Permit Application Status

PRSUBD20236023


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20236023
Public Infrastructure
Issued
JEFFREY E SMITH INV CO LC
DEVELOPMENT COMPLETE
50 Unit Senior Living Wilshire Hills Public Infrastructure
11/14/2023
08/29/2024
Locations
Contacts
  
  
JEFFREY E SMITH INV CO LC, Address:PO BOX 7688  
James Marren, Address:206 Peach Way, Phone:(573) 540-0863  
River Russell, Address:206 Peach Way, Phone:(573) 999-5356  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Site Grading Fee $6,204.70 $6,204.70 Paid 05/28/2024
91100C8-Sanitary Sewer Insp Fees $1,015.89 $1,015.89 Paid 05/28/2024
91100C9-Water Insp Fee $5,523.14 $5,523.14 Paid 06/11/2024
9110081-Paved Surface Inspection Fee $16,706.26 $16,706.26 Paid 06/11/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/11/2024
9110072-Water Test Fee $400.00 $400.00 Paid 06/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary - Material Verification Pending
Sanitary Sewer - Air Test Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Water Line - Construction Inspection Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Misc
Informational
12/24/2024
Grading/Excavation/Fill Inspection Pending
Misc
Informational
12/24/2024
12-24-24 RH. Contractor was just on site filling around manholes on jobsite with flowable fill and normal fill.
ESC - (Vegetation/Ground Cover) Pending
Misc
Informational
01/25/2025
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Water Line - Coliform Test 1 Pending
Erosion Control Inspection Pending
Misc
Corrective Action Required
05/14/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems
Sanitary Sewer - Mandrel Pending 3/24/2025
Sanitary Sewer - Vacuum Pending 3/24/2025
Sanitary Sewer Construction Inspection Pending 3/31/2025
Site Visit Pending 6/3/2025
Misc
Informational
05/28/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter.
Sanitary Sewer Construction Inspection Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
9-13-24 DP. Crew is onsite still installing sewer. They are also running stubs from wyes. They are using tracer wire and sewer tape. They are also using flowable fill around sewer structures.
Storm Sewer Construction Inspection Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
9-13-24 DP. Crew poured 2 strom inverts, a ditch check and collars on the pipe. They also used flowable fill around the Strom structure.
Site Visit Partial 9/17/2024 9/17/2024 09/17/2024
Misc
Informational
09/17/2024
9-17-24 NS Site visited it appears that no work today.
Site Visit Partial 9/18/2024 09/18/2024
Misc
Informational
09/17/2024
9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done.
Erosion Control Inspection Partial 10/11/2024 10/14/2024
Misc
Corrective Action Required
10/14/2024
10-14-24 NS Gutter buddies need to be installed around construction site
Site Visit Partial 10/10/2024 10/14/2024
Misc
Informational
09/18/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today.
Erosion Control Inspection Partial 10/31/2024 10/31/2024
Misc
Corrective Action Required
10/14/2024
10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection
Erosion Control Inspection Partial 11/13/2024 11/13/2024
Misc
Corrective Action Required
10/31/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues
Site Visit Partial 11/20/2024 11/20/2024
Misc
Informational
10/14/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer
Site Visit Partial 11/21/2024 11/21/2024
Misc
Informational
11/20/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are working on sewer and they have the west side almost complete. I talked to the Forman about dead ends and that they need the inverts to be filled with concrete. incase they have a back up with sewer and it will properly drain.
Site Visit Partial 11/21/2024
Misc
Informational
11/21/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working
Site Visit Partial 11/26/2024 11/26/2024
Misc
Informational
11/21/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad
Erosion Control Inspection Partial 12/13/2024 12/13/2024
Misc
Corrective Action Required
11/13/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/13/2024 12/13/2024
Misc
Informational
12/13/2024
12-13-24 NS Site Visited and grass has stopped growing since it is winter.
Site Visit Partial 12/13/2024 12/13/2024
Misc
Informational
11/26/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday.
Storm Sewer Construction Inspection Partial 12/24/2024
Misc
Informational
12/24/2024
12-24-24 RH. The contractor was on site and prepping to cut into the existing storm drain inlet. However, the contractor will not start laying pipe until the 27th because the GPS company will not be able to provide locations until the 26th.
Grading/Excavation/Fill Inspection Partial 12/24/2024
Misc
Informational
12/24/2024
12-24-24 RH. Contractor was just on site filling around manholes on jobsite with flowable fill and normal fill.
Site Visit Partial 12/24/2024
Misc
Informational
12/13/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going.
Site Visit Partial 12/31/2024 12/31/2024
Misc
Informational
12/24/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street.
Erosion Control Inspection Partial 12/31/2024 12/31/2024
Misc
Corrective Action Required
12/13/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues
Erosion Control Inspection Partial 1/25/2025 01/25/2025
Misc
Corrective Action Required
12/31/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 1/25/2025 01/25/2025
Misc
Informational
12/13/2024
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 1/31/2025 01/31/2025
Misc
Corrective Action Required
01/25/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues
Site Visit Partial 1/31/2025 01/31/2025
Misc
Informational
12/31/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25
Erosion Control Inspection Partial 2/24/2025 02/24/2025
Misc
Corrective Action Required
01/31/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
Erosion Control Inspection Partial 2/28/2025 02/28/2025
Misc
Corrective Action Required
02/24/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues
Site Visit Partial 2/28/2025 02/28/2025
Misc
Informational
01/31/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 3-10-25 NS Site visited for a chlorin test and it appears that the water line is chlorinated and passed to do testing again.
Water Line - Hydrostatic Test Passed 03/10/2025
Misc
Informational
03/10/2025
3-6-25 NS Site visited for a hydro test and it appears that water line passed
Site Visit Partial 03/24/2025
Misc
Informational
02/28/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed
Erosion Control Inspection Partial 4/23/2025 04/24/2025
Misc
Corrective Action Required
02/28/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems
Erosion Control Inspection Partial 5/15/2025 05/14/2025
Misc
Corrective Action Required
04/24/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems
Site Visit Partial 5/15/2025 05/14/2025
Misc
Informational
03/24/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in.
Site Visit Partial 5/21/2025 05/21/2025
Misc
Informational
05/14/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment.
Site Visit Partial 5/27/2025 05/28/2025
Misc
Informational
05/21/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter.
Documents & Images
Date Uploaded File Type Document Name
05/03/2024 Plans Stamped Approved Plans Mass Grading_PL2023172
05/28/2024 Receipt Receipt for transaction:2024-003994
05/03/2024 Plans Stamped Approved Plans Streets and Storm_PL2023171
05/03/2024 Activity Document Fee Worksheet_PL2023172
05/03/2024 Activity Document Fee Worksheet_PL2023171
05/20/2024 Engineers Estimate Fee Worksheet WilshireHills Water Public_PL2023165
06/11/2024 Receipt Receipt_PRSUBD20236023
07/25/2024 Approved Plans Approved FDP Stamped Plan Set_PL2023163
08/29/2024 Letter DE-Permit
09/13/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/29/2024 Approved Plans Approved Utility Plan Sheet-Revised_PRSUBD20236023
10/31/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
01/25/2025 Letter INSPECTION SUMMARY
01/25/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home