Water Line - Construction Inspection Partial 5/7/2018 at 9:20 AM 05/07/2018
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
Water Line - Construction Inspection Partial 5/7/2018 at 11:25 AM 05/07/2018
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
Water Line - Construction Inspection Partial 5/7/2018 at 2:40 PM 05/07/2018
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
Water Line - Construction Inspection Partial 5/7/2018 at 2:40 PM 05/07/2018
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
Water Line - Construction Inspection Partial 5/9/2018 at 8:30 AM 05/09/2018
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/07/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
Water Line - Construction Inspection Partial 5/9/2018 at 10:45 AM 05/09/2018
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
Water Line - Construction Inspection Partial 5/9/2018 at 1:45 PM 05/09/2018
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
Water Line - Construction Inspection Partial 5/9/2018 at 1:45 PM 05/09/2018
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
Water Line - Construction Inspection Partial 5/10/2018 at 1:00 PM 05/10/2018
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/09/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/10/2018 2:09 PM Crew has added the fire line and the domestic water line to the building. They have installed the fire hydrant in the parking lot and poured the thrust block at the hydrant. They have sufficient rock surrounding the water line and they have wrapped the metal fittings with 12 mil poly wrap. They will backfill. The other crew is working on locating the utilities for the bore across the road.
Water Line - Construction Inspection Partial 5/16/2018 at 9:00 PM 05/16/2018
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
PW-Main inspection
Informational
05/10/2018
Jeremy Young 05/10/2018 2:09 PM Crew has added the fire line and the domestic water line to the building. They have installed the fire hydrant in the parking lot and poured the thrust block at the hydrant. They have sufficient rock surrounding the water line and they have wrapped the metal fittings with 12 mil poly wrap. They will backfill. The other crew is working on locating the utilities for the bore across the road.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/16/2018 10:32 PM John DiMauro and I were on site. We shut the 2 valves and the crew installed the tee for the new water line. They cut the existing DIP and placed the tee. They had the cookie placed into the end of the new connection. The metal fittings are covered in 12 mil poly wrap. They used Mega Lug connections and the bolts were coated. The line was put back into service and flushed for 45 mins per the flush chart. The crew placed rock under the new connection.
Water Line - Construction Inspection Partial 5/16/2018 at 9:00 PM 05/16/2018
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/10/2018 2:09 PM Crew has added the fire line and the domestic water line to the building. They have installed the fire hydrant in the parking lot and poured the thrust block at the hydrant. They have sufficient rock surrounding the water line and they have wrapped the metal fittings with 12 mil poly wrap. They will backfill. The other crew is working on locating the utilities for the bore across the road.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/16/2018 10:32 PM John DiMauro and I were on site. We shut the 2 valves and the crew installed the tee for the new water line. They cut the existing DIP and placed the tee. They had the cookie placed into the end of the new connection. The metal fittings are covered in 12 mil poly wrap. They used Mega Lug connections and the bolts were coated. The line was put back into service and flushed for 45 mins per the flush chart. The crew placed rock under the new connection.
Water Line - Construction Inspection Partial 5/17/2018 at 10:50 AM 05/17/2018
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 9:49 AM Crew is installing the water line. They have installed approx 80' of pipe. They have wrapped the couplers with 12 Mil. poly wrap and have the tracer wire present. They have added the marker tape. They will add the fire hydrants and pour the thrust blocks.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 11:46 AM Crew is installing water line for the site. They have added approx 60' more of water line. They have installed the tee for the hydrant assemblies. They will install the hydrants this afternoon. They have tracer wire and marker tape present.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/07/2018 3:43 PM John DiMauro and I were on site. The crew has installed the 2 fire hydrants and valves. They have the correct fittings and have poly wrapped the DIP and metal fittings. They have to adjust one of the fire hydrants for the grade.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 9:08 AM Contractor has had the BFP vault delivered and is working to place it in the ground.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 11:22 AM Crew is digging for the BFP vault. They will be placing the vault this afternoon. They have also added the rebar for the straddle block at the main and will pour the block and the thrust blocks this afternoon.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/09/2018 2:55 PM Crew has set the BFP vault and added the BFP in the vault. They have poured the thrust blocks and straddle blocks for the water main. They will continue.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/10/2018 2:09 PM Crew has added the fire line and the domestic water line to the building. They have installed the fire hydrant in the parking lot and poured the thrust block at the hydrant. They have sufficient rock surrounding the water line and they have wrapped the metal fittings with 12 mil poly wrap. They will backfill. The other crew is working on locating the utilities for the bore across the road.
PW-Main inspection
Informational
05/16/2018
Jeremy Young 05/16/2018 10:40 PM John DiMauro and I were on site. We shut the 2 valves and the crew installed the tee for the new water line. They cut the existing DIP and placed the tee. They had the cookie placed into the end of the new connection. The metal fittings are covered in 12 mil poly wrap. They used Mega Lug connections and the bolts were coated. The line was put back into service and flushed for 45 mins per the flush chart. The crew placed rock under the new connection.
PW-Main inspection
Informational
05/17/2018
Jeremy Young 05/17/2018 3:26 PM Contractor has poured the thrust block at the new tee. They have also poured the straddle block and grouted the holes in the BFP. The concrete was KCMMB 4K mix.
Water Line - Construction Inspection Partial 5/18/2018 at 9:30 AM 05/18/2018
Informational
05/18/2018
Jeremy Young 05/18/2018 1:44 PM Troy Thompson was there on my behalf. Crew was working on the water connection. They were setting up for testing.
Water Line - Construction Inspection Partial 5/18/2018 at 11:00 AM 05/21/2018
Informational
05/18/2018
Jeremy Young 05/18/2018 1:46 PM Troy Thompson was there on my behalf. The crew received the construction tap from the water department. They have begun the process of pressure testing the line.
Water Line - Construction Inspection Partial 5/18/2018 at 1:00 PM 05/21/2018
PW-Main inspection
Informational
05/21/2018
Contractor pressurized the water line for 2 hrs and the pressure test passed, contractor chlorinated the line and will check the levels on Monday Morning
Water Line - Hydrostatic Test Passed 5/18/2018 at 12:30 PM 05/21/2018
PW-Misc
Informational
05/21/2018
Jeremy Young 05/21/2018 10:46 AM Crew hydrostatic tested the 500' section of the new water line the test was ran for 2 hours and there was no drop in pressure. They also chlorinated and was above 25 mg/l.
Water Line - Construction Inspection Partial 5/21/2018 at 7:15 AM 05/21/2018
PW-Main inspection
Informational
05/21/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
Water Line - Coliform Test 1 Partial 5/22/2018 at 12:46 PM 05/22/2018
PW-Misc
Informational
05/22/2018
Jeremy Young 05/22/2018 2:05 PM Contractor has taken the 1st day samples. They were delivered to Blue Valley Labs. We will get the results.
Corrective Action Required
05/22/2018
Water Line - Coliform Test 2 Partial 5/23/2018 at 12:46 PM 05/23/2018
PW-Misc
Informational
05/23/2018
Jeremy Young 05/23/2018 2:27 PM Contractor was on site and the 2nd day water samples were pulled. I have run those to the lab for verification and we will wait the test results.
Water Line - Coliform Test 1 Passed 5/23/2018 at 1:00 PM 05/29/2018
PW-Misc
Informational
05/29/2018
Jeremy Young 05/29/2018 1:46 PM Contractor has passing bacteria testing for the first day. This is for the main line.
Water Line - Coliform Test 2 Passed 5/24/2018 at 1:00 PM 05/29/2018
PW-Misc
Informational
05/23/2018
Jeremy Young 05/23/2018 2:27 PM Contractor was on site and the 2nd day water samples were pulled. I have run those to the lab for verification and we will wait the test results.
PW-Misc
Informational
05/29/2018
Jeremy Young 05/29/2018 1:45 PM Water tests have been concluded for the main line. They have passing tests for the 2nd day testing.
Water Line - Construction Inspection Partial 6/1/2018 at 10:30 AM 06/01/2018
PW-Main inspection
Informational
05/21/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
PW-Main inspection
Informational
06/01/2018
Jeremy Young 06/01/2018 4:01 PM Contractor has chlorinated the water main between the main and BFP. They had at least 25ppm of chlorine. We will flush line on Monday.
Water Line - Construction Inspection Partial 6/4/2018 at 7:45 AM 06/04/2018
PW-Main inspection
Informational
06/01/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
PW-Main inspection
Informational
06/01/2018
Jeremy Young 06/01/2018 4:01 PM Contractor has chlorinated the water main between the main and BFP. They had at least 25ppm of chlorine. We will flush line on Monday.
PW-Main inspection
Informational
06/04/2018
Jeremy Young 06/04/2018 8:30 AM Contractor has flushed the line for approximately 20 mins. Which meets the standard flush table. The registered less than 10PPM prior to the flush. We will pull test tomorrow.
Water Line - Coliform Test 1 Partial 6/5/2018 at 9:30 AM 06/05/2018
PW-Misc
Informational
06/05/2018
Jeremy Young 06/05/2018 1:36 PM Crew was on site to pull water samples. We pulled samples and I took them to Blue Valley Labs for analysis.
Water Line - Coliform Test 2 Partial 6/6/2018 at 9:30 AM 06/06/2018
PW-Misc
Informational
06/06/2018
Jeremy Young 06/06/2018 11:36 AM Contractor has pulled day 2 samples for the BFP/Fire Line. Those were delivered to Blue Valley.
Water Line - Coliform Test 1 Passed 6/7/2018 at 9:40 AM 06/08/2018
PW-Misc
Informational
06/05/2018
Jeremy Young 06/05/2018 1:36 PM Crew was on site to pull water samples. We pulled samples and I took them to Blue Valley Labs for analysis.
PW-Misc
Informational
06/08/2018
Jeremy Young 06/08/2018 11:19 AM Day 1 samples came back good. They were absent for E. Coli and Coliform.
Water Line - Coliform Test 2 Passed 6/7/2018 at 9:40 AM 06/08/2018
PW-Misc
Informational
06/06/2018
Jeremy Young 06/06/2018 11:36 AM Contractor has pulled day 2 samples for the BFP/Fire Line. Those were delivered to Blue Valley.
PW-Misc
Informational
06/08/2018
Jeremy Young 06/08/2018 11:21 AM Day 2 samples were Absent for E. Coli and Coliform. They have passed the testing.
Water Line - Construction Inspection Partial 6/18/2018 at 8:20 AM 06/18/2018
PW-Main inspection
Informational
06/04/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
PW-Main inspection
Informational
06/04/2018
Jeremy Young 06/01/2018 4:01 PM Contractor has chlorinated the water main between the main and BFP. They had at least 25ppm of chlorine. We will flush line on Monday.
PW-Main inspection
Informational
06/04/2018
Jeremy Young 06/04/2018 8:30 AM Contractor has flushed the line for approximately 20 mins. Which meets the standard flush table. The registered less than 10PPM prior to the flush. We will pull test tomorrow.
PW-Main inspection
Informational
06/18/2018
Jeremy Young 06/18/2018 8:38 AM Contractor is backfilling the hole around the tee connection. They are rocking the valves and will backfill with dirt. They have flowable fill coming at 10L30 to make the street repairs.
Water Line - Construction Inspection Partial 6/25/2018 at 12:00 PM 06/25/2018
PW-Main inspection
Informational
06/18/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
PW-Main inspection
Informational
06/18/2018
Jeremy Young 06/01/2018 4:01 PM Contractor has chlorinated the water main between the main and BFP. They had at least 25ppm of chlorine. We will flush line on Monday.
PW-Main inspection
Informational
06/18/2018
Jeremy Young 06/04/2018 8:30 AM Contractor has flushed the line for approximately 20 mins. Which meets the standard flush table. The registered less than 10PPM prior to the flush. We will pull test tomorrow.
PW-Main inspection
Informational
06/18/2018
Jeremy Young 06/18/2018 8:38 AM Contractor is backfilling the hole around the tee connection. They are rocking the valves and will backfill with dirt. They have flowable fill coming at 10L30 to make the street repairs.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/25/2018 1:59 PM Crew has dug and added rock for the meter from the main. They have rock under the meter and have 10' of copper running from the meter. Water will come set the meter and tap the main tomorrow.
Water Line - Construction Inspection Passed 8/28/2018 08/28/2018
PW-Main inspection
Informational
06/25/2018
Jeremy Young 05/21/2018 10:49 AM Crew had chlorinated the line on Friday 5/18. The line had sat all weekend which is more than the 24hr period. We checked the chlorine level and it was above 10 mg/l. The line was flushed for 20 mins after. Testing will continue.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/01/2018 4:01 PM Contractor has chlorinated the water main between the main and BFP. They had at least 25ppm of chlorine. We will flush line on Monday.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/04/2018 8:30 AM Contractor has flushed the line for approximately 20 mins. Which meets the standard flush table. The registered less than 10PPM prior to the flush. We will pull test tomorrow.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/18/2018 8:38 AM Contractor is backfilling the hole around the tee connection. They are rocking the valves and will backfill with dirt. They have flowable fill coming at 10L30 to make the street repairs.
PW-Main inspection
Informational
06/25/2018
Jeremy Young 06/25/2018 1:59 PM Crew has dug and added rock for the meter from the main. They have rock under the meter and have 10' of copper running from the meter. Water will come set the meter and tap the main tomorrow.
Informational
08/28/2018
The water dept. did the tap and the copper was ran to the meter from the main and from the meter 10 feet out.
Site Visit Complete 10/08/2018
PW-Misc
Informational
05/02/2018
Jeremy Young 05/02/2018 2:43 PM Crew has begun installing the water line on site. They have added approx 40' of line. They have added 2 tees and have wrapped them with 12 Mil Poly. They have at least 6" of rock surrounding the pipe and will backfill.
Water - Material Verification Passed 10/08/2018
Water Line - Fire Hydrant Passed 10/08/2018
Water Line - Valve Passed 10/08/2018
Water Line - Construction Taps Removed Passed 10/08/2018
Grading/Excavation/Fill Inspection Passed 10/08/2018
Erosion Control Inspection Passed 10/08/2018
Water Line - Thrust Restraint Passed 11/13/2018
PW-Misc
Informational
02/27/2018
Jeremy Young 02/27/2018 3:19 PM Contractor installed 6" C900 pipe for fire line restraint. They also added DIP and covered it wil poly wrap 12 mil and clear as per city specs. They had at least 6" of rock covering the pipe and a tracer wire run into the building and will add water tape 18-24" below the finished grade. The contractor aslo poured the thrust block which was KCMMB 4K mix. The contractor is backfilling the trench.
Fire Line Construction Inspection Passed 11/13/2018
Miscellaneous PWORKS Inspection Partial 2/11/2019 at 1:00 PM 02/11/2019
Miscellaneous Correction
Corrective Action Required
02/11/2019
There is a leak by the fire hydrant on Lakewood Way on the west side of the road. Weers Construction has been contacted about it and they are planning on coming out this week to try and make a correction. Steve Robbins 02/11/2019 3:14 PM
Miscellaneous PWORKS Inspection Passed 2/14/2019 at 1:00 PM 05/03/2019
Miscellaneous Correction
Corrective Action Required
02/11/2019
There is a leak by the fire hydrant on Lakewood Way on the west side of the road. Weers Construction has been contacted about it and they are planning on coming out this week to try and make a correction. Steve Robbins 02/11/2019 3:14 PM
PW-Misc
Resolved
03/05/2019
The water line was dug up and the band that was put on by the tap was leaking. the contractors tightend up the bolts and the water dept. came out and thought everyhing looked good. The leak by the fire hydrant on Lakewood Way has now been corrected.Steve Robbins 03/05/2019 9:08 AM
Miscellaneous PWORKS Inspection Passed 4/24/2019 05/21/2019
Miscellaneous Correction
Corrective Action Required
03/05/2019
There is a leak by the fire hydrant on Lakewood Way on the west side of the road. Weers Construction has been contacted about it and they are planning on coming out this week to try and make a correction. Steve Robbins 02/11/2019 3:14 PM
Miscellaneous Correction
Resolved
05/21/2019
The leak has been repaired, the saddle needed to be tightened. The water Dept. came out and looked at it and said it appeared to be fine and not leaking.
Documents & Images
Date Uploaded File Type Document Name
12/21/2017 Receipt Receipt for transaction: 2017-007731
01/03/2018 Letter DE-Permit
01/19/2018 Letter DE-Daily Inspection Summary
02/27/2018 Letter DE-Daily Inspection Summary
02/27/2018 Letter DE-Daily Inspection Summary
04/30/2018 Letter DE-Daily Inspection Summary
05/02/2018 Letter DE-Daily Inspection Summary
05/07/2018 Letter DE-Daily Inspection Summary
05/07/2018 Letter DE-Daily Inspection Summary
05/07/2018 Letter DE-Daily Inspection Summary
05/09/2018 Letter DE-Daily Inspection Summary
05/09/2018 Letter DE-Daily Inspection Summary
05/09/2018 Letter DE-Daily Inspection Summary
05/09/2018 Letter DE-Daily Inspection Summary
05/10/2018 Letter DE-Daily Inspection Summary
05/16/2018 Letter DE-Daily Inspection Summary
05/17/2018 Letter DE-Daily Inspection Summary
05/18/2018 Letter DE-Daily Inspection Summary
05/21/2018 Letter DE-Daily Inspection Summary
05/22/2018 Letter DE-Daily Inspection Summary
05/23/2018 Letter DE-Daily Inspection Summary
05/29/2018 Letter DE-Daily Inspection Summary
05/29/2018 Coleman Water Main Water Test1
06/01/2018 Letter DE-Daily Inspection Summary
06/04/2018 Letter DE-Daily Inspection Summary
06/05/2018 Letter DE-Daily Inspection Summary
06/06/2018 Letter DE-Daily Inspection Summary
06/08/2018 Letter DE-Daily Inspection Summary
06/08/2018 Coleman Water Line BFP test results
06/18/2018 Letter DE-Daily Inspection Summary
06/25/2018 Letter DE-Daily Inspection Summary
06/28/2018 COLEMAN EQUIPTMENT WATERLINE 2018
08/28/2018 Letter DE-Daily Inspection Summary
10/15/2018 Letter DE-Punch List
10/16/2018 Letter DE-Certificate of Substantial Completion Multiple Lot
11/07/2018 Letter DE-Punch List
11/07/2018 Letter DE-Punch List
11/07/2018 Letter DE-Punch List
11/07/2018 Letter DE-Certificate of Substantial Completion Multiple Lot
11/08/2018 Coleman Equipment Water Main Extention
11/08/2018 Coleman Equipment Water Main Extention
11/08/2018 Coleman Equipment Water Main Extention
11/13/2018 Coleman Eqiupment Water Extention Substantial and Punch
11/08/2018 Coleman Equipment Water Main Extention
03/05/2019 Letter DE-Daily Inspection Summary
05/21/2019 Letter DE-Daily Inspection Summary
03/23/2023 Letter DE-Certificate of Final Acceptance (Commercial)
03/23/2023 Coleman Equipment Off- Site Public Water Main Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home