Permit Application Status

PRSUBD20236023


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20236023
Public Infrastructure
Substantial Completion
JEFFREY E SMITH INV CO LC
DEVELOPMENT COMPLETE
50 Unit Senior Living Wilshire Hills Public Infrastructure
11/14/2023
08/29/2024
Locations
Contacts
  
  
JEFFREY E SMITH INV CO LC, Address:PO BOX 7688  
James Marren, Address:206 Peach Way, Phone:(573) 540-0863  
River Russell, Address:206 Peach Way, Phone:(573) 999-5356  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Record Drawing Review - Water Rejected 03/02/2026 03/03/2026
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
03/03/2026

Entire plan set is required for the Record Drawing. Please submit the entire set.
Engineering Record Drawing Review - Sanitary Rejected 03/02/2026 03/03/2026
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
03/03/2026

Entire plan set is required for the Record Drawing. Please submit the entire set.
Engineering Record Drawing Review - Street/Storm Rejected 03/02/2026 03/03/2026
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
03/03/2026

Entire plan set shall be submitted for the Record Drawings. Please submit the entire set.
Fees
Paid Fees Amount Paid Owing Date Paid
Site Grading Fee $6,204.70 $6,204.70 Paid 05/28/2024
Sanitary Sewer Insp Fees $1,015.89 $1,015.89 Paid 05/28/2024
Water Insp Fee $5,523.14 $5,523.14 Paid 06/11/2024
Paved Surface Inspection Fee $16,706.26 $16,706.26 Paid 06/11/2024
Right of Way Permit Fee $85.00 $85.00 Paid 06/11/2024
Water Test Fee $400.00 $400.00 Paid 06/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
ESC - (Vegetation/Ground Cover) Pending
Misc
Informational
10/22/2025
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 6-17-25 NS Site visited, and it appears that the developer needs to seed the area and put up erosion control around any large amounts of any pile of dirt.
Storm Sewer Construction Inspection Pending
Misc
Corrective Action Required
12/12/2025
6-17-25 NS Site visited, and it appears that storm water sewer is put in correctly but needs to be cleaned out and every storm box needs to have a clean area in the box. 11-5-25 NS Site visited and it appears storm water boxes still have not been cleaned out. 12-12-25 NS Site visited and it appears storm boxes still have not been cleaned out.
Erosion Control Inspection Pending
Misc
Informational
04/02/2026
Whilshire nursing home 10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time. 2-27-26 NS Site visited and observed ESV is in compliance. 3-10-26 NS Site visited and observed ESV is in Compliance at this time. 4-1-26 NS Site visited and observed ESV is in compliance at this time. 4-2-26 NS Site visited ESV appears to be in working condition after last night's rainstorm.
Site Visit Pending
Misc
Informational
04/03/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase. 3-31-26 NS No work or ESV issues at this time. 4-1-26 NS Site visited and it appears no work for EFI today. 4-2-26 NS Site visited and it appears that no work for EFI. 4-3-26 NS no work today.
Sanitary Sewer Construction Inspection Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
9-13-24 DP. Crew is onsite still installing sewer. They are also running stubs from wyes. They are using tracer wire and sewer tape. They are also using flowable fill around sewer structures.
Storm Sewer Construction Inspection Partial 9/13/2024 9/13/2024 09/13/2024
Misc
Informational
09/13/2024
9-13-24 DP. Crew poured 2 strom inverts, a ditch check and collars on the pipe. They also used flowable fill around the Strom structure.
Site Visit Partial 9/17/2024 9/17/2024 09/17/2024
Misc
Informational
09/17/2024
9-17-24 NS Site visited it appears that no work today.
Site Visit Partial 9/18/2024 09/18/2024
Misc
Informational
09/17/2024
9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done.
Erosion Control Inspection Partial 10/11/2024 10/14/2024
Misc
Corrective Action Required
10/14/2024
10-14-24 NS Gutter buddies need to be installed around construction site
Site Visit Partial 10/10/2024 10/14/2024
Misc
Informational
09/18/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today.
Erosion Control Inspection Partial 10/31/2024 10/31/2024
Misc
Corrective Action Required
10/14/2024
10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection
Erosion Control Inspection Partial 11/13/2024 11/13/2024
Misc
Corrective Action Required
10/31/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues
Site Visit Partial 11/20/2024 11/20/2024
Misc
Informational
10/14/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer
Site Visit Partial 11/21/2024 11/21/2024
Misc
Informational
11/20/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are working on sewer and they have the west side almost complete. I talked to the Forman about dead ends and that they need the inverts to be filled with concrete. incase they have a back up with sewer and it will properly drain.
Site Visit Partial 11/21/2024
Misc
Informational
11/21/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working
Site Visit Partial 11/26/2024 11/26/2024
Misc
Informational
11/21/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad
Erosion Control Inspection Partial 12/13/2024 12/13/2024
Misc
Corrective Action Required
11/13/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 12/13/2024 12/13/2024
Misc
Informational
12/13/2024
12-13-24 NS Site Visited and grass has stopped growing since it is winter.
Site Visit Partial 12/13/2024 12/13/2024
Misc
Informational
11/26/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday.
Storm Sewer Construction Inspection Partial 12/24/2024
Misc
Informational
12/24/2024
12-24-24 RH. The contractor was on site and prepping to cut into the existing storm drain inlet. However, the contractor will not start laying pipe until the 27th because the GPS company will not be able to provide locations until the 26th.
Grading/Excavation/Fill Inspection Partial 12/24/2024
Misc
Informational
12/24/2024
12-24-24 RH. Contractor was just on site filling around manholes on jobsite with flowable fill and normal fill.
Site Visit Partial 12/24/2024
Misc
Informational
12/13/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going.
Site Visit Partial 12/31/2024 12/31/2024
Misc
Informational
12/24/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street.
Erosion Control Inspection Partial 12/31/2024 12/31/2024
Misc
Corrective Action Required
12/13/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues
Erosion Control Inspection Partial 1/25/2025 01/25/2025
Misc
Corrective Action Required
12/31/2024
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 1/25/2025 01/25/2025
Misc
Informational
12/13/2024
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 1/31/2025 01/31/2025
Misc
Corrective Action Required
01/25/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues
Site Visit Partial 1/31/2025 01/31/2025
Misc
Informational
12/31/2024
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25
Erosion Control Inspection Partial 2/24/2025 02/24/2025
Misc
Corrective Action Required
01/31/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
Erosion Control Inspection Partial 2/28/2025 02/28/2025
Misc
Corrective Action Required
02/24/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues
Site Visit Partial 2/28/2025 02/28/2025
Misc
Informational
01/31/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 3-10-25 NS Site visited for a chlorin test and it appears that the water line is chlorinated and passed to do testing again.
Water Line - Hydrostatic Test Passed 03/10/2025
Misc
Informational
03/10/2025
3-6-25 NS Site visited for a hydro test and it appears that water line passed
Site Visit Partial 03/24/2025
Misc
Informational
02/28/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed
Erosion Control Inspection Partial 4/23/2025 04/24/2025
Misc
Corrective Action Required
02/28/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems
Erosion Control Inspection Partial 5/15/2025 05/14/2025
Misc
Corrective Action Required
04/24/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems
Site Visit Partial 5/15/2025 05/14/2025
Misc
Informational
03/24/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in.
Site Visit Partial 5/21/2025 05/21/2025
Misc
Informational
05/14/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment.
Site Visit Partial 5/27/2025 05/28/2025
Misc
Informational
05/21/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter.
Sanitary - Material Verification Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears sewer passed the mandrel test. Passed
Sanitary Sewer - Air Test Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears sewer air test passed in march.
Sanitary Sewer - Mandrel Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears that sewer has passed.
Sanitary Sewer - Vacuum Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, sewer has passed inspections
Pavement-Proof Roll Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and proof roll passed in March.
Pavement-Surface Partial 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, it appears that asphalt has been put in correctly. Passed
Pavement-Curb Construction Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears that curb has been installed correctly. Passed
Pavement-Stabilized Subgrade Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears it has been applied and the road is not sinking. passed
Water Line - Construction Inspection Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, water has been installed, and Back-T test came back negative. Passed
Pavement-Aggregate Base Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, correct rock has been put down. Passed
Pavement-Curb Construction Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears curbs have passed inspection at this time.
Pavement-Stabilized Subgrade Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears that it has been put down and passed.
Sanitary Sewer Construction Inspection Passed 6/16/2025 06/17/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, and it appears that sewer has been installed correctly. Passed
Storm Sewer Construction Inspection Partial 6/16/2025 06/17/2025
Misc
Informational
12/24/2024
6-17-25 NS Site visited, and it appears that storm water sewer is put in correctly but needs to be cleaned out and every storm box needs to have a clean area in the box.
Grading/Excavation/Fill Inspection Passed 6/16/2025 06/17/2025
Misc
Informational
12/24/2024
12-24-24 RH. Contractor was just on site filling around manholes on jobsite with flowable fill and normal fill. 6-17-25 NS Site visited, and it appears everything is complete and passed
ESC - (Vegetation/Ground Cover) Partial 6/16/2025 06/17/2025
Misc
Informational
01/25/2025
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 6-17-25 NS Site visited, and it appears that the developer needs to seed the area and put up erosion control around any large amounts of any pile of dirt.
Water Line - Coliform Test 1 Passed 6/16/2025 06/18/2025
Misc
Informational
06/18/2025
6-18-25 NS Site visited, water has passed.
Water Line - Hydrostatic Test Passed 6/18/2025 06/18/2025
Misc
Informational
06/18/2025
6-18-25 NS Site visited, passed
Sanitary Sewer - Air Test Passed 6/18/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, and it appears that all sewer test passed in February
Sanitary Sewer - Mandrel Passed 6/18/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, all sewer test passed in February
Sanitary Sewer - Vacuum Passed 6/18/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, and it appears that sewer test has passed in February
Sanitary Sewer - Camera Test Passed 6/18/2025 06/20/2025
Misc
Informational
06/20/2025
6-20-25 NS Site visited, water inspected it with a camera and passed it.
Water Line - Coliform Test 2 Passed 6/23/2025 06/23/2025
Misc
Informational
06/23/2025
6-23-25 NS Site visited, and it appears water has passed.
Water Line - Coliform Test 1 Passed 6/23/2025 06/23/2025
Misc
Informational
06/23/2025
6-23-25 NS Site visited, and it appears water has passed.
Pavement-Aggregate Base Passed 7/6/2025 07/07/2025
Misc
Informational
07/07/2025
7-7-25 NS base has been installed correctly. Passed
Pavement-Surface Passed 7/6/2025 07/07/2025
Misc
Informational
06/17/2025
6-17-25 NS Site visited, it appears that concrete has been put in correctly. Passed
Water Line - Coliform Test 2 Passed 7/6/2025 07/07/2025
Misc
Informational
07/07/2025
7-7-25 NS All water tests have passed
Erosion Control Inspection Partial 7/12/2025 07/22/2025
Misc
Corrective Action Required
05/14/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems 7-22-25 NS Site visited and it appears that jobsite has no problems
Erosion Control Inspection Partial 8/4/2025 08/05/2025
Misc
Corrective Action Required
07/22/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems 7-22-25 NS Site visited and it appears that jobsite has no problems 8-5-25 NS Site visited, and it appears that erosion control is correct. I would still like erosion control fence around the big dirt pile on jobsite.
Erosion Control Inspection Failed 8/19/2025 08/19/2025
Misc
Corrective Action Required
08/05/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems 7-22-25 NS Site visited and it appears that jobsite has no problems 8-5-25 NS Site visited, and it appears that erosion control is correct. I would still like erosion control fence around the big dirt pile on jobsite. 8-19-25 NS Site visited and it appears that erosion control is working properly. but fence still has not be installed at this moment around the dirt pile.
Erosion Control Inspection Failed 09/10/2025
Misc
Corrective Action Required
09/10/2025
9/10/25 Tyler S. Can not have tock in the roadway. Rock needs to be moved off road and behind erosion control.
Erosion Control Inspection Failed 9/11/2025 9/11/2025 09/11/2025
Misc
Corrective Action Required
09/10/2025
9/10/25 Tyler S. Can not have rock in the roadway. Rock needs to be moved off road and behind erosion control. 9/11/25 Tyler S. Failed erosion control. Rock is still in the road and more keeps getting dumped there. Need to remove it from the road. If not corrected in 2 days a work stop worder will be issued. 9/18/25 Tyler S. Failed erosion control. Dirt/mud cannot be spilling out into the roadway. At the entrance of construction site there needs to be rock. Also need to set erosion back up control after grading has been done (around sidewalk by the road).
Sidewalk Inspection Partial 9/19/2025 9/19/2025 09/12/2025
Misc
Corrective Action Required
09/12/2025
9/12/25 Tyler S. SW pre-pur inspecting was not called in and did not get done. I told them they need to have a pre -pour inspection done every time they are going to pour sidewalk. Also reminded them that they need to use white cure.
Site Visit Partial 7/10/2025 09/22/2025
Misc
Informational
05/28/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed.
ESC - (Vegetation/Ground Cover) Partial 10/21/2025 10/22/2025
Misc
Informational
06/17/2025
12-13-24 NS Site Visited and grass has stopped growing since it is winter. 1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 6-17-25 NS Site visited, and it appears that the developer needs to seed the area and put up erosion control around any large amounts of any pile of dirt.
Erosion Control Inspection Partial 10/27/2025 10/29/2025
Misc
Corrective Action Required
08/19/2025
Retirement home 10-14-24 NS Gutter buddies need to be installed around construction site 10-31-24 NS Site Visited and no work has been done since last inspection 11-6-24 NS Site Visited and still no erosion control issues 11-13-24 NS Site Visited and still no erosion control issues 12-13-24 NS Site Visited and still no erosion control issues 12-31-24 NS Site Visited and still no erosion control issues 1-10-25 NS Site Visited and still no erosion control issues 1-16-25 NS Site Visited and still no erosion control issues 1-24-25 NS Site Visited and still no erosion control issues 1-31-25 NS Site Visited and still no erosion control issues 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues 2-28-25 NS Site visited and it appears that no erosion control issues 3-6-25 NS Site visited and it appears that no erosion control issues 3-19-25 NS Site visited and saw fence down and the company went out while I was there. 4-3-25 NS Site visited and drove around jobsite and it appears that site does not have a problem. 4-16-25 NS Site visited and it appears concrete spilled and the crew is cleaning it up. 4-24-25 NS Site visited and it appears that jobsite has no problems 7-22-25 NS Site visited and it appears that jobsite has no problems 8-5-25 NS Site visited, and it appears that erosion control is correct. I would still like erosion control fence around the big dirt pile on jobsite. 8-19-25 NS Site visited and it appears that erosion control is working properly. but fence still has not be installed at this moment around the dirt pile. 10-29-25 NS Site visited and it appears that ECV is in compliance. Dirt could be cleaned up around road.
Erosion Control Inspection Partial 10/27/2025 10/29/2025
Misc
Informational
10/29/2025
9/10/25 Tyler S. Can not have rock in the roadway. Rock needs to be moved off road and behind erosion control. 9/11/25 Tyler S. Failed erosion control. Rock is still in the road and more keeps getting dumped there. Need to remove it from the road. If not corrected in 2 days a work stop worder will be issued. 9/18/25 Tyler S. Failed erosion control. Dirt/mud cannot be spilling out into the roadway. At the entrance of construction site there needs to be rock. Also need to set erosion back up control after grading has been done (around sidewalk by the road). 10-29-25 NS Site visited and it appears that ECV is in compliance.
Erosion Control Inspection Partial 10/27/2025 10/29/2025
Misc
Informational
10/29/2025
10-29-25 NS Site visited and it appears that ECV is in compliance.
Site Visit Partial 10/30/2025 10/31/2025
Misc
Informational
09/22/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on.
Storm Sewer Construction Inspection Partial 11/4/2025 11/05/2025
Misc
Corrective Action Required
06/20/2025
6-17-25 NS Site visited, and it appears that storm water sewer is put in correctly but needs to be cleaned out and every storm box needs to have a clean area in the box. 11-5-25 NS Site visited and it appears storm water boxes still have not been cleaned out.
Erosion Control Inspection Partial 11/11/2025 11/12/2025
Misc
Informational
10/29/2025
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance.
Install Street and Stop Signs Passed 12/12/2025 12/12/2025
Misc
Informational
12/12/2025
12-12-25 NS Site visited and it appears that signs are installed correctly from Public works
Sidewalk Inspection Passed 12/12/2025 12/12/2025
Misc
Corrective Action Required
09/12/2025
9/12/25 Tyler S. SW pre-pur inspecting was not called in and did not get done. I told them they need to have a pre -pour inspection done every time they are going to pour sidewalk. Also reminded them that they need to use white cure. 12-12-25 NS Site visited and it appears that sidewalk meet city standards. Passed
Storm Sewer Construction Inspection Partial 12/11/2025 12/12/2025
Misc
Corrective Action Required
11/05/2025
6-17-25 NS Site visited, and it appears that storm water sewer is put in correctly but needs to be cleaned out and every storm box needs to have a clean area in the box. 11-5-25 NS Site visited and it appears storm water boxes still have not been cleaned out. 12-12-25 NS Site visited and it appears storm boxes still have not been cleaned out.
Erosion Control Inspection Partial 1/7/2026 01/08/2026
Misc
Informational
11/12/2025
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property.
Erosion Control Inspection Partial 2/12/2026 02/13/2026
Misc
Informational
01/08/2026
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time.
Erosion Control Inspection Partial 2/26/2026 02/27/2026
Misc
Informational
02/13/2026
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time. 2-27-26 NS Site visited and observed ESV is in compliance.
Erosion Control Inspection Partial 3/9/2026 03/10/2026
Misc
Informational
02/27/2026
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time. 2-27-26 NS Site visited and observed ESV is in compliance. 3-10-26 NS Site visited and observed ESV is in Compliance at this time.
Site Visit Partial 3/19/2026 03/20/2026
Misc
Informational
10/31/2025
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time.
Site Visit Partial 3/22/2026 03/23/2026
Misc
Informational
03/20/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment.
Site Visit Partial 3/23/2026 03/24/2026
Misc
Informational
03/23/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today.
Site Visit Partial 3/23/2026 03/25/2026
Misc
Informational
03/24/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today.
Site Visit Partial 3/25/2026 03/26/2026
Misc
Informational
03/25/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today.
Site Visit Partial 3/29/2026 03/30/2026
Misc
Informational
03/26/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase.
Site Visit Partial 3/29/2026 03/31/2026
Misc
Informational
03/30/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase. 3-31-26 NS No work or ESV issues at this time.
Erosion Control Inspection Partial 3/30/2026 04/01/2026
Misc
Informational
03/10/2026
10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time. 2-27-26 NS Site visited and observed ESV is in compliance. 3-10-26 NS Site visited and observed ESV is in Compliance at this time. 4-1-26 NS Site visited and observed ESV is in compliance at this time.
Site Visit Partial 3/31/2026 04/01/2026
Misc
Informational
03/31/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase. 3-31-26 NS No work or ESV issues at this time. 4-1-26 NS Site visited and it appears no work for EFI today.
Erosion Control Inspection Partial 3/31/2026 04/02/2026
Misc
Informational
04/01/2026
Whilshire nursing home 10-29-25 NS Site visited and it appears that ECV is in compliance. 11-11-25 NS Site visited and ECV is in compliance 1-8-26 NS Site visited and it appears ECV needs to be fixed in problem areas around the property. 2-13-26 NS Site visited, Perimeter protection appears to be dressed up and maintained at this time. 2-27-26 NS Site visited and observed ESV is in compliance. 3-10-26 NS Site visited and observed ESV is in Compliance at this time. 4-1-26 NS Site visited and observed ESV is in compliance at this time. 4-2-26 NS Site visited ESV appears to be in working condition after last night's rainstorm.
Site Visit Partial 3/31/2026 04/02/2026
Misc
Informational
04/01/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase. 3-31-26 NS No work or ESV issues at this time. 4-1-26 NS Site visited and it appears no work for EFI today. 4-2-26 NS Site visited and it appears that no work for EFI.
Site Visit Partial 4/2/2026 04/03/2026
Misc
Informational
04/02/2026
Wilshire Hills plat 3 9-17-24 NS Site visited it appears that no work today. 9-18-24 NS Site visited no work is being done. 10-14-24 NS Site visited and ground work has started but no work being done today. 11-18-24 NS No work because of rain. 11-19-24 NS No work because of mud. 11-20-24 NS crews are working on sewer 11-21-24 NS Site visited crews are not working 11-25-24 NS Site visited work is being done on building pad 12-13-24 NS Site Visited and crews have been working on building. water/sewer will start on Monday. 12-24-24 RH. No one working on public infrastructure today. Just grading for the under slab of building was going. 12-31-24 NS Site visited it appears crews are working on storm water that is in the street. 1-31-25 NS Site visited crews are not working because of rain. will be doing testing on 2-3-25 2-28-25 NS Site visited and all water and sewer testing has passed 3-6-25 NS Site visited for a hydro test and it appears that water line passed 5-14-25 NS Site visited and it appears that road has been put in. 5-21-25 NS Site visited and it appears that the building is being framed at the moment. 5-28-25 NS Site visited and it appears that the building is being built. they are installing a 2 inch water meter. 9-22-25 NS Punch List items 1. All Sidewalks need to put in as plans say 2. Clean out all storm boxes 3. Clean up any dirt piles and debris around this location 4. all erosion control installed as of plans 5. Remove all blockades and cones from roads, including building materials 6. All gutter Buddies to be cleaned out with concrete blocks installed behind them 7. Sewer in barrel 11-277 need to be removed. 10-31-25 NS Site Visted and it appears that no work is going on. 3-20-26 NS no work at this time. 3-23-26 NS Site visited and no EFI work going on at the moment. 3-24-26 NS No EFI work for today. 3-25-26 NS No EFI work for today. 3-26-26 NS No work being done today. 3-30-26 NS no work being done today. No construction work is going on and from assuming none will be done until next phase. 3-31-26 NS No work or ESV issues at this time. 4-1-26 NS Site visited and it appears no work for EFI today. 4-2-26 NS Site visited and it appears that no work for EFI. 4-3-26 NS no work today.
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit