Permit Application Status

PRSUBD20192551


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20192551
Public Infrastructure
Final Acceptance
METCALF BANK
DEVELOPMENT COMPLETE
THE PRINCETON - PUBLIC WATER LINE
09/09/2019
01/29/2020
05/27/2024
03/07/2023
Locations
Contacts
METCALF BANK, Address:609 NE 291 HWY  
O'REILLY BUILD LLC, Address:5051 S NATIONAL AVE STE 4-110, Phone:(417) 862-9500  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/09/2019 12/20/2019
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $7,692.54 $7,692.54 Paid 09/09/2019
Water Test Fee $600.00 $600.00 Paid 09/09/2019
Right of Way Permit Fee $80.00 $80.00 Paid 09/09/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water - Material Verification Passed 1/31/2020 01/31/2020
Water Line - Construction Inspection Partial 1/31/2020 01/31/2020
Informational
01/31/2020
Contractor hsas installed approximately 1300' of 12" PVC Public water main was installed from 1/2/20 to 1/30/20. Fittings were installed as-per plans Sheet W2.6,W2.5, & W2.4. There have been inclement weather that has slowed progress throughout the month of January. Contractor will continue to install 12" PVC Public water main.
Water Line - Construction Inspection Partial 1/31/2020 01/31/2020
Informational
01/31/2020
Contractor installed approximately 240' of 12" PVC water main. Water main was backfilled.
Water Line - Fire Hydrant Partial 1/31/2020 01/31/2020
Informational
01/31/2020
The lower half hydrant assembly was installed @Sta. 35+14.35 on 1/08/20 & Sta. 30+14.39 1/28/20.
Water Line - Valve Partial 1/31/2020 02/03/2020
Misc
Informational
02/03/2020
Contractor installed 12” Butterfly Valve on 1/28/20 @ Sta. 29+99.69.
Water Line - Valve Partial 02/04/2020
Misc
Informational
02/03/2020
Contractor installed 12” Butterfly Valve on 1/28/20 Sta. 30+00.
Miscellaneous Correction
Informational
02/04/2020
Contractor installed 12” Butterfly Valves on 2/4/20 Sta. 22++02.39 & 21+35.66 .
Water Line - Construction Inspection Partial 2/10/2020 02/10/2020
Informational
02/10/2020
Contractor installed approximately 300' of 12 PVC water main 2/10/20 as per plans from Sta 17+80 to 14+80 on Public water main Line 1.
Water Line - Valve Partial 02/11/2020
Misc
Informational
02/04/2020
Contractor installed 12” Butterfly Valve on 1/28/20 Sta. 30+00.
Miscellaneous Correction
Informational
02/04/2020
Contractor installed 12” Butterfly Valves on 2/4/20 Sta. 22++02.39 & 21+35.66 .
Informational
02/11/2020
Installed on 2/7/20 Butterfly valve at Sta. 22+02.39 & 21+35.66 on 12" water valve Line 1.
Water Line - Valve Partial 02/11/2020
Misc
Informational
02/11/2020
Contractor installed 12” Butterfly Valve on 1/28/20 Sta. 30+00.
Misc
Informational
02/11/2020
Contractor installed 12” Butterfly Valve on 2/11/20 Sta. 13+14.86 on Line 1.
Water Line - Construction Inspection Partial 02/11/2020
Misc
Informational
02/11/2020
Approximately 300’ of 12” water main Line 1 from Sta. 13+80 around 10+80 .
Water Line - Construction Inspection Passed 02/19/2020
Misc
Informational
02/11/2020
Approximately 300’ of 12” water main Line 1 from Sta. 13+80 around 10+80 .
Misc
Informational
02/19/2020
CP contractor has installed fire hydrant & 6/bends and a 12” butterfly valve per project plans sheet W2.1. Sta. 10+80 to Sta 10+50.
Water Line - Construction Inspection Partial 02/21/2020
Misc
Informational
02/21/2020
Water pipe encasement concrete will be onsite around 5:00 pm. Contractor will take pictures of water pipe encasement for files and reports.
Water Line - Construction Inspection Partial 02/28/2020
Misc
Informational
02/21/2020
Water pipe encasement concrete will be onsite around 5:00 pm. Contractor will take pictures of water pipe encasement for files and reports.
Misc
Informational
02/28/2020
Contractor ( CP Constrution) installed approximately 400’ of 8” PVC on line 2 from Sta. 10+00 to 14+05. A 22 deg 8” Bend was installed at Sta. 14+03.82 on (line 2) 2/28/20. Contractor will continue work next week.
Water Line - Construction Inspection Partial 03/04/2020
Misc
Informational
02/28/2020
Water pipe encasement concrete will be onsite around 5:00 pm. Contractor will take pictures of water pipe encasement for files and reports.
Misc
Informational
02/28/2020
Contractor ( CP Constrution) installed approximately 400’ of 8” PVC on line 2 from Sta. 10+00 to 14+05. A 22 deg 8” Bend was installed at Sta. 14+03.82 on (line 2) 2/28/20. Contractor will continue work next week.
Misc
Informational
03/04/2020
Contractor ( CP Constrution) installed approximately 330’ of PVC on line 2 from Sta. 14+05 to 17+35 as per construction plans on 3/2/20 to 3/3/20. 3/4/20 Contractor continued to installation of of 12” and 8” water line by installing risers on Fire Hydrants on Lines 1&2. Contractor will pre construct fittings for tie-in on 20” water main scheduled for 3/5/20.
Water Line - Valve Passed 03/05/2020
Misc
Informational
02/11/2020
Contractor installed 12” Butterfly Valve on 1/28/20 Sta. 30+00.
Misc
Informational
02/11/2020
Contractor installed 12” Butterfly Valve on 2/11/20 Sta. 13+14.86 on Line 1.
Misc
Informational
03/05/2020
Contractor installed 12” Butterfly Valve 0n 3/5/20 @ Sta 10+04 on Line 1. 20” Butterfly Valve was installed on existing main.
Water Line - Construction Inspection Partial 03/05/2020
Misc
Informational
03/05/2020
Tie-in to the 20” existing main 20” & 12” Butterfly Valve, 20”X12” Tee, 2 (2 all steel threads) were bolt to 12” valves, 2/22.5 deg bends. 11’ between 12” valve 22.5 deg bend and 12’ to the second 22.5 deg bend. All fitt were mega lugged.
Misc
Informational
03/05/2020
Thurst blocks were poured behind bends and fire hydrant on 8” Line 2.
Erosion Control Inspection Partial 03/10/2020
Misc
Corrective Action Required
03/10/2020
Silt Fencing needs to be adjusted along Oldham Road.
Water Line - Construction Inspection Partial 03/13/2020
Misc
Informational
03/04/2020
Water pipe encasement concrete will be onsite around 5:00 pm. Contractor will take pictures of water pipe encasement for files and reports.
Misc
Informational
03/04/2020
Contractor ( CP Constrution) installed approximately 400’ of 8” PVC on line 2 from Sta. 10+00 to 14+05. A 22 deg 8” Bend was installed at Sta. 14+03.82 on (line 2) 2/28/20. Contractor will continue work next week.
Misc
Informational
03/04/2020
Contractor ( CP Constrution) installed approximately 330’ of PVC on line 2 from Sta. 14+05 to 17+35 as per construction plans on 3/2/20 to 3/3/20. 3/4/20 Contractor continued to installation of of 12” and 8” water line by installing risers on Fire Hydrants on Lines 1&2. Contractor will pre construct fittings for tie-in on 20” water main scheduled for 3/5/20.
Misc
Informational
03/05/2020
Contractor continues to prepare for hydrostatic test on water main. Contractor will test 12” & 8” water main. Side note a (Justin is no longer the supervisor for the underground structural utilities for the project CP Construction).
Water Line - Hydrostatic Test Passed 03/17/2020
Misc
Informational
03/17/2020
Contractor passed 2hr hydrostatic test from 9:30 am to11:30 am. 12” & 8” was were tested. 3/17/20
Water Line - Construction Inspection Partial 03/17/2020
Misc
Informational
03/13/2020
Tie-in to the 20” existing main 20” & 12” Butterfly Valve, 20”X12” Tee, 2 (2 all steel threads) were bolt to 12” valves, 2/22.5 deg bends. 11’ between 12” valve 22.5 deg bend and 12’ to the second 22.5 deg bend. All fitt were mega lugged.
Misc
Informational
03/13/2020
Thurst blocks were poured behind bends and fire hydrant on 8” Line 2.
Misc
Informational
03/17/2020
Contractor poured straddle block on 8” line 3/13/20. Contractor continued to work Public water line to prepare for testing. Pressure test pass and contractor work to chlorine water main 3/17/20.
Water Line - Construction Inspection Partial 03/20/2020
Misc
Informational
03/17/2020
Tie-in to the 20” existing main 20” & 12” Butterfly Valve, 20”X12” Tee, 2 (2 all steel threads) were bolt to 12” valves, 2/22.5 deg bends. 11’ between 12” valve 22.5 deg bend and 12’ to the second 22.5 deg bend. All fitt were mega lugged.
Misc
Informational
03/17/2020
Thurst blocks were poured behind bends and fire hydrant on 8” Line 2.
Misc
Informational
03/17/2020
Contractor poured straddle block on 8” line 3/13/20. Contractor continued to work Public water line to prepare for testing. Pressure test pass and contractor work to chlorine water main 3/17/20.
Misc
Informational
03/20/2020
After several unsuccessful attempt contractor was able to chlorinate public main water 12” & 8” 3/20/20. Water line will be De-chlorination on 3/23/20.
Water Line - Construction Inspection Partial 03/25/2020
Misc
Informational
03/20/2020
Tie-in to the 20” existing main 20” & 12” Butterfly Valve, 20”X12” Tee, 2 (2 all steel threads) were bolt to 12” valves, 2/22.5 deg bends. 11’ between 12” valve 22.5 deg bend and 12’ to the second 22.5 deg bend. All fitt were mega lugged.
Misc
Informational
03/20/2020
Thurst blocks were poured behind bends and fire hydrant on 8” Line 2.
Misc
Informational
03/20/2020
Contractor poured straddle block on 8” line 3/13/20. Contractor continued to work Public water line to prepare for testing. Pressure test pass and contractor work to chlorine water main 3/17/20.
Misc
Informational
03/20/2020
After several unsuccessful attempt contractor was able to chlorinate public main water 12” & 8” 3/20/20. Water line will be De-chlorination on 3/23/20.
Misc
Informational
03/25/2020
Contractor collected 3 Bacteria Samples to be tested at Blue Valley Lab. Second set of will be done 3/26/20.
Water Line - Construction Inspection Passed 03/07/2023
Misc
Informational
03/25/2020
Tie-in to the 20” existing main 20” & 12” Butterfly Valve, 20”X12” Tee, 2 (2 all steel threads) were bolt to 12” valves, 2/22.5 deg bends. 11’ between 12” valve 22.5 deg bend and 12’ to the second 22.5 deg bend. All fitt were mega lugged.
Misc
Informational
03/25/2020
Thurst blocks were poured behind bends and fire hydrant on 8” Line 2.
Misc
Informational
03/25/2020
Contractor poured straddle block on 8” line 3/13/20. Contractor continued to work Public water line to prepare for testing. Pressure test pass and contractor work to chlorine water main 3/17/20.
Misc
Informational
03/25/2020
After several unsuccessful attempt contractor was able to chlorinate public main water 12” & 8” 3/20/20. Water line will be De-chlorination on 3/23/20.
Misc
Informational
03/25/2020
Contractor collected 3 Bacteria Samples to be tested at Blue Valley Lab. Second set of will be done 3/26/20.
Record Drawing Review Passed 9/26/2022 03/07/2023
Water Line - Coliform Test 1 Passed 03/07/2023
Water Line - Coliform Test 2 Passed 03/07/2023
Documents & Images
Date Uploaded File Type Document Name
09/09/2019 Receipt Receipt for transaction: 2019-006110
01/29/2020 Letter DE-Permit
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter Inspection Summary
02/04/2020 DE-Permit Signed
02/04/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/19/2020 20
02/19/2020 12” BUTTERFLY VALVE
02/19/2020 EXISTING 20” WATER MAIN
02/19/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
02/21/2020 Water main encasement
02/21/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/05/2020 20” TIE-IN
03/05/2020 20” TIE-IN #1
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 image Tie in
03/05/2020 image 22.5 DEG BENDS
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/13/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/20/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
05/27/2021 Letter DE-Punch List
05/27/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
08/08/2022 Maintenance Bond 3 Year
08/08/2022 Final Affidavit and Agreement
09/21/2022 Civil Public - Water
03/07/2023 Letter DE-Certificate of Final Acceptance (Commercial)
03/07/2023 The Princeton Public Water Main Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home