Permit Application Status

PRSUBD20211138


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20211138
Public Infrastructure
Final Acceptance
B M W COMMUNITIES INC
DEVELOPMENT COMPLETE
FULL SUBDIVISION INFRUSTRUCTURE
03/15/2021
04/14/2021
07/24/2023
Locations
Address
2771 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2767 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2763 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2759 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2772 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2768 SW 12TH TER, LEES SUMMIT, MO 64081

Address
2769 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2773 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2777 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2781 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2785 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2786 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2782 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2778 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2774 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2770 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2766 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2762 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2758 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2754 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2750 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2721 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2717 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2713 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2709 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2712 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2746 SW 12TH ST, LEES SUMMIT, MO 64081

Address
2755 SW 12TH TER, LEES SUMMIT, MO 64081

Property
260083

Property
260084

Property
260085

Property
260086

Property
260088

Property
260090

Property
260092

Property
260093

Property
260094

Property
260095

Property
260096

Property
260401

Property
260402

Property
260403

Property
260404

Property
260405

Property
260406

Property
260407

Property
260408

Property
260409

Property
260410

Property
260411

Property
260412

Property
260413

Property
260414

Property
260415

Property
260416

Property
260417

Property
260418

Address
2708 SW 12TH ST, LEES SUMMIT, MO 64081

Contacts
B M W COMMUNITIES INC, Address:16500 S STATE ROUTE 291  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
Kyle Jones, Address:40 SE 30th Street  
REDFORD CONSTRUCTION INC, Address:PO BOX 1065, Phone:(816) 540-2030  
  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $4,699.41 $4,699.41 Paid 03/26/2021
91100C9-Water Insp Fee $1,144.50 $1,144.50 Paid 03/26/2021
9110072-Water Test Fee $400.00 $400.00 Paid 03/26/2021
9110068-Storm Fee $8,153.80 $8,153.80 Paid 03/26/2021
9110081-Paved Surface Inspection Fee $8,494.87 $8,494.87 Paid 03/26/2021
9110071-Site Grading Fee $9,321.00 $9,321.00 Paid 03/26/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/26/2021
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $125.00 $0.00 $125.00 Not Paid


$125.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 5/4/2021 5/4/2021 05/04/2021
Misc
Informational
05/04/2021
Met on site for a pre-construction meeting. RP 5-4-21
Site Visit Partial 6/8/2021 6/8/2021 06/08/2021
Misc
Informational
05/04/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
06/08/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Sanitary - Material Verification Passed 7/2/2021 7/2/2021 07/02/2021
Misc
Informational
07/02/2021
Manholes were manufactured by Barbour Concrete. They used ML-13-NR steps. SDR 26 sanitary pipe was manufactured by National. Manhole castings are EJ 1502 with the correct stamps on top. RP 7-2-21
Site Visit Partial 6/10/2021 6/10/2021 07/09/2021
Misc
Informational
06/08/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
06/08/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
07/09/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Site Visit Partial 7/12/2021 7/12/2021 07/12/2021
Misc
Informational
07/09/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
07/09/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
07/09/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
07/12/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Sanitary Sewer Construction Inspection Partial 7/13/2021 7/13/2021 07/13/2021
Misc
Informational
07/13/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Sanitary Sewer Construction Inspection Partial 7/14/2021 7/14/2021 07/16/2021
Misc
Informational
07/13/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/15/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/16/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/16/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/16/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Sanitary Sewer Construction Inspection Partial 7/19/2021 7/19/2021 07/19/2021
Misc
Informational
07/16/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/16/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/16/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/16/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/16/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/19/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Sanitary Sewer Construction Inspection Partial 7/20/2021 07/20/2021
Misc
Informational
07/19/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/19/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/19/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/19/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/19/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/19/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/20/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Sanitary Sewer Construction Inspection Partial 7/21/2021 7/21/2021 07/21/2021
Misc
Informational
07/20/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/20/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/20/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/20/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/20/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/20/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/20/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/21/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Sanitary Sewer Construction Inspection Partial 7/22/2021 7/22/2021 07/22/2021
Misc
Informational
07/21/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/21/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/21/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/21/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/21/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/21/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/21/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/21/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/22/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Sanitary Sewer Construction Inspection Partial 7/23/2021 7/23/2021 07/23/2021
Misc
Informational
07/22/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/22/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/22/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/22/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/22/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/22/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/22/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/22/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/22/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/23/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Sanitary Sewer Construction Inspection Partial 7/26/2021 7/26/2021 07/26/2021
Misc
Informational
07/23/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/23/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/23/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/23/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/23/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/23/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/23/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/23/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/23/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/23/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/26/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Sanitary Sewer Construction Inspection Partial 7/27/2021 7/27/2021 07/27/2021
Misc
Informational
07/26/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/26/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/26/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/26/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/26/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/26/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/26/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/26/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/26/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/26/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/26/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
07/27/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Sanitary Sewer Construction Inspection Partial 7/28/2021 7/28/2021 07/28/2021
Misc
Informational
07/27/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/27/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/27/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/27/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/27/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/27/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/27/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/27/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/27/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/27/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/27/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
07/27/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
07/28/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Sanitary Sewer Construction Inspection Partial 7/29/2021 7/29/2021 07/30/2021
Misc
Informational
07/28/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/28/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/28/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/28/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/28/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/28/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/28/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/28/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/28/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/28/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/28/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
07/28/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
07/28/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
07/30/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Sanitary Sewer Construction Inspection Partial 7/30/2021 7/30/2021 07/30/2021
Misc
Informational
07/30/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/30/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/30/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/30/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/30/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/30/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/30/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/30/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/30/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/30/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/30/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
07/30/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
07/30/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
07/30/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
07/30/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Sanitary Sewer Construction Inspection Partial 8/2/2021 8/2/2021 08/02/2021
Misc
Informational
07/30/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
07/30/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/30/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
07/30/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
07/30/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
07/30/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
07/30/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
07/30/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
07/30/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
07/30/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
07/30/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
07/30/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
07/30/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
07/30/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
07/30/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/02/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Sanitary Sewer Construction Inspection Partial 8/3/2021 8/3/2021 08/03/2021
Misc
Informational
08/02/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/02/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/02/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/02/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/02/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/02/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/02/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/02/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/02/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/02/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/02/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/02/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/02/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/02/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/02/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/02/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/03/2021
Cityview training with Tom Taylor. RP 8-3-21
Sanitary Sewer Construction Inspection Partial 8/3/2021 8/3/2021 08/03/2021
Misc
Informational
08/03/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/03/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/03/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/03/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/03/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/03/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/03/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/03/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/03/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/03/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/03/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/03/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/03/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/03/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/03/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/03/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/03/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/03/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Sanitary Sewer Construction Inspection Partial 8/4/2021 8/4/2021 08/04/2021
Misc
Informational
08/03/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/03/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/03/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/03/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/03/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/03/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/03/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/03/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/03/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/03/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/03/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/03/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/03/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/03/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/03/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/03/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/03/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/03/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/04/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Sanitary Sewer Construction Inspection Partial 8/5/2021 8/5/2021 08/05/2021
Misc
Informational
08/04/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/04/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/04/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/04/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/04/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/04/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/04/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/04/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/04/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/04/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/04/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/04/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/04/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/04/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/04/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/04/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/04/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/04/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/04/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/05/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Sanitary Sewer Construction Inspection Partial 8/6/2021 8/6/2021 08/06/2021
Misc
Informational
08/05/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/05/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/05/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/05/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/05/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/05/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/05/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/05/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/05/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/05/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/05/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/05/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/05/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/05/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/05/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/05/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/05/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/05/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/05/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/05/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/06/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Storm Sewer Construction Inspection Partial 8/9/2021 8/9/2021 08/09/2021
Misc
Informational
08/09/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Storm Sewer Construction Inspection Partial 8/11/2021 8/11/2021 08/11/2021
Misc
Informational
08/09/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/11/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Storm Sewer Construction Inspection Partial 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/11/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/11/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/12/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Storm Sewer Construction Inspection Partial 8/16/2021 8/16/2021 08/16/2021
Misc
Informational
08/12/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/12/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/12/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/16/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Storm Sewer Construction Inspection Partial 8/17/2021 8/17/2021 08/17/2021
Misc
Informational
08/16/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/16/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/16/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/16/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/17/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Sanitary Sewer Construction Inspection Partial 8/18/2021 8/18/2021 08/18/2021
Misc
Informational
08/06/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/06/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/06/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/06/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/06/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/06/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/06/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/06/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/06/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/06/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/06/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/06/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/06/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/06/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/06/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/06/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/06/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/06/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/06/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/06/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/06/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Misc
Informational
08/18/2021
Jarrod’s crew laid 300 feet of sanitary pipe and set MH 5-A4. RP 8-18-21
Sanitary Sewer Construction Inspection Partial 8/19/2021 8/19/2021 08/19/2021
Misc
Informational
08/18/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/18/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/18/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/18/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/18/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/18/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/18/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/18/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/18/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/18/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/18/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/18/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/18/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/18/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/18/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/18/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/18/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/18/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/18/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/18/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/18/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Misc
Informational
08/18/2021
Jarrod’s crew laid 300 feet of sanitary pipe and set MH 5-A4. RP 8-18-21
Misc
Informational
08/19/2021
They laid 50 feet of sanitary pipe and service laterals for lots 159, 158, 157 and 156. They also set MH 5-A5. RP 8-19-21
Storm Sewer Construction Inspection Partial 8/18/2021 8/18/2021 08/19/2021
Misc
Informational
08/17/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/17/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/17/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/17/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/17/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/19/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Sanitary Sewer Construction Inspection Partial 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/19/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/19/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/19/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/19/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/19/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/19/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/19/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/19/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/19/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/19/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/19/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/19/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/19/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/19/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/19/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/19/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/19/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/19/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/19/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/19/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/19/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Misc
Informational
08/19/2021
Jarrod’s crew laid 300 feet of sanitary pipe and set MH 5-A4. RP 8-18-21
Misc
Informational
08/19/2021
They laid 50 feet of sanitary pipe and service laterals for lots 159, 158, 157 and 156. They also set MH 5-A5. RP 8-19-21
Misc
Informational
08/20/2021
They laid service lateral for lot 155. All that remains is compaction testing to start the 30 day clock. RP 8-20-21
Storm Sewer Construction Inspection Partial 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/19/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/19/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/19/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/19/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/19/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/19/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/20/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Storm Sewer Construction Inspection Partial 8/23/2021 8/23/2021 08/23/2021
Misc
Informational
08/20/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/20/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/20/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/20/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/20/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/20/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/20/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/23/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Sanitary Sewer Construction Inspection Partial 8/23/2021 8/23/2021 08/23/2021
Misc
Informational
08/20/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/20/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/20/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/20/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/20/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/20/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/20/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/20/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/20/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/20/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/20/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/20/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/20/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/20/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/20/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/20/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/20/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/20/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/20/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/20/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/20/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Misc
Informational
08/20/2021
Jarrod’s crew laid 300 feet of sanitary pipe and set MH 5-A4. RP 8-18-21
Misc
Informational
08/20/2021
They laid 50 feet of sanitary pipe and service laterals for lots 159, 158, 157 and 156. They also set MH 5-A5. RP 8-19-21
Misc
Informational
08/20/2021
They laid service lateral for lot 155. All that remains is compaction testing to start the 30 day clock. RP 8-20-21
Misc
Informational
08/23/2021
KC Testing was on site doing compaction testing on the last of line 5-A. RP 8-23-21
Storm Sewer Construction Inspection Partial 8/24/2021 8/24/2021 08/24/2021
Misc
Informational
08/23/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/23/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/23/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/23/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/23/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/23/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/23/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/23/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
08/24/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Storm Sewer Construction Inspection Partial 8/25/2021 8/25/2021 08/25/2021
Misc
Informational
08/24/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/24/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/24/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/24/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/24/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/24/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/24/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/24/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
08/24/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
08/25/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Storm Sewer Construction Inspection Partial 8/26/2021 8/26/2021 08/26/2021
Misc
Informational
08/25/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/25/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/25/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/25/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/25/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/25/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/25/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/25/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
08/25/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
08/25/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
08/26/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Storm Sewer Construction Inspection Partial 8/27/2021 8/27/2021 08/27/2021
Misc
Informational
08/26/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/26/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/26/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/26/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/26/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/26/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/26/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/26/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
08/26/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
08/26/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
08/26/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
08/27/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Water Line - Construction Inspection Partial 9/2/2021 9/2/2021 09/02/2021
Misc
Informational
09/02/2021
They cut into the existing water main and lowered the section required to place the storm line. Checked with the water dept and the said we have to chlorinate and take Bac T samples, but didn’t need to pressure test the line. RP 9-2-21
Storm Sewer Construction Inspection Partial 9/13/2021 9/13/2021 09/13/2021
Misc
Informational
08/27/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
08/27/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
08/27/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
08/27/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
08/27/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
08/27/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
08/27/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
08/27/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
08/27/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
08/27/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
08/27/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
08/27/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Misc
Informational
09/13/2021
They laid 55 feet of 54 inch HP storm pipe and set dentition basin outlet control structure 205. RP 9-13-21
Storm Sewer Construction Inspection Partial 9/14/2021 9/14/2021 09/14/2021
Misc
Informational
09/13/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
09/13/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
09/13/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
09/13/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
09/13/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
09/13/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
09/13/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
09/13/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
09/13/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
09/13/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
09/13/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
09/13/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Misc
Informational
09/13/2021
They laid 55 feet of 54 inch HP storm pipe and set dentition basin outlet control structure 205. RP 9-13-21
Misc
Informational
09/14/2021
They poured collars and inverts today. RP 9-14-21
Storm Sewer Construction Inspection Partial 9/16/2021 9/16/2021 09/16/2021
Misc
Informational
09/14/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
09/14/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
09/14/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
09/14/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
09/14/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
09/14/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
09/14/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
09/14/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
09/14/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
09/14/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
09/14/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
09/14/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Misc
Informational
09/14/2021
They laid 55 feet of 54 inch HP storm pipe and set dentition basin outlet control structure 205. RP 9-13-21
Misc
Informational
09/14/2021
They poured collars and inverts today. RP 9-14-21
Misc
Informational
09/16/2021
They laid 60 feet of 36 inch HP storm pipe and set junction box 402. RP 9-16-21
Site Visit Partial 9/16/2021 9/16/2021 09/16/2021
Misc
Informational
07/12/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
07/12/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
07/12/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
07/12/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
09/16/2021
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Site Visit Partial 9/17/2021 9/17/2021 09/17/2021
Misc
Informational
09/16/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
09/16/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
09/16/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
09/16/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
09/16/2021
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
09/17/2021
They just cleaned up the job site for the weekend. RP 9-17-21
Storm Sewer Construction Inspection Partial 9/17/2021 9/20/2021 09/20/2021
Misc
Informational
09/16/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
09/16/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
09/16/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
09/16/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
09/16/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
09/16/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
09/16/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
09/16/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
09/16/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
09/16/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
09/16/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
09/16/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Misc
Informational
09/16/2021
They laid 55 feet of 54 inch HP storm pipe and set dentition basin outlet control structure 205. RP 9-13-21
Misc
Informational
09/16/2021
They poured collars and inverts today. RP 9-14-21
Misc
Informational
09/16/2021
They laid 60 feet of 36 inch HP storm pipe and set junction box 402. RP 9-16-21
Misc
Informational
09/20/2021
Redford is pourig the toe-walls for the storm pipe going into the detention basin.
Site Visit Partial 9/24/2021 09/24/2021
Misc
Informational
09/17/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
09/17/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
09/17/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
09/17/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
09/17/2021
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
09/17/2021
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
09/24/2021
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Water Line - Construction Inspection Partial 9/24/2021 09/24/2021
Misc
Informational
09/02/2021
They cut into the existing water main and lowered the section required to place the storm line. Checked with the water dept and the said we have to chlorinate and take Bac T samples, but didn’t need to pressure test the line. RP 9-2-21
Misc
Informational
09/24/2021
All 3 road crossings have been installed. Daniel chlorinated the existing water line where the water had to be relocated to go under the new storm. They will flush and de-chlorinate on saturday and take samples on monday.
Sanitary Sewer - Air Test Passed 9/29/2021 9/29/2021 09/29/2021
Misc
Informational
09/29/2021
All sanitary lines passed their air test. RP 9-29-21
Sanitary Sewer - Vacuum Passed 9/29/2021 9/29/2021 10/14/2021
Misc
Corrective Action Required
09/29/2021
All manholes except 5-A4 passed their vacuum test. They replaced a busted ring on 5-A4, but it still failed. They water plugged the manhole and we will retest it on Friday. RP 9-29-21 On Friday 10/8/2021 MH5-A4 passed the vacuum test DJ
Sanitary Sewer - Vacuum Passed 10/1/2021 10/1/2021 10/14/2021
Misc
Corrective Action Required
09/29/2021
All manholes except 5-A4 passed their vacuum test. They replaced a busted ring on 5-A4, but it still failed. They water plugged the manhole and we will retest it on Friday. RP 9-29-21 Friday 10-08-21 MH 5-A4 Passed vacuum test.
Misc
Corrective Action Required
10/11/2021
All manholes passed their vacuum testing. RP 10-14-21
Sanitary Sewer - Mandrel Passed 10/18/2021 10/18/2021 10/19/2021
Misc
Informational
10/19/2021
The mandrel passed through all sanitary lines. RP 10-18-21
Pavement-Stabilized Subgrade Partial 10/25/2021 10/25/2021 10/27/2021
Misc
Informational
10/27/2021
Laid down portland cement dust, tilled in 8” into subgrade then bladed and rolled mixture into subgrade. KC testing was onsite doing compaction testing. 10/26 ES
Pavement-Proof Roll Partial 11/3/2021 11/3/2021 11/03/2021
Misc
Informational
11/03/2021
They had a tandem dump truck with a 20.9 ton load. There were some areas that failed the proof roll. Mostly around storm boxes and a large area on 11th street. We marked all the areas that needed to be reworked. Jason said they would remove the questionable sub-grade and add extra rock. He also plans on doing that around all the sanitary manholes located in the roadway. RP 11-3-21
Pavement-Aggregate Base Partial 11/4/2021 11/4/2021 11/06/2021
Misc
Informational
11/06/2021
They put down 3,500 tons of MODOT Type 5 for the sub-grade on the roadways. RP 11-4-21
Pavement-Aggregate Base Partial 11/5/2021 11/5/2021 11/06/2021
Misc
Informational
11/06/2021
They put down 3,500 tons of MODOT Type 5 for the sub-grade on the roadways. RP 11-4-21
Misc
Informational
11/06/2021
They put down another 2,600 tons of MODOT Type 5 for the sub-grade on the roadways. RP 11-5-21
Pavement-Proof Roll Partial 11/11/2021 11/11/2021 11/11/2021
Misc
Informational
11/03/2021
They had a tandem dump truck with a 20.9 ton load. There were some areas that failed the proof roll. Mostly around storm boxes and a large area on 11th street. We marked all the areas that needed to be reworked. Jason said they would remove the questionable sub-grade and add extra rock. He also plans on doing that around all the sanitary manholes located in the roadway. RP 11-3-21
Misc
Informational
11/11/2021
They had a tandem dump truck with 20 ton load. There was just 2 areas that didn’t pass the proof roll for the curbs and needed more work. JK Concrete said they would wait till Monday to pour curbs due to weather also. RP 11-11-21
Pavement-Curb Construction Partial 11/15/2021 11/15/2021 11/15/2021
Misc
Informational
11/15/2021
JK Concrete laid 250 cubic yards of 4K KCMMB mix for curbing. KC Testing was on site doing concrete testing and making test cylinders. 11-15-21
Pavement-Curb Construction Partial 11/16/2021 11/16/2021 11/16/2021
Misc
Informational
11/15/2021
JK Concrete laid 250 cubic yards of 4K KCMMB mix for curbing. KC Testing was on site doing concrete testing and making test cylinders. 11-15-21
Misc
Informational
11/16/2021
JK Concrete laid another 290 cubic yards of 4K KCMMB mix for the curbs. All the have left remaining is the curb inlets for storm structures. RP 11-16-21
Pavement-Curb Construction Partial 11/17/2021 11/17/2021 11/17/2021
Misc
Informational
11/16/2021
JK Concrete laid 250 cubic yards of 4K KCMMB mix for curbing. KC Testing was on site doing concrete testing and making test cylinders. 11-15-21
Misc
Informational
11/16/2021
JK Concrete laid another 290 cubic yards of 4K KCMMB mix for the curbs. All the have left remaining is the curb inlets for storm structures. RP 11-16-21
Misc
Informational
11/17/2021
JK Concrete formed and poured 12 curb inlets and 2 islands in the roadway. RP 11-17-21
Pavement-Curb Construction Partial 11/18/2021 11/18/2021 11/19/2021
Misc
Informational
11/17/2021
JK Concrete laid 250 cubic yards of 4K KCMMB mix for curbing. KC Testing was on site doing concrete testing and making test cylinders. 11-15-21
Misc
Informational
11/17/2021
JK Concrete laid another 290 cubic yards of 4K KCMMB mix for the curbs. All the have left remaining is the curb inlets for storm structures. RP 11-16-21
Misc
Informational
11/17/2021
JK Concrete formed and poured 12 curb inlets and 2 islands in the roadway. RP 11-17-21
Misc
Informational
11/19/2021
JK Concrete formed and poured the remaining remaining curb inlets and island. RP 11-19-21
Pavement-Proof Roll Partial 11/22/2021 11/22/2021 11/22/2021
Misc
Informational
11/11/2021
They had a tandem dump truck with a 20.9 ton load. There were some areas that failed the proof roll. Mostly around storm boxes and a large area on 11th street. We marked all the areas that needed to be reworked. Jason said they would remove the questionable sub-grade and add extra rock. He also plans on doing that around all the sanitary manholes located in the roadway. RP 11-3-21
Misc
Informational
11/11/2021
They had a tandem dump truck with 20 ton load. There was just 2 areas that didn’t pass the proof roll for the curbs and needed more work. JK Concrete said they would wait till Monday to pour curbs due to weather also. RP 11-11-21
Misc
Informational
11/22/2021
They had a tandem dump truck with a 19.33 ton load. We had just 2 very small areas at the end of roadways that had some deflection. Brian from Randy Spalding is going to rework those areas. Superior Bowen is planning on laying down base asphalt tomorrow. RP 11-22-21
Pavement-Surface Partial 11/23/2021 11/23/2021 11/24/2021
Misc
Informational
11/24/2021
Superior Bowen laid 2,014 tons of APWA Type 5 R for base. CMTG was on site for testing. RP 11-23-21
Pavement-Surface Partial 11/24/2021 11/24/2021 11/29/2021
Misc
Informational
11/24/2021
Superior Bowen laid 2,014 tons of APWA Type 5 R for base. CMTG was on site for testing. RP 11-23-21
Misc
Informational
11/29/2021
Superior Bowen laid 1,427 tons of APWA Type 5 R asphalt for the base. RP 11-24-21
Pavement-Surface Partial 11/29/2021 11/29/2021 11/30/2021
Misc
Informational
11/29/2021
Superior Bowen laid 2,014 tons of APWA Type 5 R for base. CMTG was on site for testing. RP 11-23-21
Misc
Informational
11/29/2021
Superior Bowen laid 1,427 tons of APWA Type 5 R asphalt for the base. RP 11-24-21
Misc
Informational
11/30/2021
Superior Bowen laid 842 tons of APWA Type 5 V asphalt for roadway surface. RP 11-29-21
Pavement-Surface Partial 12/1/2021 12/1/2021 12/01/2021
Misc
Informational
11/30/2021
Superior Bowen laid 2,014 tons of APWA Type 5 R for base. CMTG was on site for testing. RP 11-23-21
Misc
Informational
11/30/2021
Superior Bowen laid 1,427 tons of APWA Type 5 R asphalt for the base. RP 11-24-21
Misc
Informational
11/30/2021
Superior Bowen laid 842 tons of APWA Type 5 V asphalt for roadway surface. RP 11-29-21
Misc
Informational
12/01/2021
Superior Bowen laid 776 tons of APWA Type 5 V asphalt for the surface. RP 12-1-21
Water - Material Verification Passed 12/2/2021 12/2/2021 12/02/2021
Misc
Informational
12/02/2021
All the fittings, sleeves, gate valves and fire hydrants are epoxy coated. Gate valves and fire hydrants were manufactured by Mueller and meet our approved products list. RP 12-2-21
Water Line - Hydrostatic Test Passed 12/17/2021 12/17/2021 12/18/2021
Misc
Informational
12/18/2021
water main held over 150 psi for 2 hours. RP 12-17-21
Water Line - Coliform Test 1 Partial 12/17/2021 12/17/2021 12/18/2021
Misc
Informational
12/18/2021
Daniel and Jarrod chlorinated the water line. We will let it set until Monday. RP 12-18-21
Storm Sewer Construction Inspection Passed 9/22/2021 12/18/2021
Misc
Informational
09/20/2021
Installed structure 200, 201. The end structure on 201 was installed. Pipe is being laid toward strucure 202.
Misc
Informational
09/20/2021
they laid 100 feet of 54 inch RCP pipe. They also set junction box 202 and curb inlet 203. They need to move the water main before they can connect to curb inlet 204. RP 8-11-21
Misc
Informational
09/20/2021
They poured collars for storm structures 200, 201, 202 and 203, then back filled all storm lines. RP 8-12-21
Misc
Informational
09/20/2021
They laid 275 feet of 18 inch HDPE storm pipe and set curb inlets 302, 303 and junction box 304. Plans don’t call for a 301 structure. RP 8-16-21
Misc
Informational
09/20/2021
They laid 120 feet of 18 inch HDPE storm pipe. They also set field inlet 305. RP 8-17-21
Misc
Informational
09/20/2021
They laid 85 feet of HDPE storm pipe and set field inlet 306. RP 8-19-21
Misc
Informational
09/20/2021
They laid 60 feet of 15 inch HDPE storm pipe and 80 feet of 30 inch HP storm pipe. Plans call for 30 inch RCP, but the crew informed me that it was changed. Sent an email to Steve and Sue asking about the changes. RP 8-20-21
Misc
Informational
09/20/2021
They laid 30 feet of 30 inch HP storm pipe and 130 feet of HDPE storm pipe. They also set curb inlet 100A and field inlet 100B. Waiting on a letter from the engineer to approve the material change from RCP to HP storm pipe. RP 8-23-21
Misc
Informational
09/20/2021
They laid 162 feet of 24 inch HDPE storm pipe, 35 feet of 24 inch HP storm pipe and 105 feet of 15 inch HDPE storm pipe. They also set curb inlets 101 and 102, plus junction box 103. RP 8-24-21
Misc
Informational
09/20/2021
They laid 245 feet of 15 inch HDPE storm pipe and 42 feet of 15 inch HP storm pipe. They also set curb inlets 102.1, 104 and 105. They poured inverts for junction boxes 203 and 103 along with collars. RP 8-25-21
Misc
Informational
09/20/2021
They poured the rest of the inverts and collars today. Plans were approved to lower the water line for the last storm structure remaining to be installed. RP 8-26-21
Misc
Corrective Action Required
09/20/2021
Surveyors from Anderson Engineering miss marked survey stakes for curb inlets and junction boxes. They are reshooting everything and will submit recommendations on how to fix the problem of structure locations. RP 8-27-21
Misc
Informational
09/20/2021
They laid 55 feet of 54 inch HP storm pipe and set dentition basin outlet control structure 205. RP 9-13-21
Misc
Informational
09/20/2021
They poured collars and inverts today. RP 9-14-21
Misc
Informational
09/20/2021
They laid 60 feet of 36 inch HP storm pipe and set junction box 402. RP 9-16-21
Misc
Informational
09/20/2021
Redford is pourig the toe-walls for the storm pipe going into the detention basin.
Water Line - Coliform Test 1 Partial 12/20/2021 12/20/2021 12/21/2021
Misc
Informational
12/21/2021
Dechlorinated the water line. RP 12-20-21
Water Line - Coliform Test 1 Partial 12/21/2021 12/21/2021 12/21/2021
Misc
Informational
12/21/2021
Dechlorinated the water line. RP 12-20-21
Misc
Informational
12/21/2021
Pulled first samples for Bac T testing and delivered them to Keystone Laboratories for testing. RP 12-21-21
Water Line - Coliform Test 2 Partial 12/22/2021 12/22/2021 12/22/2021
Misc
Informational
12/22/2021
Pulled second samples for Bac T and delivered them to Keystone Laboratories for testing. Still waiting to hear back on the results from the first samples. RP 12-22-21
Water Line - Coliform Test 1 Partial 12/22/2021 12/22/2021 12/23/2021
Misc
Informational
12/21/2021
Dechlorinated the water line. RP 12-20-21
Misc
Informational
12/21/2021
Pulled first samples for Bac T testing and delivered them to Keystone Laboratories for testing. RP 12-21-21
Misc
Informational
12/23/2021
First samples passed testing by Keystone Laboratories. RP 12-22-21
Water Line - Coliform Test 2 Passed 12/23/2021 12/23/2021 12/27/2021
Misc
Informational
12/22/2021
Pulled second samples for Bac T and delivered them to Keystone Laboratories for testing. Still waiting to hear back on the results from the first samples. RP 12-22-21
Misc
Informational
12/27/2021
Samples have passed Bac T testing. RP 12-27-21
Water Line - Construction Inspection Passed 12/27/2021 12/27/2021 12/27/2021
Misc
Informational
09/24/2021
They cut into the existing water main and lowered the section required to place the storm line. Checked with the water dept and the said we have to chlorinate and take Bac T samples, but didn’t need to pressure test the line. RP 9-2-21
Misc
Informational
09/24/2021
All 3 road crossings have been installed. Daniel chlorinated the existing water line where the water had to be relocated to go under the new storm. They will flush and de-chlorinate on saturday and take samples on monday.
Misc
Informational
12/27/2021
All water lines have been installed, passed all testing, flushed and connected. RP 12-27-21
Site Visit Partial 1/1/2022 1/1/2022 02/08/2022
Misc
Informational
10/06/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
10/06/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
10/06/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
10/06/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
10/06/2021
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
10/06/2021
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
10/06/2021
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
10/06/2021
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
10/06/2021
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/08/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Site Visit Partial 2/14/2022 2/14/2022 02/14/2022
Misc
Informational
09/24/2021
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
09/24/2021
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
09/24/2021
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
09/24/2021
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
09/24/2021
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
09/24/2021
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
09/24/2021
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
10/05/2021
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
10/06/2021
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/14/2022
Landscaping was planted along Longview Blvd. Street signage is still needed. No one was on site working today. RP 2-14-22
Sanitary Sewer Construction Inspection Passed 2/14/2022 2/14/2022 02/14/2022
Misc
Informational
08/23/2021
Patrick’s crew from Redford Construction core cut existing manhole 35-572. They also set manhole 5-A1, along with 220 feet of sanitary pipe and service laterals for lots 134 and 138. RP 7-13-21
Misc
Informational
08/23/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/23/2021
Patrick’s crew set manholes 5-A2 and 5-A3. They also laid over 200 feet of sanitary pipe. RP 7-14-21
Misc
Informational
08/23/2021
Patrick’s crew set manhole 5-B. They also laid 250 feet of sanitary pipe. RP 7-15-21
Misc
Informational
08/23/2021
Patrick’s crew set service laterals for lots 153, 154 and 137. They also laid 100 feet of sanitary pipe for line 5-C. RP 7-16-21
Misc
Informational
08/23/2021
MH C-1 has been installed and the crew was working towards C-2 they are also working on the service lines for 152 and 151. They were doing some backfilling for some of the previous service lines that were installed.
Misc
Informational
08/23/2021
Patrick’s crew core cut in existing manhole 35-573. They also laid 50 feet of sanitary pipe and service laterals for lots 144 and 145. RP 7-20-21
Misc
Informational
08/23/2021
Patrick’s crew set MH 5D-1 and service laterals for lots 145, 146, 143, 142 and 147. Jarrod’s crew core cut existing MH 35-574 and laid 50 feet of sanitary pipe. RP 7-21-21
Misc
Informational
08/23/2021
Patrick’s crew poured inverts for 5-D1, 5-C1, 5-C2, 5-A1, 5-A2, 5-A3, 5-B1. They started stacking MH’s. Jarrod’s crew laid 150 feet of sanitary pipe. They set MH 6-D1 and service laterals for lots 167, 168, 169 and 170. RP 7-22-21
Misc
Informational
08/23/2021
Cones and barrel sections were delivered today. Jarrod’s crew laid service laterals for lots 171, 172 and 173. Both crews poured trench checks for all service laterals on lines 6B, 5B, 5C, 5D and 5A. They stacked MH’s and back filled the rest of the day. RP 7-23-21
Misc
Informational
08/23/2021
Jarrod’s crew laid 225 feet of sanitary pipe out of MH 5B-1 to MH 6A-1. Patrick’s crew laid service laterals for lots 160, 161, 162, 163, 209 and 210. RP 7-26-21
Misc
Informational
08/23/2021
Patrick’s crew laid 200 feet of sanitary pipe and MH 6C-1. They also laid service laterals for lots 178, 179, 208 and 207. Jarrod’s crew also laid 200 feet of sanitary pipe and MH 6A-3. They also laid service laterals for lots 164, 165, 166, 174, 175, 176 and 177. RP 7-27-21
Misc
Informational
08/23/2021
Patrick’s crew laid 150 feet of sanitary pipe and set MH 6C-2. They also laid service laterals for lots 206, 205 and 180. Jarrod’s crew has been back filling and doing compaction testing with KC Testing. RP 7-28-21
Misc
Informational
08/23/2021
Both crews worked on back filling and KC Testing was on site doing compaction testing. Patrick’s crew also laid 50 feet of sanitary pipe out of MH 6C-2. RP 7-29-21
Misc
Informational
08/23/2021
Patrick’s crew laid 250 feet of sanitary pipe and set MH 6C- 3. Jarrod’s crew laid service laterals for lots 204, 203 and 202. RP 7-30-21
Misc
Informational
08/23/2021
Patrick’s crew laid 270 feet of sanitary pipe and set MH’s 6C-4 and 6C-5. Jarrod’s crew laid 150 feet of sanitary pipe and set MH 6D-1. RP 8-2-21
Misc
Informational
08/23/2021
Cityview training with Tom Taylor. RP 8-3-21
Misc
Informational
08/23/2021
Patrick’s crew laid service laterals for lots 201, 200, 199, 198, 197, 196, 195, 194, 193, 190 and 189. Jarrod’s crew broke rock all day on D line. RP 8-3-21
Misc
Informational
08/23/2021
Patrick’s crew laid 110 feet of sanitary pipe and set MH 6-E1 and service laterals for lots 191 and 192. Jarrod’s crew finally got out of rock. They laid 100 feet of sanitary pipe. They also set MH 6-D1 and service laterals for lots 184, 183, 182 and 181. RP 8-4-21
Misc
Informational
08/23/2021
Patrick’s crew back filled sanitary lines 6C and 6E. Jarrod’s crew laid service laterals for lots 188, 187, 186 and 185. They also back filled sanitary line 6D. Lines still need to have compaction testing done on them. RP 8-5-21
Misc
Informational
08/23/2021
Jarrod’s crew worked with KC Testing doing compaction testing on sanitary lines 6C, 6D, and 6E. Sanitary testing for 6th plat can begin in 30 days. Storm line 200 needs to go in before they can complete sanitary line 5A. RP 8-6-21
Misc
Informational
08/23/2021
Jarrod’s crew laid 300 feet of sanitary pipe and set MH 5-A4. RP 8-18-21
Misc
Informational
08/23/2021
They laid 50 feet of sanitary pipe and service laterals for lots 159, 158, 157 and 156. They also set MH 5-A5. RP 8-19-21
Misc
Informational
08/23/2021
They laid service lateral for lot 155. All that remains is compaction testing to start the 30 day clock. RP 8-20-21
Misc
Informational
08/23/2021
KC Testing was on site doing compaction testing on the last of line 5-A. RP 8-23-21
Misc
Informational
02/14/2022
An agreement between the city and the contractor was reached concerning the wyes on the main line. Everything has been installed and tested. RP 2-14-22
Site Visit Partial 2/17/2022 2/17/2022 02/21/2022
Misc
Informational
02/14/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
02/14/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
02/14/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
02/14/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
02/14/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
02/14/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
02/14/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
02/14/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
02/14/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/14/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Site Visit Partial 2/22/2022 2/22/2022 02/23/2022
Misc
Informational
02/21/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
02/21/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
02/21/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
02/21/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
02/21/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
02/21/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
02/21/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
02/21/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
02/21/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/21/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/23/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Record Drawing Review Partial 3/1/2022 02/23/2022
Misc
Corrective Action Required
02/23/2022
Water just needs tracer wire test. Sanitary manhole 5-B1 needs raised to grade. Sanitary needs tracer wire test too. Storm junction boxes 103 and 202 need to be raised to grade. Junction box 402 has wrong casting lid. Field inlet 100B needs the area around it graded to determine correct elevation. End section 200 needs silt cleaned out. Couldn’t locate junction box 304. Lifting straps on structures need to be removed and structures grouted. RP 2-23-22
Site Visit Partial 2/25/2022 2/25/2022 02/25/2022
Misc
Informational
02/23/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
02/23/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
02/23/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
02/23/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
02/23/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
02/23/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
02/23/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
02/23/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
02/23/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/23/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
02/23/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/23/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Site Visit Partial 2/28/2022 2/28/2022 03/01/2022
Misc
Informational
02/25/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
02/25/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
02/25/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
02/25/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
02/25/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
02/25/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
02/25/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
02/25/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
02/25/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
02/25/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
02/25/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/25/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/01/2022
No work being done on site today. RP 3-1-22
Site Visit Partial 3/3/2022 3/3/2022 03/03/2022
Misc
Informational
03/01/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/01/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/01/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/01/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/01/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/01/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/01/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/01/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/01/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/01/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/01/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/01/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/01/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/01/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/03/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Site Visit Partial 3/7/2022 3/7/2022 03/04/2022
Misc
Informational
03/03/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/03/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/03/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/03/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/03/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/03/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/03/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/03/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/03/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/03/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/03/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/03/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/03/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/03/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/03/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/04/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Site Visit Partial 03/14/2022
Misc
Informational
03/04/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/04/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/04/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/04/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/04/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/04/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/04/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/04/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/04/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/04/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/04/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/04/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/04/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/04/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/04/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/04/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/14/2022
No work being done on site. RP 3-10-22
Site Visit Partial 03/14/2022
Misc
Informational
03/14/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/14/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/14/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/14/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/14/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/14/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/14/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/14/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/14/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/14/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/14/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/14/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/14/2022
No work being done on site. RP 3-10-22
Misc
Informational
03/14/2022
No work being done on site. RP 3-14-22
ADA Inspection Partial 3/15/2022 3/15/2022 03/15/2022
Misc
Informational
03/15/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
ADA Inspection Partial 3/16/2022 3/16/2022 03/17/2022
Misc
Informational
03/15/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
03/17/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Site Visit Partial 3/21/2022 3/21/2022 03/18/2022
Misc
Informational
03/14/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/14/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/14/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/14/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/14/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/14/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/14/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/14/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/14/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/14/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/14/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/14/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/14/2022
No work being done on site. RP 3-10-22
Misc
Informational
03/14/2022
No work being done on site. RP 3-14-22
Misc
Informational
03/18/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Site Visit Partial 3/21/2022 3/21/2022 03/21/2022
Misc
Informational
03/18/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/18/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/18/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/18/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/18/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/18/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/18/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/18/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/18/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/18/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/18/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/18/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/18/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/18/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/18/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/18/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/18/2022
No work being done on site. RP 3-10-22
Misc
Informational
03/18/2022
No work being done on site. RP 3-14-22
Misc
Informational
03/18/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
03/21/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
ADA Inspection Partial 3/24/2022 3/24/2022 03/21/2022
Misc
Informational
03/17/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
03/17/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
03/21/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Site Visit Partial 3/22/2022 3/22/2022 03/22/2022
Misc
Informational
03/21/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/21/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/21/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/21/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/21/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/21/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/21/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/21/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/21/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/21/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/21/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/21/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/21/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/21/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/21/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/21/2022
No work being done on site. RP 3-10-22
Misc
Informational
03/21/2022
No work being done on site. RP 3-14-22
Misc
Informational
03/21/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
03/21/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
03/22/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Erosion Control Inspection Partial 03/23/2022
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Erosion Control Inspection Partial 03/24/2022
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
ADA Inspection Partial 3/24/2022 3/24/2022 03/28/2022
Misc
Informational
03/21/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
03/21/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
03/21/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
03/28/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
ADA Inspection Partial 3/29/2022 3/29/2022 03/29/2022
Misc
Informational
03/28/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
03/28/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
03/28/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
03/28/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
03/29/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Record Drawing Review Failed 3/29/2022 3/29/2022 03/29/2022
Misc
Corrective Action Required
02/23/2022
Water just needs tracer wire test. Sanitary manhole 5-B1 needs raised to grade. Sanitary needs tracer wire test too. Storm junction boxes 103 and 202 need to be raised to grade. Junction box 402 has wrong casting lid. Field inlet 100B needs the area around it graded to determine correct elevation. End section 200 needs silt cleaned out. Couldn’t locate junction box 304. Lifting straps on structures need to be removed and structures grouted. RP 2-23-22
Misc
Corrective Action Required
03/29/2022
Sanitary manhole 5-B1 is good along with storm structures 103, 202, 402 and 304. Field inlet 100-B still needs to be graded around the structure. End section 200 and field inlet 305 need excess silt deposits cleaned out. RP 3-29-22
ADA Inspection Partial 3/30/2022 3/30/2022 04/04/2022
Misc
Informational
03/29/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
03/29/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
03/29/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
03/29/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
03/29/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/04/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Erosion Control Inspection Failed 04/04/2022
Misc
Informational
03/24/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
04/04/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Install Street and Stop Signs Partial 4/5/2022 4/5/2022 04/07/2022
Misc
Corrective Action Required
04/07/2022
All street signage needs spacer added between roadway signage and plastic washers behind the metal washers. RP 4-7-22
Site Visit Partial 3/23/2022 3/23/2022 04/07/2022
Misc
Informational
03/22/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
03/22/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
03/22/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
03/22/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
03/22/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
03/22/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
03/22/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
03/22/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
03/22/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
03/22/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
03/22/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/22/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
03/22/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/22/2022
No work being done on site today. RP 3-1-22
Misc
Informational
03/22/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
03/22/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
03/22/2022
No work being done on site. RP 3-10-22
Misc
Informational
03/22/2022
No work being done on site. RP 3-14-22
Misc
Informational
03/22/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
03/22/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
03/22/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/07/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Site Visit Partial 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/07/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/07/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/07/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/07/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/07/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/07/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/07/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/07/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/07/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/07/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/07/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/07/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/07/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/07/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/07/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/07/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/07/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/07/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/07/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/07/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/07/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/07/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/08/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Erosion Control Inspection Failed 4/7/2022 4/7/2022 04/08/2022
Misc
Informational
04/04/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
04/04/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
04/04/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
04/08/2022
Curb inlets are still full of silt. RP 4-8-22
Site Visit Partial 4/11/2022 4/11/2022 04/11/2022
Misc
Informational
04/08/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/08/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/08/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/08/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/08/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/08/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/08/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/08/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/08/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/08/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/08/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/08/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/08/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/08/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/08/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/08/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/08/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/08/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/08/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/08/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/08/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/08/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/08/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/11/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Erosion Control Inspection Partial 04/11/2022
Misc
Informational
04/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
04/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
04/08/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
04/08/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/11/2022
Curb inlets have been cleaned out. RP 4-11-22
Grading/Excavation/Fill Inspection Partial 04/11/2022
Misc
Informational
04/11/2022
Spalding is on site working on grading. RP 4-11-22
ADA Inspection Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/04/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
04/04/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
04/04/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/04/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
04/04/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/04/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Misc
Informational
04/12/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-12-22
Site Visit Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/11/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/11/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/11/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/11/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/11/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/11/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/11/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/11/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/11/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/11/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/11/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/11/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/11/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/11/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/11/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/11/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/11/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/11/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/11/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/11/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/11/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/11/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/11/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/11/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/12/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Site Visit Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/12/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/12/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/12/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/12/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/12/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/12/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/12/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/12/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/12/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/12/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/12/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/12/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/12/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/12/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/12/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/12/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/12/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/12/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/12/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/12/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/12/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/12/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/12/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/12/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/12/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/13/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Site Visit Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/13/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/13/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/13/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/13/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/13/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/13/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/13/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/13/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/13/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/13/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/13/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/13/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/13/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/13/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/13/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/13/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/13/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/13/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/13/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/13/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/13/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/13/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/13/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/13/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/13/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/13/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/14/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
ADA Inspection Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/12/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
04/12/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
04/12/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/12/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
04/12/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/12/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Misc
Informational
04/12/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-12-22
Misc
Informational
04/14/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-14-22
Record Drawing Review Passed 4/5/2022 04/15/2022
Misc
Corrective Action Required
03/29/2022
Water just needs tracer wire test. Sanitary manhole 5-B1 needs raised to grade. Sanitary needs tracer wire test too. Storm junction boxes 103 and 202 need to be raised to grade. Junction box 402 has wrong casting lid. Field inlet 100B needs the area around it graded to determine correct elevation. End section 200 needs silt cleaned out. Couldn’t locate junction box 304. Lifting straps on structures need to be removed and structures grouted. RP 2-23-22
Misc
Corrective Action Required
03/29/2022
Sanitary manhole 5-B1 is good along with storm structures 103, 202, 402 and 304. Field inlet 100-B still needs to be graded around the structure. End section 200 and field inlet 305 need excess silt deposits cleaned out. RP 3-29-22
Misc
Informational
04/15/2022
Record drawings are good. Excess silt clean up will be added to the punch list. RP 4-15-22
Install Street and Stop Signs Passed 04/15/2022
Misc
Corrective Action Required
04/07/2022
All street signage needs spacer added between roadway signage and plastic washers behind the metal washers. RP 4-7-22
Misc
Informational
04/15/2022
Spacers and washers have been added to all signage. RP 4-15-22
ADA Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/14/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
04/14/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
04/14/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/14/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
04/14/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/14/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Misc
Informational
04/14/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-12-22
Misc
Informational
04/14/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-14-22
Misc
Informational
04/15/2022
JK Concrete formed and poured another 20 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-15-22
Site Visit Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/14/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/14/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/14/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/14/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/14/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/14/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/14/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/14/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/14/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/14/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/14/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/14/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/14/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/14/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/14/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/14/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/14/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/14/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/14/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/14/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/14/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/14/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/14/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/14/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/14/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
04/15/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Erosion Control Inspection Partial 04/15/2022
Misc
Informational
04/11/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
04/11/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
04/11/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
04/11/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/11/2022
Curb inlets have been cleaned out. RP 4-11-22
Misc
Informational
04/15/2022
Welch Erosion was on site installing silt fencing. RP 4-15-22
Grading/Excavation/Fill Inspection Partial 04/15/2022
Misc
Informational
04/11/2022
Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/15/2022
Spalding still on site back filling. RP 4-15-22
Site Visit Partial 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/15/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/15/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/15/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/15/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/15/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/15/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/15/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/15/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/15/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/15/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/15/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/15/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/15/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/15/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/15/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/15/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/15/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/15/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/15/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/15/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/15/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/15/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/15/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/15/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/15/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/15/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/15/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
04/15/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Misc
Informational
04/18/2022
Didn’t see anybody on site working today. RP 4-18-22
Site Visit Partial 4/19/2022 4/19/2022 04/19/2022
Misc
Informational
04/18/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/18/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/18/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/18/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/18/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/18/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/18/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/18/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/18/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/18/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/18/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/18/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/18/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/18/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/18/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/18/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/18/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/18/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/18/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/18/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/18/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/18/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/18/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/18/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/18/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/18/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
04/18/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Misc
Informational
04/18/2022
Didn’t see anybody on site working today. RP 4-18-22
Misc
Informational
04/19/2022
Spalding on site back filling. Evergy contractors also on site laying conduit. 4-19-22
Site Visit Partial 4/20/2022 4/20/2022 04/21/2022
Misc
Informational
04/19/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/19/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/19/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/19/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/19/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/19/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/19/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/19/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/19/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/19/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/19/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/19/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/19/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/19/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/19/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/19/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/19/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/19/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/19/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/19/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/19/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/19/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/19/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/19/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/19/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/19/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/19/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
04/19/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Misc
Informational
04/19/2022
Didn’t see anybody on site working today. RP 4-18-22
Misc
Informational
04/19/2022
Spalding on site back filling. Evergy contractors also on site laying conduit. 4-19-22
Misc
Informational
04/21/2022
Spalding still back filling and JK Concrete formed and poured more sidewalks. They need to patch up around the curb inlet at Longview and 12th. RP 4-21-22
ADA Inspection Partial 4/18/2022 4/18/2022 04/21/2022
Misc
Informational
04/15/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
04/15/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
04/15/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/15/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
04/15/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/15/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Misc
Informational
04/15/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-12-22
Misc
Informational
04/15/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-14-22
Misc
Informational
04/15/2022
JK Concrete formed and poured another 20 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-15-22
Misc
Informational
04/21/2022
JK Concrete formed and poured more sidewalks. They need to patch up around the curb inlet at Longview and 12th. RP 4-21-22
Erosion Control Inspection Partial 05/24/2022
Misc
Informational
04/15/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
04/15/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
04/15/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
04/15/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/15/2022
Curb inlets have been cleaned out. RP 4-11-22
Misc
Informational
04/15/2022
Welch Erosion was on site installing silt fencing. RP 4-15-22
Misc
Corrective Action Required
05/24/2022
Need erosion control installed around all ADA ramp/sidewalks as mud and silt are building up and washing into roadways at these locations. 5/24/22 ES
Site Visit Partial 4/22/2022 06/15/2022
Misc
Informational
04/21/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
04/21/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
04/21/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
04/21/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
04/21/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
04/21/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
04/21/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
04/21/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
04/21/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
04/21/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
04/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/21/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
04/21/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/21/2022
No work being done on site today. RP 3-1-22
Misc
Informational
04/21/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
04/21/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
04/21/2022
No work being done on site. RP 3-10-22
Misc
Informational
04/21/2022
No work being done on site. RP 3-14-22
Misc
Informational
04/21/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
04/21/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/21/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/21/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
04/21/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
04/21/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
04/21/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
04/21/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
04/21/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
04/21/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Misc
Informational
04/21/2022
Didn’t see anybody on site working today. RP 4-18-22
Misc
Informational
04/21/2022
Spalding on site back filling. Evergy contractors also on site laying conduit. 4-19-22
Misc
Informational
04/21/2022
Spalding still back filling and JK Concrete formed and poured more sidewalks. They need to patch up around the curb inlet at Longview and 12th. RP 4-21-22
Misc
Informational
06/15/2022
Redford was on site working on sealing around the metal plate on outside of storm outlet structure in basin. Epoxy sealing around that plate and the pipe for the skimmer. 6/13/22 ES
Storm - Outlet Structure Partial 07/14/2022
Misc
Informational
07/14/2022
Met with Kyle, Travis from Summit Homes and RE from Redford. Decision was made to shorten the skimmer pipe, dig a sump hole for it to rest/sit in allowing more water to drain then what is presently draining. Also waiting on grates to be completed to install in open face structure. Once basin is converted back from silt to detention and skimmer is removed will need work done around plate. The bottom 2 drain holes that have bolts in them have been covered with grout or concrete and will need to be opened back up allowing all 8 drain holes to function as intended. 7/14/22 ES
Erosion Control Inspection Partial 08/08/2022
Misc
Informational
05/24/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
05/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
05/24/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
05/24/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
05/24/2022
Curb inlets have been cleaned out. RP 4-11-22
Misc
Informational
05/24/2022
Welch Erosion was on site installing silt fencing. RP 4-15-22
Misc
Informational
08/08/2022
Need erosion control installed around all ADA ramp/sidewalks as mud and silt are building up and washing into roadways at these locations. 5/24/22 ES Erosion control measures installed and functioning. 8/8/22 ES
Site Visit Partial 08/08/2022
Misc
Informational
06/15/2022
Met on site for a pre-construction meeting. RP 5-4-21
Misc
Informational
06/15/2022
Met on site with RE and Thomas from Redford to discuss erosion control and the game plan on starting work. RP 6-8-21
Misc
Informational
06/15/2022
Only work being done this week was Braik Brothers mulched up all the trees that Spalding cleared out on the site. RP 7-9-21
Misc
Informational
06/15/2022
Patrick’s crew from Redford set a temporary structure in the temporary basin. It appears that the permanent structure and pipes will interfere with the existing water main. I asked them to have the engineers take another look at it. RP 7-12-21
Misc
Informational
06/15/2022
Water did construction taps on the existing water line today, so they can chlorinate and take Bac T samples. RP 9-16-21
Misc
Informational
06/15/2022
They just cleaned up the job site for the weekend. RP 9-17-21
Misc
Informational
06/15/2022
lDaniel chlorinated the existing water line that had to be dropped so it would go under the storm line that was being installed. They will flush the line over the weekend and take samples on Monday.
Misc
Informational
06/15/2022
No work going on yesterday and today. Will do sanitary testing on Thursday.
Misc
Informational
06/15/2022
No work has been going on, waiting on getting the road ready for subgrade.
Misc
Informational
06/15/2022
No work being done. Still needs roadway signage installed. RP 2-8-22
Misc
Informational
06/15/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
06/15/2022
Checked on record drawings. Still needs sidewalks, ADA ramps and street signage. RP 2-23-22
Misc
Informational
06/15/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
06/15/2022
No work being done on site today. RP 3-1-22
Misc
Informational
06/15/2022
Meet Clifford from Redford Construction on site for testing tracer wires, but he didn’t know how to work the equipment. RP 3-3-22
Misc
Informational
06/15/2022
John from Redford Construction came out to do tracer wire testing. Both water and sanitary passed testing. RP 3-4-22
Misc
Informational
06/15/2022
No work being done on site. RP 3-10-22
Misc
Informational
06/15/2022
No work being done on site. RP 3-14-22
Misc
Informational
06/15/2022
No work being done today. Spalding had aggregate placed in sidewalk area they had cut out. 3/18/22 ES
Misc
Informational
06/15/2022
JK Concrete is on site this morning. They poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
06/15/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/15/2022
Spalding is on site working on grading. No other work is being done on site today. RP 4-7-22
Misc
Informational
06/15/2022
Nobody on site working today. Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
06/15/2022
Curb inlets have been cleaned out. Spalding is on site working on grading. RP 4-11-22
Misc
Informational
06/15/2022
JK Concrete formed and poured more sidewalk and Spalding was on site back filling and grading. RP 4-12-22
Misc
Informational
06/15/2022
It was too muddy for JK Concrete to work on sidewalks today. Spalding still on site back filling. RP 4-13-22
Misc
Informational
06/15/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. Spalding was also on site doing back filling. RP 4-14-22
Misc
Informational
06/15/2022
JK Concrete formed and poured more sidewalks. Spalding still on site back filling. Welch Erosion was also on site installing silt fencing. RP 4-15-22
Misc
Informational
06/15/2022
Didn’t see anybody on site working today. RP 4-18-22
Misc
Informational
06/15/2022
Spalding on site back filling. Evergy contractors also on site laying conduit. 4-19-22
Misc
Informational
06/15/2022
Spalding still back filling and JK Concrete formed and poured more sidewalks. They need to patch up around the curb inlet at Longview and 12th. RP 4-21-22
Misc
Informational
06/15/2022
Redford was on site working on sealing around the metal plate on outside of storm outlet structure in basin. Epoxy sealing around that plate and the pipe for the skimmer. 6/13/22 ES No additional work has been done to basin or skimmer. Redford was waiting on the coated bars that will go across the opening of inlet structure to do all work. 8/8/22 ES
Storm - Outlet Structure Partial 08/15/2022
Misc
Informational
07/14/2022
Met with Kyle, Travis from Summit Homes and RE from Redford. Decision was made to shorten the skimmer pipe, dig a sump hole for it to rest/sit in allowing more water to drain then what is presently draining. Also waiting on grates to be completed to install in open face structure. Once basin is converted back from silt to detention and skimmer is removed will need work done around plate. The bottom 2 drain holes that have bolts in them have been covered with grout or concrete and will need to be opened back up allowing all 8 drain holes to function as intended. 7/14/22 ES Skimmer pipe has not been shortened. The grate across front of inlet structure was installed. 8/12/22 ES
Erosion Control Inspection Partial 08/15/2022
Misc
Informational
08/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
08/08/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
08/08/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
08/08/2022
Curb inlets have been cleaned out. RP 4-11-22
Misc
Informational
08/08/2022
Welch Erosion was on site installing silt fencing. RP 4-15-22
Misc
Informational
08/08/2022
Need erosion control installed around all ADA ramp/sidewalks as mud and silt are building up and washing into roadways at these locations. 5/24/22 ES Erosion control measures installed and functioning. 8/8/22 ES Erosion control measures installed and functioning. 8/15/22 ES
ESC - (Vegetation/Ground Cover) Partial 08/15/2022
Misc
Informational
08/15/2022
Vegetation has been established in most areas of project. Erosion control measures still intact where needed to help maintain. 8/15/22 ES
ADA Inspection Partial 4/25/2022 4/25/2022 09/09/2022
Misc
Informational
04/21/2022
JK Concrete was on site forming up ADA ramps and sidewalks. Talked with Shane about not using wings on the ramps. I also gave them a printout of our city details concerning ramps and sidewalks. Brian from Spalding was also there grading Longview Blvd for it’s sidewalk. RP 3-15-22
Misc
Informational
04/21/2022
JK Concrete finished pulling frames from their ADA ramps yesterday. Spalding was grading Longview Blvd and placing gravel for sidewalk. 3-16-22 ES
Misc
Informational
04/21/2022
JK Concrete is on site this morning and poured ADA ramps on Fiord. They are also setting up forms along Longview Blvd. RP 3-21-22
Misc
Informational
04/21/2022
They poured 32 cubic yards of 4K KCMMB mix for ramps and sidewalks today along Longview Blvd. RP 3-28-22
Misc
Informational
04/21/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for sidewalks and ADA ramps. RP 3-29-22
Misc
Informational
04/21/2022
JK Concrete poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-4-22
Misc
Informational
04/21/2022
JK Concrete poured another 30 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-12-22
Misc
Informational
04/21/2022
JK Concrete formed and poured another 40 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-14-22
Misc
Informational
04/21/2022
JK Concrete formed and poured another 20 cubic yards of 4K KCMMB mix for the sidewalks. RP 4-15-22
Misc
Informational
04/21/2022
JK Concrete formed and poured more sidewalks. They need to patch up around the curb inlet at Longview and 12th. RP 4-21-22 All ADA ramps poured and in to spec.
Erosion Control Inspection Partial 10/03/2022
Misc
Informational
08/15/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/15/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Corrective Action Required
08/15/2022
Curb and field inlets are full of silt and there is excess silt in the roadways. RP 4-4-22
Misc
Corrective Action Required
08/15/2022
Curb inlets are still full of silt. RP 4-8-22
Misc
Informational
08/15/2022
Curb inlets have been cleaned out. RP 4-11-22
Misc
Informational
08/15/2022
Welch Erosion was on site installing silt fencing. RP 4-15-22
Misc
Informational
08/15/2022
Need erosion control installed around all ADA ramp/sidewalks as mud and silt are building up and washing into roadways at these locations. 5/24/22 ES Erosion control measures installed and functioning. 8/8/22 ES Erosion control measures installed and functioning. 8/15/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES
Storm - Outlet Structure Partial 10/03/2022
Misc
Informational
08/15/2022
Met with Kyle, Travis from Summit Homes and RE from Redford. Decision was made to shorten the skimmer pipe, dig a sump hole for it to rest/sit in allowing more water to drain then what is presently draining. Also waiting on grates to be completed to install in open face structure. Once basin is converted back from silt to detention and skimmer is removed will need work done around plate. The bottom 2 drain holes that have bolts in them have been covered with grout or concrete and will need to be opened back up allowing all 8 drain holes to function as intended. 7/14/22 ES Skimmer pipe has not been shortened. The grate across front of inlet structure was installed. 8/12/22 ES Skimmer pipe still has not been adjusted. Basin is about the driest it has been in months. 10/3/22 ES
Documents & Images
Date Uploaded File Type Document Name
03/26/2021 Receipt Receipt for transaction: 2021-001555
04/14/2021 Letter DE-Permit
04/15/2021 Approved Plans Highland Meadows 5th Plat - Erosion Control Plans Approved 4.15.21
04/16/2021 Approved Plans Highland Meadows 5th Plat - Sanitary Sewer Plans Approved 4.15.21
04/16/2021 Approved Plans Highland Meadows 5th Plat - Street Storm Erosion Control Approved 4.15.21
04/16/2021 Approved Plans Highland Meadows 5th Plat - Water Main Plans Approved 4.15.21
05/04/2021 Letter INSPECTION SUMMARY
06/08/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/19/2021 Letter DE-Daily Inspection Summary
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter INSPECTION SUMMARY
07/27/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter INSPECTION SUMMARY
08/09/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/16/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Approved Plans Existing Water Main Relocation - Highland Meadows 5th Plat Approved
08/27/2021 Letter INSPECTION SUMMARY
09/02/2021 Letter INSPECTION SUMMARY
09/13/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/16/2021 Letter INSPECTION SUMMARY
09/16/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
09/29/2021 Letter INSPECTION SUMMARY
09/29/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/19/2021 Letter INSPECTION SUMMARY
10/19/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
11/06/2021 Letter INSPECTION SUMMARY
11/06/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
11/17/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/18/2021 Letter INSPECTION SUMMARY
12/18/2021 Letter INSPECTION SUMMARY
12/18/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
12/23/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/21/2022 Letter INSPECTION SUMMARY
02/21/2022 Plans Highland Meadows 5th Plat C102- Sanitary Sewer Plans Approved As-Built
02/21/2022 Plans Highland Meadows 5th Plat C103 - Sanitary Sewer Plans Approved As-Built
02/21/2022 Plans Highland Meadows 5th Plat C203- Street Storm Erosion Control As-Built
02/21/2022 Plans Highland Meadows 5th Plat C204- Street Storm Erosion Control As-Built
02/21/2022 Plans Highland Meadows 5th Plat C205 - Street Storm Erosion Control As-Built
02/21/2022 Plans Highland Meadows 5th Plat C101- Water Main Plans Approved AS-BUILT
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/25/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
03/24/2022 Plans Highland Meadows 5th Plat - Water Main Asbuilts_Rev1_2022-03-24
03/24/2022 Plans Highland Meadows 5th Plat - Sanitary Sewer Asbuilts_Rev1_2022-03-24
03/24/2022 Plans Highland Meadows 5th Plat - Master Drainage Asbuilts_Rev0_2022-03-24
03/24/2022 Plans Highland Meadows 5th Plat - Street Storm Erosion Control Asbuilts_Rev1_2022-03-24
03/28/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter DE-Certificate of Substantial Completion Single Lot
06/15/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter DE-Certificate of Substantial Completion Single Lot
06/28/2022 Letter DE-Punch List
07/14/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/12/2022 Security Document Highland Meadows 5th Plat Maintenance Bond
10/03/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
11/18/2022 Photograph HM - Detention Basin Plate 2
11/18/2022 Photograph HM - Detention Basin Plate 5
11/18/2022 Photograph HM - Detention Basin 10
11/18/2022 Photograph HM - Detention Basin 9
11/18/2022 Photograph HM - Detention Basin Plate 4
11/18/2022 Photograph HM - Detention Basin 8
11/18/2022 Photograph HM - Detention Basin 1
11/18/2022 Photograph HM - Detention Basin Plate 1
11/18/2022 Photograph HM - Detention Basin 11
11/18/2022 Photograph HM - Detention Basin 2
11/18/2022 Photograph HM - Detention Basin Plate plugged 1
11/18/2022 Photograph HM - Detention Basin Plate plugged 5
11/18/2022 Photograph HM - Detention Basin Plate 3
11/18/2022 Photograph HM - Detention Basin 4
11/18/2022 Photograph HM - Detention Basin Plate plugged 2
11/18/2022 Photograph HM - Detention Basin 3
11/18/2022 Photograph HM - Detention Basin Plate plugged 3
11/18/2022 Photograph HM - Detention Basin Plate plugged 4
11/18/2022 Photograph HM - Detention Basin 5
11/18/2022 Photograph HM - Detention Basin 6
11/18/2022 Photograph HM - Detention Basin 7
02/16/2023 Activity Document Highland Meadows 5th 6th Final Affidavits
07/24/2023 Letter DE-Certificate of Final Acceptance (Commercial)
03/31/2025 Letter PW ROW Inspections Report
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home